GIMS REDESIGN PROJECT - PowerPoint PPT Presentation

About This Presentation
Title:

GIMS REDESIGN PROJECT

Description:

Title: Iowa DOT GIMS Redesign Project GIMS Data User Overview Author: swonder Last modified by: Karen Carroll Created Date: 11/25/2003 5:51:40 PM Document ... – PowerPoint PPT presentation

Number of Views:96
Avg rating:3.0/5.0
Slides: 16
Provided by: swonder
Learn more at: https://www.iowadot.gov
Category:
Tags: gims | project | redesign

less

Transcript and Presenter's Notes

Title: GIMS REDESIGN PROJECT


1
GIMS REDESIGN PROJECT
2
WHAT IS GIMS?
3
Geographic Information Management System
Attributed Roadway Centerlines
Business Data
4
GIMS Purpose
  • Central business data source
  • Centerline data source
  • Cartographic Support
  • CTAMS Input
  • Support for Planning Activities and Reporting
    Mandates

5
WHY REDESIGN GIMS?
6
Improved Location Data
7
Improved Data to Roadway Association
  • Detail of features located along the roadway will
    increase.
  • Move from capturing number of features (stop
    signs, curves, intersections per segment, etc.)
    to actual location of features.

8
External Data Maintenance
9
User Needs
  • Real Time Data
  • Simplified Map Views
  • Meta Data
  • Added Features
  • Better Synchronized Data
  • Simplified Data Use
  • Private Features

10
Integration with LRS
  • Seamless interface
  • Single environment

11
HOW WILL GIMS BE DIFFERENT?
12
Normalized Data
  • Data are maintained in individual tables,
    limiting data redundancy
  • Attributes describe varying extents along a
    section of roadway
  • Graphic representations of attribute data are
    generated on the fly

13
Less Redundancy in Data Maintenance
  • IRI
  • Surface Types
  • Traffic
  • Location Data

14
Changes in Traditional Outputs
  • Temporal Data
  • Real Time Data
  • External Access to Data
  • Metadata

15
Estimated Timeline
  • July 2004 Proof of Concept for new data model
    completed.
  • July 2005 Ability to maintain current GIMS
    features in new database model.
  • December 2005 New functionality will be added
    to redesigned GIMS.
  • July 2006 Modules will be added for external
    users.
Write a Comment
User Comments (0)
About PowerShow.com