Measure 26 - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

Measure 26

Description:

Title: PowerPoint-Pr sentation Author: Mag. Margit Braun Last modified by: Okt bcov Kate ina Created Date: 2/15/2005 12:56:09 PM Document presentation format – PowerPoint PPT presentation

Number of Views:18
Avg rating:3.0/5.0
Slides: 12
Provided by: MagMarg2
Category:

less

Transcript and Presenter's Notes

Title: Measure 26


1
  • Measure 26
  • Strategic Traffic Management
  • 13.6.2012
  • Katerina Oktabcova
  • Usti nad Labem Municipality

2
Background and Objectives
  • Intensive traffic on local roads and development
    of motor transport requires application of
    regulatory measures
  • necessary to address issues of sustainable
    development and seek complex transport solutions
    for the city
  • Objectives
  • regulation and segregation of motor transport in
    order to avoid safety risks for the population
  • Improve traffic flow and safety level
  • reduce the environmental impact of traffic, such
    as emission of harmful gases, noise and
    vibrations
  • Introduce priority for public transport
  • support walking and cycling modes
  • Contribute to better quality and cleaner life in
    the city
  • Measure target
  • develop a traffic management strategy and
    implement measures to restrict traffic in the
    city centre

3
Measure overview
  • Tasks
  • 11.3.4 Strategic Traffic Management
  • Finished in M34
  • RTD task
  • Analysis of current state of traffic management,
    application of intelligent transport systems and
    transfer of traffic data in the city
  • 3.8 Strategic Traffic Management
  • Finished in M35
  • DEMO task
  • Feasibility study of implementing optimised
    traffic management scheme and ITS development to
    meet requirements for sustainable urban transport
    development

4
Task 11.3.4 Strategic traffic management analysis
  • Analysis of the current management scheme for
    individual functional areas
  • Management and organization of road safety
  • Traffic information and data transfer
  • Parking of vehicles
  • Public transport
  • Freight transport
  • Transport surveillance systems
  • Payments system
  • Management and maintenance of transport
    infrastructure
  • Identification of issues, needs and requirements

5
Task 3.8 Strategic traffic management scheme
  • Proposal of the architecture of the ITS
    systemand suitable traffic management scheme
    forÚstí nad Labem
  • Traffic management via variable traffic marks and
    traffic light signals
  • Traffic management in emergencies
  • Information and data transfer
  • Parking navigation
  • Preference for public transport and data
    provision
  • Management of goods transport and freight
    vehicles
  • Traffic surveillance systems
  • System of payments within the transport system
  • Maintenance of transport infrastructure

6
3.8 Strategic traffic management
  • Proposal for intelligent telematic systems for
    the city
  • Development of the traffic light system
  • Detectors enabling priority of way for PT
  • Interacting with the current traffic flow
  • Integrate foreseen traffic situations (for
    example higher intensity before a football match,
    etc.)
  • Improve the information system
  • Electronic notice boards
  • Proposal for specific solutions for individual
    localities in the city
  • Proposal of a central traffic control station
    with integrated telematics and traffic
    regulations

7
Proposal for the architecture of the management
system and organisation of traffic in Ústí nad
Labem
8
Results
  • New traffic management scheme would enable
    integration of all the existing subsystems and
    continuous real-time sharing of information
  • The proposal defines an integrated traffic
    management system gathering, processing, storing
    and sharing information among the relevant bodies
    in the city with centralized management.
  • Desirable solution for administrators of roads,
    units of the IRS and road users (drivers,
    pedestrians, cyclists and PT passengers)
  • Especially required during emergency situations
    in the city usually due to unfavorable weather
    conditions (floods, ice and snow)
  • Strategic traffic management would also provide
    improved conditions for development of
    non-motorised transport (pedestrians and
    cyclists) and for PT services.

9
Budget and costs
  • Subcontract
  • Develop the detailed technical solutions and
    methodology for strategic traffic management in
    the city (experts in remote control station
    engaged)
  • Budget 60 000
  • Actual costs 61 038

10
Evaluation
  • Processing final evaluation data
  • Indicators
  • Traffic flow peak/off-peak
  • transport model
  • Average vehicle speed peak/off-peak
  • transport model
  • Average vehicle time peak/off-peak
  • transport model
  • Total fuel consumption
  • transport model
  • average consumption according to vehicle types
  • Emissions
  • CO, Nox transport model
  • CO2, Particulate impossible to obtain by
    transport model

11
Thank you! Katerina Oktabcova CIVITAS
Archimedes Ústí nad Labem Municipality katerina.ok
tabcova_at_mag-ul.cz www.usti-nad-labem.cz/civitas
Write a Comment
User Comments (0)
About PowerShow.com