Title: Absorber R
1Absorber RD Progress
KEK S. Ishimoto, S. Suzuki
K. Yoshimura Osaka Univ. Y. Kuno, A.
Horikoshi
MICE Meeting at RAL, Oct-23, 2005
2MICE Absorber System with Cryocooler
G-H2 cylinders/H2 tank/ Metal hydride
He refrigerator
G-H2 safety exit and reservoir tank
L-He Dewar
L-N2 Dewar
He, N2 gas exit/return
G-He cylinders
Exit to cool the transfer tube
H2 leak monitor
Absorber vacuum system
Safety exit for H2
3MICE Absorber
Room Temp. Magnet Bore
L-H2 OUT
L-H2 Level Sensor
Thermometers
Lake Shore CX-1050-SD
L-H2 IN
2-Heaters
Lake Shore HTR-25-100
4Test Cryostat at KEK -- Original Plan
MICE
Cryocooler RDK-415D
MICE Test Absorber
5Absorber Test Subjects at KEK
Test Absorber ? Real Absorber 1, 2, 3 (1)
Absorber leak test at 20K and 4.2K body,
pipes, In seal (2) LH2 absorber (lt 1 L)
pre-cooling process with LN2 or without LN2
cooling speed, warm up speed cooling power and
heat leak test (3) LHe absorber 1.5W_at_4.2K
pre-cooling process with LN2 or LHe cooling
speed, warm up speed cooling power and heat
leak test How much additional Lhe, if it
needs? (4) Instrumentation LH2 level and
temperature sensor test control and DAQ (5)
Real window test at 20 K?
6Test Cryostat with Test Absorber
7New Parts (1)
- Needs Modify
- gt Aluminum plug at top
- gt KF25 pipe on window
- Needs Parts on/in Absorber
- gt Flexible pipes
- gt LH2 level sensor
- gt Thermometers
- gt G10 supports
8New Parts (2)
- Needs Parts around condenser
- gt LH2 condenser body
- gt Flexible pipes
- gt Thermal links
- gt Feedthrough
9Top Flange Absorber Support
10Cryocooler
H2 Condenser
6-M5
Cryocooler Bottom Flange
Indium/Grease
- Copper Flange T6 mm - Screws 6-M5 on
copper - Weight 23Kg Mechanical design Good
thermal contact
LH2 Supply 5 mm higher than bottom to
keep LH2 level
KEK LH2 target
11Feedthrough at 20K
LH2
VAC
KF40 48 pin LH2 Level sensor
12Test Cryostat with MICE Absorber 1,2,3
Vac. Pump Gate Valve
13Test Cryostat with MICE Absorber
Needs pipe joints
14Absorber Test Cryostat
Cryocooler
15Absorber Test Cryostat
16Parts (1)
17Parts (2)
Fix and Flexible Tubes
Test Absorber
Absorber is now at the company to modify the top
port and window.
G10-SUPPORT
18Parts (3)
19Summary
- Test items at KEK
- (2) The Cryocooler, test absorber, T.M.P. and
vacuum gauges were temporally assembled to decide
pipe length. - (3) The LH2 condenser and related parts were
designed and ordered. - (4) Flexible and fixed pipes were designed and
ordered. - (5) Feedthrough (48pins) were ordered.
- (6) We will start the parts assemble from
mid-November. - (7) Absorber cooling starts this year
- 1st test Cryocooler H2 condenser
cooling test - 2nd test with absorber cooling test
- 3rd test cooling power and heat
leak test - ? LHe absorber test