THREE FORKS BAKKEN BAKKEN MATURE AREA Bakken Producer THREE FORKS BAKKEN BAKKEN MATURE AREA Bakken Producer New Bakken wells currently 3.5 EOR 1.5 Crowding out effect ... – PowerPoint PPT presentation

Number of Views:55
Avg rating:3.0/5.0
Slides: 16
Provided by: SteveN750
Category:
Tags: bakken | forks | three

less

Transcript and Presenter's Notes

Title: Three Forks


1
North Dakota Department of Mineral Resources
http//www.oilgas.nd.gov
http//www.state.nd.us/ndgs
600 East Boulevard Ave. - Dept 405Bismarck, ND
58505-0840(701) 328-8020 (701) 328-8000

2
BAKKEN
BAKKEN MATURE AREA
Bakken Producer
THREE FORKS
3
(No Transcript)
4
(No Transcript)
5
BAKKEN
BAKKEN MATURE AREA
Bakken Producer
THREE FORKS
6
Recent industry estimates of 60 by year end 2013
Crowding out effect Housing Day care -
Variable
New Bakken wells currently 3.5 EOR 1.5
7
New Bakken Well Truckload Timeline
Fracturing Phase 834 loads total (15 day
average)
70
60
Drilling Preparation 75 loads (3 days total)
50
Production Equipment Move (14 loads over 150
days) Pit Reclamation (36-41 total truckloads)
(6 loads over 76 days) (30-35 loads
emptying water, drilling fluid over 7-14 days,
used 10 day average)
40
Truckloads
Drilling Phase 167 loads total (19 day average)
30
Location Production Prep (71 loads)
from Permit Issued Day 0 (time can vary used 30
days)
Rig down 50 loads (2 days total)
20
Production Phase 3 trucks/day Year 1
1 truck/day Year 2
10
Drops to 0 if pipelined Year 4 (Day
1636), otherwise .5 trucks/day Year 6
Wait for Frack (90-120 days)
0
Day
0 10 20 30 40 50 60 70
80 90 100 110 120 130 140 150 160
170 180 190 358 540
2191
8
Bakken Wells 2-4 Truckload Timeline
Fracking Phase 454 tank loads 130 trucks per
well 584 loads (15 day average)
70
60
Drilling Preparation 25 loads (3 days total)
50
Production Equipment Move (14 loads over 150
days) Pit Reclamation (36-41 total truckloads)
(6 loads over 76 days) (30-35 loads
emptying water, drilling fluid over 7-14 days,
used 10 day average)
40
Truckloads
Drilling Phase 167 loads total (19 day average)
30
Location Production Prep Completed with first
well. No additional Trucks
Rig down 6 loads (2 days total)
20
Production Phase
10
Drops to 0 if pipelined
Wait for Frack (90-120 days)
Total 837
0
Day
0 10 20 30 40 50 60 70
80 90 100 110 120 130 140 150 160
170 180 190 358 540
2191
9
(No Transcript)
10
(No Transcript)
11
2011 Dunn County census estimate 3,720
12
(No Transcript)
13
(No Transcript)
14
Webinars
15
Funding for 2013-2015 Updates