Title: Experiments and beam lines
1Experiments and beam lines
66th ISOLDE Collaboration Committee meeting CERN,
29 February, 2013
Marek Pfützner
2Experiments
Planned or discussed set-ups ? Small,
removable b-NMR (?) SAND (?) CORSET (?)
MAYA/ACTAR Scattering chamber ? Large,
fixed MINIBALL (15?) HELIOS-like
spectrometer TSR Spectrometer
For the begining two experimental stations are
needed. If HELIOS comes, third will be necessary.
? - accepted proposal
3Previous HEBT design
HIE-Isolde Physics Coordination Group Meeting,
September 3, 2012
4Proposed stage 1 HEBT layout
Proposed and accepted at the previous ISCC
meeting, October 30, 2012
5Passage space
Stage 1 two stations
3.3m
1m
1.7m left for other setups (1.3m, if passage
counted from the open frame)
Electronics?
2.7m open frame
Smallremovable
2.3m -rails
1m common passage/dewars
1m common passage/dewars
MINIBALL
Passage space
6Passage space
Stage 2 three stations variant A
5.2m
5m
3.3m
1m
Electronics?
Smallremovable
2.7m open frame
2.3m -rails
0.8m
Helios magnet (no shielding)
1m common passage/dewars
Electronics?
1m common passage/dewars
MINIBALL
Passage space
7Passage space
Stage 2 three stations variant A
5.2m
5m
3.3m
1m
Electronics?
Smallremovable
Magnetic shield for 3T in the magnet 200 mm
of steel, 123 tons
2.7m open frame
2.3m -rails
0.8m
Helios magnet (no shielding)
1m common passage/dewars
Electronics?
1m common passage/dewars
MINIBALL
Passage space
8Passage space
Stage 2 three stations variant B
3.3m
1m
Electronics?
Smallremovable
2.7m open frame
2.3m -rails
1m common passage/dewars
1m common passage/dewars
MINIBALL
Passage space
Electronics?
9Passage space
Stage 2 three stations variant C
5.2m
5m
Electronics?
Smallremovable
2.3m -rails
0.8m
Passage space
10 (100 Gauss)
- Stray field from unshielded HELIOS solenoid
(shown at XT02) - 10 100 Gauss at beamline (max 8)
- 10 20 Gauss at Linac (max 2)
- Local magnet shielding design being evaluated
J.Strachan
113 lines
HELIOS shielding suggested in Oct12 (wider on one
side which one?)
Electronics?
1.4 m-support
Shielding report in Jan13
1.3m-rails
1.1 m
Helios magnet (no shielding)
Electronics?
122 lines
1.7m left for other setups (1.3m, if passage
counted from open frame)