1
  • Industrial risk main issues
  • (Scira Menoni, Politecnico di Milano)

2
A relevant problem of planning is that everything
has to be done so quickly . My experience is
that the overall time of design and
implementation is shorter if there is enough time
to think to the entire project (M. Andersson,
Swedish Railway Adm.)
3
Air pollution/toxic cloud

4
Chemical risk

Contamination Delayed Long term effects
Chronic/degenerative effects
Severe accident Sudden Acute effects
Explosion/fires/release Accident during hazmat
transportation
5
(No Transcript)
6
Contamination risk epidemiological studies

Exposure and vulnerability Exposure
factors Individual susceptibility
(cancerogenic markers)
Hazard Toxic substances Context conditions
must be considered geological,
metereological
7
Reference legislation in the EU
  • Seveso Directive II 96/82/CEE
  • 2. Seveso Directive III 2003/105/EC
  • 3. D.lgs 334/1999 eD.lgs 238/2005
  • 4. DM 151, 9/5/2001

8
Seveso Directive II 96/82/CEE e DGL
334/1999 Seveso Directive III 2003/105/EC e
Dlgs 238/2005
  • Safety management and policy in the firm
  • Control over land uses
  • Right to be informed
  • External emergency plan

9
Classification of plants
Plants subject to safety report Plants
subject to notification only
10
Difference between probabilistic risk analysis
and scenario approach
  • Probabilistic risk
  • analysis
  • R H VE
  • Scenarios
  • choosing a specific
  • event and its characteristics



Vulnerabity
Hazard

Risk



11

P1 P2 P3 A way to bring scenario
approaches closer to probabilistic risk
assessment (PRA)
12
Hazard analysis - probability of each
scenario - Analysis of types of failures in
the plant - Chain of failures
13
  • Vulnerability assessment
  • Other plants (domino effects)
  • lifelines (domino effects)
  • transportation networks

14
  • Vulnerability assessment
  • - Public buildings
  • - Dwellings
  • - Population

15
Differences between Seveso I and II
  • Seveso I
  • Need to make hazardous installations safer
    (inspection, technical devices)
  • Internal emergency plan
  • Citizens right to know
  • Seveso II Seveso 1
  • Safety policy in the plant
  • Focus from inside to outside
  • Domino effects
  • Land use planning
  • External emergencyplants

16
(No Transcript)
17
and hazmat transportation. A future directive?


18

19
(No Transcript)
20
(No Transcript)
21
(No Transcript)
22
And last but not least brownfield cleaning up