Project Status The project is progressing well with both grading aspects and building components. The mason has erected many walls to scaffold high and starting ... – PowerPoint PPT presentation

Number of Views:43
Avg rating:3.0/5.0
Slides: 9
Provided by: bho53
Category:

less

Transcript and Presenter's Notes

Title: Board of Education Update


1
Board of Education Update
October 11, 2010
2
Project Status
  • The project is progressing well with both grading
    aspects and building components.
  • The mason has erected many walls to scaffold
    high and starting to take the walls in
    Gym/Cafeteria wing to bearing height.
  • The steel frame in 2-3 wing is 98 complete and
    began on the K-1 wing on 10/4/10.
  • Part of Gym/Cafeteria wing steel frame has been
    started.
  • Slab On Grade in 4-5 wing has been poured and the
    mason has the interior walls up to scaffold
    height.
  • The plumber has finished the underground rough-in
    in K-1 wing and 2-3 wing the kitchen is the next
    area for installation.
  • The electrician has continued with rough-in.
  • Project is 26 completed.

3
K-1 wing
2-3 wing
4-5 wing
Gym
Cafeteria
Aerial Photo taken from Northern
Elevation---Picture taken on 9/13/10
4
K-1 Wing Masonry in Fore Ground 2-3 Wing Steel
Frame on Right
5
Picture taken from Church Parking Lot viewing 2-3
wing Steel Frame
6
Slab on Grade poured in 4-5 wing. Steel for 2-3
wing.
7
Givens Street Extension Completed prior to
Children returning to School on 8/25/10
8
Project in relation to the existing school
Picture taken from North Elevation