System Planning
  • Then
  • Integrated
  • Transmission to get local generation to local
    loads
  • Generation to meet fixed reliability targets
  • Long pay backs
  • Expenditure smoothing
  • Generation expansion process slow
  • Now
  • Fractured
  • Transmission to connect new generators
  • Generation planned to maximize profits
  • Short paybacks
  • Loss of fuel diversity
  • Lots of generators being built quickly

3
New Gas-Fired Capacity Added During 1998 to 2007
as a Percent of 1998 Total Capacity
4
System Operations
  • Then
  • Bundled
  • High degree of coordination
  • Few wholesale transactions
  • Limited entities
  • Now
  • Illegal to discuss transmission with generators
    (unless in public forum)
  • Many, many transactions
  • Numerous entities

5
How is Electricity Traded?
  • Then
  • Economy sales used split savings
  • Emergency transactions were generally capped at a
    fixed rate
  • Number of and distance of transactions generally
    small
  • Typically two parties
  • Now
  • Charge what the market is willing to pay
  • Lots and lots of transactions
  • Distance not an issue (contractually)
  • As many as 17 parties

6
Electricity Transactions
  • Must define and register all entities and their
    roles
  • All transactions must be electronically tagged
  • Reliability Coordinators formed to oversee wide
    area transactions

7
NERC
  • Then
  • Fixed number of entities
  • Peer pressure, voluntary compliance to rules
  • Reliability chosen over commerce
  • Now
  • More players almost daily
  • Need for mandatory compliance legislation
    pending
  • Reliability important to all (but big sure is
    tempting to some.)

8
Reliability Implications of the New World
  • Mixed results
  • Breakdowns in California, Pacific Northwest,
    Desert Southwest
  • Smooth transition in PJM and Texas
  • Lots of generators being built

9
Maintaining System Reliability
  • Peer pressure no longer sufficient
  • Reliability rules must be mandatory
  • But must not limit market response
  • NERC continually assesses current and future
    system reliability