Title: Ground Based Fuel Tank Inerting


1
Flight Testing of the FAA Concept OBIGG System on
a Boeing 747SP
William CavageAAR-440 Fire Safety
ResearchFederal Aviation Administration
October 30-31, 2002International Aircraft
Systems FireProtection Working GroupAtlantic
City, NJ
2
Background
  • Focus of the Testing is to Validate the Concept
    of In Flight Inerting as Outlined by Ivor Thomas.
  • Study Distribution of Inert Gas During the Phases
    of a Typical Commercial Mission
  • Study the Cost and Benefit of Potential OBIGG
    Systems.
  • Study Diffusion of Inert Gas After a Typical
    Aircraft Operation

3
Work Plan
  • Modify OBGI System to Resemble the Ivor Thomas
    Concept
  • Validate Existing ASM Performance Data and Obtain
    Additional Altitude and Low Pressure Data
  • Reconstruct and Validate the OBOAS
  • Model the System Performance and CWT Inerting
    Behavior in Altitude Chamber
  • Obtain Flight Test Aircraft, Install System and
    Instrument Aircraft
  • Do Testing
  • Claim Victory

4
(No Transcript)
5
Simplified OBIGG System
6
Simplified OBIGG System
7
Status
  • System Modified and Installed on 747SP Ground
    Test Article
  • OBOAS Reconstructed and Validated
  • Single Membrane Testing Done
  • Preliminary Scale Tank Inerting Testing Completed
  • System Readiness Review Completed?
  • Need 747SP Flight Test Aircraft Commitment
  • Working with Boeing
  • Seeking Additional Parties