Title: Cargo Pre-Inspection Pilot


1
Cargo Pre-Inspection Pilot
  • Leveraging partnerships to facilitate trade

October 22, 2013
2
Phase I Blaine Surrey
Goals and objectives
  • Validate pre-inspection concept
  • Develop joint agency protocols, including
  • Radiation detection
  • High risk response
  • Test procedures and technologies

3
Phase I Blaine Surrey
Footprint
Radiation portal monitors
Pre-inspection booth
4
Site Configuration
David Davidson, BPRI. Oct. 22, 2013, TBWG -
Montreal
5
Methodology
  • Timestamp truck as it moves through POE
  • T1 Joins queue on highway
  • T2 Joins queue within POE footprint
  • T3 Arrive depart Booth 4
  • T4 Depart ( arrive?) Booth 3
  • June 12 baseline, prior to pilot
  • July 2/3 Launch 1 week
  • July 23/24 Launch 4 weeks

David Davidson, BPRI. Oct. 22, 2013, TBWG -
Montreal
6
Experience at Exit Booth 3
Launch 1 week N 94 Launch 4 weeks N 144
roll through 42 59
stop-n-go 29 32
stopped 29 9
David Davidson, BPRI. Oct. 22, 2013, TBWG -
Montreal
7
Dwell-times at Booth 4
  • 63 sec. for FAST truck in baseline
  • 89 sec. Launch 1 week
  • 50 sec. Launch 4 weeks
  • At launch, ineligible trucks in FAST lane!
  • Longer dwell _at_ Booth 4
  • Need for stop _at_ Booth 3

David Davidson, BPRI. Oct. 22, 2013, TBWG -
Montreal
8
Phase I Blaine Surrey
Results
  • Validate pre-inspection concept
  • Develop of joint agency protocols, including
  • Radiation detection
  • High risk response
  • Test procedures and technologies

9
Phase II Buffalo Fort Erie
Goals and objectives
  • Test pre-inspections ability to
  • Reduce wait times
  • Increase commercial throughput
  • Reduce congestion
  • Modeling key to measuring pre-inspections
    effectiveness.