UNC Modifications 061 062 An Overview
  • Transmission Workstream 03/11/2005

2
Background
  • Winter Outlook Report identified the potential
    requirement for increased demand response for
    this winter.
  • Demand Side Working Group has identified areas of
    development to facilitate greater demand side
    response being offered
  • Clear signal needed from National Grid NTS that
    demand response is likely to be required.
  • Ability to offer demand response for multiple
    days (unable to turndown for short periods)
  • Provision of a route for the residual balancer to
    get access to non-OCM gas

3
Gas Balancing Alert (UNC mod 062)
  • GBA will be issued on D-1 where forecast demand
    is in excess of anticipated available supplies.
  • Delivery effect of particular storage types will
    be removed from the anticipated available
    supplies assessment when stock levels are within
    2 days of the Safety Monitor levels (at max
    export rates).
  • GBA, once issued, shall remain in force for the
    duration of the Day.

4
Gas Balancing Alert (UNC mod 062)
  • GBA within day option.
  • Implementing the option would give National Grid
    NTS the ability to issue a GBA within the Day
    where
  • There is an event that National Grid NTS
    anticipated will lead to an end of day supply
    loss in excess of 25 mcm and
  • The anticipated supply loss subsequently results
    in the remaining anticipated available supplies
    being less than or equal to forecast demand.
  • Views are invited on this option..

5
Facilitating further demand response (UNC mod 061)
  • Where a GBA is issued, Eligible Balancing Actions
    by National Grid NTS may include
  • Offers taken from OCM with Trading Participants.
  • Offers taken OTC with non Trading Participants.
  • Offers taken from either source that are
    effective for up to 7 consecutive days including
    D.

6
Effect on SAP and SMPs
  • SAP
  • Continue to include all OCM trades (except
    Locational)
  • Also includes Eligible Balancing Actions taken by
    NG NTS through OTC contracts
  • Publication via National Grid systems as now plus
    working with OCM operator to investigate other
    options.
  • SMP
  • Set by Eligible Balancing Actions either on OCM
    or OTC
  • Inc. multiple day trades

7
Effect on SMPs
  • Where a multi-day trade is accepted, each
    component Day will contribute into SAP, SMPs and
    Balancing Neutrality based upon the Residual
    Balancer assessed probability of the gas being
    required by the Total System on the subsequent
    days.
  • of price applied Preq x (Preq / Sum(Preq))
  • Effective Price (used in SMPB) of price
    applied x p/kWh x No Days
  • Examples are set out in the Proposal and on next
    slide.

8
Example
  • National Grid NTS accepts a six day, multi-day
    offer (buy) for 200 kWh per day at 10p kWh,
    Total Cost 12000p, Total Volume 1200 kWh.

D1 D2 D3 D4 D5 D6
Probability of Requirement 100 20 5 0 0 0
of price applied 80 16 4 0 0 0
Effective Price (used in greater of SMPB calculation) 48p 10p 2p 0 0 0
Effective Volume (used in SAP, volume defined in this row original trade price (10p) 960 kWh 192 kWh 48 kWh 0 0 0
Balancing Neutrality Charge 9600p 1920p 480p 0 0 0
9
Timetable
  • Sent to Ofgem requesting Urgency 01/11/2005
  • Ofgem grant Urgent status 02/11/2005
  • Proposal issued for consultation 07/11/2005
  • Closeout for representations 21/11/2005
  • FMR issued to Joint Office 24/11/2005
  • Panel Recommendation 01/12/2005
  • Ofgem decision expected 05/12/2005
  • Is a special Workstream meeting required?