Well Intervention: Challenges - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

Well Intervention: Challenges

Description:

A rigless method for hydrocarbon exploration whereby a drilling robot transports formation logging sensors to ... no mud invasion Zero surface emissions ... – PowerPoint PPT presentation

Number of Views:401
Avg rating:3.0/5.0
Slides: 10
Provided by: DaveG173
Category:

less

Transcript and Presenter's Notes

Title: Well Intervention: Challenges


1
The Badger Explorer concept
A rigless method for hydrocarbon exploration
whereby a drilling robot transports formation
logging sensors to evaluate a hydrocarbon
prospect without constructing a well. The
borehole is backfilledby cuttings as the
Badgerprogresses.
2
Economic Benefit
  • Small boat or buoy required for power
    communication.
  • Exploration/appraisal data cost ?10of
    conventional wells
  • Also developmentapplications

3
A fly by wire exploration tool
  • Electric motor driven bit
  • Cuttings transported behind tool - excess forced
    into formation
  • Communication/power cable spooled from onboard
    store as drilling progresses

4
Tentative Specifications
  • Conventional logging sondes record formation
    parameters
  • Capacity 3000 m (sub-seabed), ?8 borehole
  • 2 to 6 months (depends on rock hardness)

Patent Pending
5
Technical Benefit
  • Continuous High Quality Data recorded in virgin
    formation no mud invasion
  • Zero surface emissions
  • No hydro carbons
  • No cuttings
  • No mud
  • Borehole is continuously permanently plugged

6
History
  • Initial Blue Sky project with Statoil/BP
  • Proof of Concept - no show stoppers
  • Bit cooling, cleaning, ROP lifetime
  • Well control, cuttings permeability sealing
  • Cuttings disposal
  • Cable

7
Plan
  • Feasibility studies
  • Fracturing/cuttings injection
  • Cable deployment/friction
  • Hole sealing study

Fracture test rig
8
Budget Key Feasibility Study
  • Borehole fracturing 750 KNOK
  • Cable study 100 KNOK
  • Borehole sealing 150 KNOK
  • Total 1000 KNOK
  • Project schedule 6 Months
  • NFR BIP 35 funding confirmed
  • Seeking industry participation

9
Commercial Plan
Risk
Market evaluation Patents Business plans
Reward
Write a Comment
User Comments (0)
About PowerShow.com