ILC FY06 Tasks
  • ILC TD Project Management
  • Goal Prepare cost and schedule information for
    input to ILC Program Director (R. Kephart).
    Manage resources to accomplish ILC Program Tasks.
  • Task Manager H. Carter
  • Task Engineer P. Pfund (Intergration)
  • Task Scientific Input S. Mishra
  • Task Deliverables ILC TD Project budget,
    resource-loaded schedule, and management of
    resources to accomplish project goals
  • 3.9GHz Cryomodule
  • Goal Design, procure components, test assemble,
    and ship to DESY a 3.9GHz Cryomodule for the
    Tesla Test Facility
  • Task Manager(s) N. Solyak
  • Task Engineer D. Mitchell(mechanical)/ T.
    Khabiboulline (RF design testing)
  • Task Designer(s) Contract Designers and PPD
    designers and drafters
  • Task Scientific Input H. Edwards
  • Task Deliverable Completed 3.9GHz cryomodule
    assembled at DESY and ready for
    installation in TTF

2
ILC FY06 Tasks
  • ILC 1.3GHz, Beta1 Cryomodule Americanization
  • Goal Develop a concise, complete drawing package
    for the Type III Cryomodule
  • Task Manager D. Mitchell
  • Task Engineer D. Mitchell
  • Task Designer Contract Designers
  • Task Scientific Input N/A
  • Task Deliverable Complete Type III cryomodule
    drawing package ready for procurement
  • ILC 1.3GHz, Beta1 Type IV Cryomodule Design Team
  • Goal Form an International Type IV Cryomodule
    Design Team
  • Task Manager T. Peterson
  • Task Engineer(s) U.S. D. Mitchell / T. Nicol
    / M. McGee (AD) / S. Tariq (AD)
  • J. Weisend (SLAC)
  • Europe F. Rafaelli (INFN-Pisa)
  • Japan ?
  • Task Designer Contract Designers
  • Task Scientific Input H. Edwards / C. Pagani /
    H. Padamsee / N. Toge / W.D. Moeller
  • Task Deliverable Complete Type IV Cryomodule
    drawing package ready for procurement

3
ILC FY06 Tasks
  • Horizontal Test Cryostat (ILCTA-MDL)
  • Goal Design, procure components, assemble, and
    place into operation a horizontal test cryostat
    system (Chechia) capable of being used to
    conduct high power testing of single, dressed
    3.9GHz and 1.3GHz cavities
  • Task Manager T. Peterson
  • Task Engineer(s) M. Wong and V. Poloubotko
    (Mechanical) / A. Lounine (RF) /
    R. Carcagno (LLRF)
  • Task Designer(s) V. Poloubotko / C. Reid
  • Task Scientific Input A.Hocker (Project
    Physicist) / Oleg Prokofiev (Applications
    Physicist)
  • Task Procurement P. Olderr / M. Steinke
  • Task Deliverable Complete horizontal test
    cryostat system
  • Vertical Test Cryostat (ILCTA-IB1)
  • Goal Design, procure components, assemble, and
    place into operation a horizontal test cryostat
    system (Chechia) capable of being used to
    conduct high power testing of single, dressed
    3.9GHz and 1.3GHz cavities
  • Task Manager(s) C. Sylvester / (T. Peterson )
  • Task Engineer(s) M. Wong (Mechanical) / A.
    Lounine (RF) / R. Carcagno (LLRF)
  • Task Designer Clark Reid
  • Task Scientific Input C. Ginsburg (Project
    Physicist) / Oleg Prokofiev (Applications
    Physicist)
  • Task Procurement P. Olderr / M. Steinke
  • Task Deliverable Complete vertical test cryostat
    system

4
ILC FY06 Tasks
  • Electropolishing RD
  • Goal Develop and implement an RD study to fully
    understand and quantify the EP process, resulting
    in repeatable procesing results
  • Task Manager C. Boffo
  • Task Engineers C. Cooper / A. Rowe (AD)
  • Task Designer G. Davis
  • Task Scientific Input P. Bauer / T. Tazima
  • Task Procurement P. Olderr / M. Steinke
  • Task Deliverable A repeatable EP process
    resulting in cavities capable of achieving a
    35MV/m accelerating gradient
  • Cavity Production for Cryomodules
  • Goal Coordinate production of both 3.9GHz and
    1.3 GHz Beta1 elliptical cavities at various
    institutions and industry
  • Task Manager M. Foley (AD)
  • Task Engineer M. Foley (AD) / S. Reeves (AD)
  • Task Designer E. Pirtle (AD)
  • Task Scientific Input N. Solyak / H. Edwards
  • Task Procurement P. Olderr/M. Steinke
  • Technicians W. Muranyi (AD) / A. Buetler (AD) /
    B. Smith
  • Task Deliverables Construction and test of
    3.9GHz cavities at JLab and at FNAL
    coordi- nation of 1.3GHz cavity production at
    other institutions and industry.

5
ILC FY06 Tasks
  • Joint ANL/FNAL BCP Facility
  • Goal Complete installation of facility at
    Argonne, commission facility, operate facility
  • Task Manager A. Rowe (AD)
  • Task Engineer(s) Installation, commissioning,
    and operation A. Rowe
  • Design I. Terechkine / C. Boffo
  • Controls L. Elementi
  • Task Designer G. Davis
  • Task Scientific Input K. Shepard (ANL)
  • Technician(s) W. Muranyi (AD) / M. Rauchmiller
    (AD) /
























































































































































































































































































































































































































  • Task Deliverable Fully operational joint
    ANL/FNAL BCP facility
  • Power Coupler Design and Testing
  • Goal Design and test 3.9 and 1.3GHz power
    couplers, including test stations
  • Task Manager D. Olis
  • Task Engineer D. Olis (mechanical) / A. Lounine
    (RF)/ I. Gonin / T. Khabiboulline
  • Task Designer D. Arnold
  • Task Scientific Input N. Solyak
  • Task Procurement P. Olderr/M. Steinke
  • Task Deliverables 1.3GHz power coupler and test
    station
  • 3.9GHz power coupler and test station

6
ILC FY06 Tasks
  • 1.3GHz, Beta1 Cryomodule Assembly Facilty
    (ILCCA-MP9)
  • Goal Complete CAF and begin assembly of
    cryomodules there
  • Task Manager Tug Arkan
  • Task Engineer Tug Arkan
  • Task Designer E. Borrisov
  • Task Scientific Input Axel Matheisen (DESY)
  • Task Procurement P. Olderr / M. Steinke
  • Lead Technician(s) G. Smith / B. Smith
  • Task Deliverable Fully operational
    cryomodule assembly facility
  • Capture Cavity 2
  • Goal Assemble, install and test CC2 at
    ILCTA-MDL firstnat 4.5K, then at 2K
  • Task Manager M. McGee (AD)
  • Task Engineer M. McGee (AD)
  • Task Designer D. Hurd (AD)
  • Task Scientific Input T. Koeth / H. Edwards
  • Task Procurement P. Olderr / M. Steinke
  • Technicians W. Muranyi (AD) / B. Smith
  • Task Deliverables Assembly, installation and
    testing at 4.5K of CC2 at ILCTA-MDL
  • Relocation, installation and testing at 2K of
    CC2 at ILCTA-MDL

7
ILC FY06 Tasks
  • 1.3GHz, Beta1 Cryomodule Feed and Turnaround
    Cans (ILCTA-NM)
  • Goal Design, Procure, Install and Test
    Cryomodule Feed and Turnaround (or end) Cans at
    the New Muon test facility
  • Task Manager T. Peterson
  • Task Engineer M. Wong
  • Task Designer C. Reid and Contract
    Designers
  • Task Scientific Input N/A
  • Task Procurement P. Olderr / M. Steinke
  • Lead Technician(s) N/A (outside
    procurement of completed assemblies)
  • Task Deliverable Cryomodule feed and end
    cans for the cryomodule test facility at NML