Trigger Meeting. 20-July- 2000. SciFi L1 Trigger (CTT/CPS/FPS) Commissioning ... Final tests (communications using Hotlink, 1553, UART) of prototype in progress ... – PowerPoint PPT presentation

Number of Views:93
Avg rating:3.0/5.0
Slides: 12
Provided by: joh6156
Category:

less

Transcript and Presenter's Notes

Title: SciFi L1 Trigger CTTCPSFPS Commissioning Overview


1
SciFi? L1 Trigger (CTT/CPS/FPS) Commissioning
Overview
  • Hardware prototype commissioning
  • Done DFEA tests with DFEC (1/2 crate)
  • today/next week G-link to L2/L3
  • August serial copper link to MTM
  • Firmware prototype commissioning
  • Today fake 'CTOC' - L3 VRB communication test
    (using DFEA hardware)
  • next week
  • real CTOC test (on prototype CTOC card)
  • fake 'CTOC' - L2 test stand communication test
    (using DFEA hardware) ? August 1 milestone
  • as firmware becomes available remainder of DFEx,
    CTxx, CPxx, FPxx tests
  • August
  • FPTT - L1FPS MTM communication (Sateesh is almost
    ready with firmware), sharing Muon MTM crate
  • start tests of downloading under COMICS/EPICS
  • September
  • DFEA - CTOC - CTQD - L2/L3 chain
  • switch to SciFi MTM crate
  • October
  • DFES - CPSS - L2/L3 chain
  • DFEF - FPSS - L2/L3 chain

2
Cal Framework
  • Cal working on
  • Analog Input card prototype in 5k test
  • Quadrant-Region mezzanine card (new terms from L1
    Cal)
  • readout card mods (with external vendor)
  • Framework
  • installing final SCL cables hub (aim for end of
    August)
  • testing readout FW - L3 into trigger mode VRB

3
Update on the Level 1 Muon TriggerHardware
Status(as recalled by David Fein)
  • Stefan Grünendahl for
  • Ken Johns
  • University of Arizona
  • for the
  • L1 Muon Group

4
L1MU Hardware
  • (Size of system 11 crates ( MRC crates from F/E
    readout group))
  • MTCM (Crate Manager) 99 done
  • Commissioning of preproduction version 95
    complete
  • Production layout nearly complete
  • Production boards by 8/15
  • MTCxx (Trigger Card)
  • ditto above a few weeks
  • MTFB (Flavor Boards)
  • ditto above a few weeks for MTM and MTC10
    MTFBs
  • Layout of preproduction MTC05 MTFB using ACEX
    technology in progress done
  • SLDBs (Gbit/s Serial Links)
  • 3000 production boards (slowly) returning from
    assembler

5
MCEN Hardware
  • MCCM (Crate Manager)
  • Final tests (communications using Hotlink, 1553,
    UART) of prototype in progress
  • MCEN (Centroid Finder Card)
  • Preproduction version assembled being tested
  • MCPB (Physics Boards)
  • Preproduction version layout in progress
  • update ? John Butler

6
L1MU Infrastructure
  • Custom VME backplanes
  • L1MU production delivery in July
  • MCEN production ordered
  • are at Arizona
  • Power supplies
  • Prototype still needs to be assembled and tested
    work starts today (D.F.)
  • Production version will immediately follow
    (available late September?)
  • Platform services
  • Racks and power installed (still true)
  • Cabling
  • Cable and connectors _at_ Fermilab
  • Cable maps for all cables exist
  • Production at NIU in progress
  • Will also try to take advantage of summer
    manpower
  • cable tester setup is at FNAL

7
Progress to Date
  • MTM triggers sent to the TF using trigger logic
    with two PDTs
  • Simple rates measured
  • L1MU MTM crate readout to the MRC
  • Data analyzed by eye sensible
  • redone with final L3 protocol data written to
    file L3 unpacking tested success
  • Present problems
  • Handling of L1 Rejects (FPGA fixed but not
    tested) fixed

8
Near Term Goals
  • early July
  • Stable operation of the L1MU MTM crate done
  • mid-August
  • Stable operation of one (sparse) L1MU trigger
    crate and the L1MU MTM crate
  • Still using preproduction cards
  • mid-September
  • Add L1CFT MTM crate to the above
  • Power supply uncertain
  • early October
  • Begin commissioning production L1MU crates and
    cards
  • everything still on track

9
Near Term Asides
  • Examine
  • In progress (Pete Johnson is starting to work on
    this, using Dave Hedin's framework)
  • Fall commissioning people _at_ D0
  • Rob McCroskey (hardware)
  • Pete Johnson (software)
  • Prototype power supply assembly is lagging
    starting today
  • Cable installation plan
  • Need have jumper cables () for the end region

10
L1MU Production Commissioning Plan
  • 01 September 00
  • MTCMs (crate managers)
  • MTM MTFBs (MTM flavor boards)
  • SLDBs (serial links)
  • Infrastructure
  • 01-15 October 00
  • MTCxxs (trigger cards)
  • MTC10 MTFBs (10 flavor boards)
  • MTC05 MTFBs (05 flavor boards)
  • 01 December 00
  • MCEN (centroid finders)
  • MCPB (centroid logic boards)
  • MCCM (crate managers)

11
Conclusions
Everything is going according to plan...