WATMAN Project - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

WATMAN Project

Description:

WATMAN Project – PowerPoint PPT presentation

Number of Views:62
Avg rating:3.0/5.0
Slides: 16
Provided by: maryjean3
Category:
Tags: watman | joss | project

less

Transcript and Presenter's Notes

Title: WATMAN Project


1
  • WATMAN Project
  • Feasibility Study

SEPIC Project TAIWAT Component
2
Why WATMAN?
  • Improves ability to respond to emergency
    situations (floods spills)
  • DESWAT is providing automatic hazardous flood
    forecast and remote warning system
  • WATMAN address to
  • Improving dam management and maintenance
  • Optimizing flood control structures
  • Installing alarm system and sirens
  • Bringing intervention and remedial equipment
  • Increases efficiency of water allocation and use
  • Improves environmental health and ecosystem
    integrity
  • Increases ability to comply with EU WFD

3
I. Water Crisis Management
4
PROJECT SCOPE AND OBJECTIVES
2.Expert System-DSS
1.Informational System for Water Management
3.Communication System
4.Warning System
5.Rapid Response Center
5
1.1.Automated stations installation at reservoirs
and lakes entry, for rain and snow
Complete DESWAT monitoring system
Change or upgrade the existent infrastructure at
hydrometric stations upstream the reservoirs, at
diversions and strategic water users
6
Designing Decision Support Systems
7
1.2.AUTOMATING MEASUREMENTS AT DAMS, RESERVOIRS,
DIVERSIONS AND CATCHMENTS
36 diversions
96 dams
49 catchments
8
3.COMMUNICATIONS
  • UHF 400MHz
  • 96 dam stations
  • 118 at HS, WMS and WD
  • Wireless 2,4 GHz
  • 96 links dam-HS/WMS
  • VPN
  • Meteorburst 2 GHz
  • 150 monitoring systems PS
  • 450 back-up HPT (DESWAT)
  • 2 master stations

3 minutes WMS ?WD ?NAAR ?NIHWM
9
WATMAN COMMUNICATION CENTRE SYSTEMS INTEGRATION
(INTEROPERATE)
NAAR
Level 4Dams
Level 2
Nivel 3
VPN
VPN
Dams
WMS Dispatch Centres
Basinal Dispatch Centre
National Dispatch Centre
Hydrological Station
Level 3
Level 1
Level 2
10
INCREASING OF THE ANTICIPATING TIME FOR A
DANGEROUS EVENTWITH APROX. 1-2 HOURS (AVERAGE),
AND IN SOME CASES WITH 5-6 HOURS
11
4.WARNING SYSTEM
PREPARATION
INTERVENTION
REHABILITATION
SIRENS AND COMMUNICATIONS
R.R.C.
LOSS EVALUATION INSTRUMENTS
12
WATMAN WARNING SYSTEM
  • 1632 sirens installation
  • 96 to the important dams from NAARs property
  • 1536 sirens installed downstream the dam, in
    urban zones, from the zones with high flooding
    risk and that dont have warning systems
  • 41 warning system command centres at WMS level
  • 11 call centers 1 back-up national level
  • 42 command centres at NCDAD si CCDAD

13
5.RAPID RESPONSE CENTRES - RRC
  • 11 coordonation centres for intervention actions
    at basin level (WD), having intervention
    equipments for accidental spills
  • 11 intervention centres at county level (WMS),
    having intervention equipments for floods and
    accidental spills
  • 17 intervention centres in case of floods, at
    county level (WMS)

14
II.WATER RESOURCES ALLOCATION OPTIMIZATION AND
LONG TERM MANAGEMENT
15
IMPLEMENTATION PHASES 60 months
- PHASE I Dams monitoring and RRC
organization - 24 months - PHASE II
DSS and Alarm System for flood protection and
accidents to the
large dams - 36 months
Write a Comment
User Comments (0)
About PowerShow.com