Injection System with a Booster in Separate Tunnel

Description:

Summary of NSLS-II injection requirements. Ring injection ... 'Hunt and peck' mode of injection. Single-bunch versus multi-bunch for complex bunch patterns ... – PowerPoint PPT presentation

Number of Views:44
Avg rating:3.0/5.0
Slides: 13
Provided by: tsha1
Category:

less

Transcript and Presenter's Notes

Title: Injection System with a Booster in Separate Tunnel


1
Injection System with a Booster in Separate
Tunnel
  • T. Shaftan
  • for the NSLS-II team

2
Outline
  • Summary of NSLS-II injection requirements
  • Ring injection straight
  • Injection simulations
  • New injector layout
  • 200-MeV linac
  • 3.0-GeV booster
  • Injector tunnel
  • Challenges
  • Conclusion

3
Summary of NSLS-II injection requirements
  • High reliability
  • Reasonable initial fill time
  • Low losses
  • Low power consumption
  • Lifetime 3 hours (with 3rd HC)
  • Top-off
  • Stability of current lt1
  • Time between top-off injections gt1 min
  • Bunch-to-bunch variations of charge lt20
  • Storage ring 7.3 nC per 1 min top-off format
    1-2 shots per 1 min
  • Linac 15 nC in 1 min (50 losses), THALES linac
    9.3 nC/300 ns
  • Bunch train 80 300 ns long (40 150 ring
    buckets)

I
t
I
t
QI
t
Ib
bunch
4
Injection straight-section
Closed bump design
  • Closed non-interleaved bump design
  • Fits into a single straight section of the ring
  • 2-turn long pulsed kickers
  • Optimization of the injected beam Twiss
    parameters
  • Sufficient tolerances for injected and stored
    beam
  • Minimization of injection transients effect on
    stored beam

Injection geometry near septum
3 mm
Septum knife
I
stored beam
?kicker
t
10?stor 2 mm COE
1st turn
2nd turn
3rd turn
3?inj
4 mm
with I. Pinayev, R. Heese
5
Simulations of injection into the ring
  • 200 particles, 10000 turns
  • RF is ON, synch rad is ON
  • Transverse misalign. are ON
  • Multipole field errors
  • Realistic apertures included
  • Orbit correction
  • Tune correction
  • Coupling correction (in TRACY-2)
  • Injected beam with optimum beta-functions
  • No IDs yet
  • Injection tracking with emittances of 35 at 3
    GeV
  • No limitations from DA (DA is larger then vacuum
    chamber size)
  • Sufficient tolerances for injection into the
    ring are observed

Courtesy of L.H. Yu and I. Pinayev
6
Injector layout with compact booster
  • ASAC-2006 in-tunnel booster
  • Lehman Review 2007 recommendation for choosing
    compact booster
  • Diamond, Soleil, BESSY, APS, ALS,
    low-emittance solution ASP booster
  • Reworking the ASP booster lattice headroom for
    3.6 GeV
  • Minimum of modifications cost-effective solution
  • Higher current (30 mA), longer bunch trains,
    injection at 200 MeV

7
200-MeV linac
  • 3-GHz 100-MeV linac from THALES is in operations
    at SOLEIL
  • SOLEIL gun operates at 352 MHz, we need 500 MHz
  • We need 15 nC in 80-300 ns at 200 MeV
  • Assume 50 losses in the booster-ring bucket
  • Higher energy reduces beam loading and energy
    spread, eases booster injection
  • Higher energy provides with redundancy loss of a
    klystron ? booster injection at 177 MeV
  • Need for flexible bunch train format

from HELIOS, THE LINAC INJECTOR OF SOLEIL
INSTALLATION AND FIRST RESULTS, PAC-2005
Measured beam trains in LPM (SOLEIL)
J. Rose
8
3 GeV booster
  • NSLS-II Booster parameters
  • Emittance 35.2 nm (at 3 GeV)
  • Circumference 143.96 m
  • Tunes 10.3/3.27
  • Chromaticity 10.41/13.27
  • Momentum Compaction 0.0081
  • Loss per turn 625 keV
  • Damping times x/y/E, 5.0/4.6/2.2 ms
  • Energy spread/Bunch length 0.078/14 ps
  • RF Voltage 1.2 MV
  • Beam current, 31 mA
  • Combined-function FODO
  • 32 BDs and 28 BFs

½ of booster lattice
with W. Guo, J . Skaritka, R. Maier
9
Injector tunnel
  • Tunnel of 150m circumference
  • Same elevation as storage ring
  • Earthen berm on top and sides
  • Lower level accelerators
  • Upper level service areas, power supplies, RF,
    vacuum supplies, controls
  • Injector building may be shifted by 1 superperiod
    clockwise
  • Total injection system power consumption
  • 600 kW at 1 Hz
  • 200 kW in top-off

Lower level
Upper level
10
Challenges
  • Evaluation of losses at booster injection
  • Passing long bunch trains through the injector
    (flat-top of kickers)
  • Hunt and peck mode of injection
  • Single-bunch versus multi-bunch for complex bunch
    patterns
  • Minimization of injection transients in stored
    beam
  • Closing injection bump (feedback with additional
    weak kickers)
  • Individual versus in-series PS for kickers for
    reduction of injection transient

11
Conclusions
  • Injector with compact booster is under
    development
  • 200-MeV linac will provide with high charge per
    pulse in flexible bunch trains
  • Low emittance booster lattice is chosen (35 nm at
    3 GeV, 49 nm at 3.6 GeV), supported by
    simulations of injection process into Storage
    Ring TRACY-2 and ELEGANT
  • Linac and booster ring (w/o RF) are turn-key
    procurements with some modifications from
    original design transport lines and injection
    straight section by BNL
  • Increase in injector cost (7 M) due to the
    booster building

12
Future work
  • Refinement of ring injection tracking (including
    IDs, 3.6 GeV, etc.),
  • simulations of injection into the booster at low
    energy,
  • evaluation of losses throughout injector,
  • short bunch train analysis (beam loading),
  • minimization of transients in the ring injection
    straight design,
  • availability analysis.