Title: Canaseraga Central School District
1Canaseraga Central School District
- Proposed Capital Improvement Project
2Mission Statement
- The Canaseraga Central School District believes
that the primary purpose of an effective school
is teaching for learning. We believe that our
responsibility is to provide all students with an
opportunity to learn, achieve, and become
responsible, productive members of society.
3Facilities Planning Committee
- In an effort to make sure that the Canaseraga
Central School Districts facilities continue to
support the Districts Mission, the Board of
Education charged the Facilities Committee with
the following - Assess current facilities (SED Building Condition
Survey) - Identify the scope and cost of recommended
improvements (SED Five Year Plan) - Make recommendation to the Board of Education
4Facilities Planning Committee Members
- Kathie Berry
- Fran Hoffman
- Ami Hunt
- Neal Kellogg
- Steve Kenyon
- Dick Kinney
- Dave Ras
- Steve Sleight
- Dave Trickler
- James Anderson
- Marie Blum
5Background Information
- The Canaseraga Central School District owns and
maintains - 95,100 square footage of building area
- 72,825 square footage of roof
- 15.7 acres of site including 3.4 acres of paved
surfaces and athletic fields consisting of 5.6
acres
6Benchmark Capital Improvement Budgeting
- The Building Owners and Managers Association
(BOMA) recommends budgeting between 1.5 3 of
the replacement cost of a facility (23,750,000)
per year for the preservation and maintenance of
that facility - This equals 356,250 - 712,500 per year for the
Canaseraga CSD facilities
7Background Information SED Capital Project
Regulations
- Purpose of Building Aid
- Capital Improvement vs. Repair
- Maximum Cost Allowance for Building Aid
- Building Aid Ratio (93.6 of eligible expenses
reimbursed by State) - Assumed amortization over expected useful life of
improvement (15, 20 or 30 years) - Proper authorization required
- Building aid is a reimbursement District must
spend to get - Excel Funding
8Background Information SED Capital Project
Regulations
- Excel Funding is like a grant from the State
intended to support and encourage local school
districts to address Capital Projects in the
following categories - Health and Safety
- Accessibility
- Educational Technology
- Physical Capacity Expansion
- Energy Enhancement / Reduced Consumption
- Canaseraga CSDs Excel funding allocation is
221,014 - Project must be properly authorized to utilize
Excel Funding.
9Proposed Capital Improvement Project
- The Facilities Committee reviewed the SED
Building Condition Survey and Five year plan and
developed a list of proposed capital improvements - For the purpose of this presentation, these
improvements have been organized into the
following categories - Infrastructure (Health and safety, accessibility,
preservation and replacement of components and
systems at the end of their useful life) Excel
Eligible - Instructional (Classroom improvements,
instructional technology) - Excel Eligible - Athletics
- Transportation
10Reasons / Justification
- Infrastructure items
- Health and Safety
- Replacement of components and systems that are
nearing the end of their useful life - Accessibility to people with disabilities
(Mandate) - Energy Efficiency
11(No Transcript)
12(No Transcript)
13Reasons / Justification
- Instructional items
- Alterations and improvements to better suit
current instructional program and provide
mandated accessibility to people with
disabilities
14(No Transcript)
15Reasons / Justification
- Athletic items
- Improvements to specifically address drainage
16(No Transcript)
17Reasons / Justification
- Transportation items
- Replacement of existing bus garage which has the
following problems - Size of bays
- Location of bays in relation to school exit and
entrance doors. Buses need to back up near
occupied school building - Overall condition of building
- Overall site size as compared to SED standards
- Demolition of portion of existing bus garage and
renovation of remainder of building for storage - It is SEDs preference that Bus Garages not be
located on the same site as school buildings.
Refer to SED Facilities Planning letter
18(No Transcript)
19(No Transcript)
20(No Transcript)
21(No Transcript)
22(No Transcript)
23Proposed Capital Improvement Project
- Infrastructure
- Proposed projects at the Canaseraga School
- Roof Replacement
- Asbestos Removal
- Replace domestic water storage tank
- Refurbish boiler 2
- Replace Auditorium/Gym air handling units
- Toilet room renovations (accessibility)
- Masonry tuck-pointing
24Proposed Capital Improvement Project
- Infrastructure
- Proposed projects at the Canaseraga School
- Replace elementary classroom floor finishes,
cabinets and repaint - Replace elementary classroom doors and hardware
- Replace exterior doors, frames and hardware
(Energy efficiency and accessibility) - Replace interior gym doors
- Provide interior smoke doors
25Proposed Capital Improvement Project
- Infrastructure
- Proposed projects at the Canaseraga School
- Replace interior hardware for accessibility
- Accessibility improvements at locker rooms
- Exterior caulking replacement (energy efficiency)
- Replace exhaust fans
- Provide Air Conditioning at Data / Server room
- Emergency Generator Life safety systems only
26Proposed Capital Improvement Project
- Infrastructure
- Proposed projects at the Canaseraga School
- Replace telephone system
- Security CCTV system
- Security Access Control system
- Add PA and fire alarm to locker room
- Sidewalk replacement and improvements
- Gravel parking area
27Proposed Capital Improvement Project
- Instructional
- Proposed projects at the Canaseraga School
- Science room upgrades for accessibility
- Home and Careers upgrades for accessibility
- Renovation of existing space for remedial
programs - Auditorium/Gym renovations
- Auditorium stage lighting
- Auditorium sound system
- Gym sound system
28(No Transcript)
29(No Transcript)
30(No Transcript)
31(No Transcript)
32Proposed Capital Improvement Project
- Athletics
- Modest improvements to existing athletic fields
including - Removal of existing grass and topsoil
- Earthwork and grading to improve surface drainage
- Spread topsoil and seed
33(No Transcript)
34Proposed Capital Improvement Project
- Transportation
- Proposed New Bus Maintenance Garage (including
property acquisition)
35(No Transcript)
36(No Transcript)
37Proposed Capital Improvement Project
- Transportation
- Proposed work at existing bus garage
- Demolition of portion of existing building
- Remaining building will be renovated for general
school storage and buildings and grounds
equipment storage
38(No Transcript)
39(No Transcript)
40(No Transcript)
41(No Transcript)
42Estimated Schedule
- 6/26/08 BOE meeting State Environmental Quality
Review (SEQR) Resolution - 6/26/08 BOE meeting Board Resolution to
authorize amount, proposition language and date
of public vote - Fall 2008 Public Vote
- Fall 2008 Start design work after successful
public vote - Spring of 2009 Submit Construction Documents to
SED - SED review and approval takes 5 6 months after
submission (based on current review time) - Fall of 2009 Bidding and Award
- Spring 2010 Construction work start
- Summer 2010 Construction work in existing school
- Spring 2010 Start new bus garage construction
and site development (will take approximately 1
year)
43Capital Improvement ProjectProjected Cost
- Proposition
- Infrastructure 2,893,400
- Instructional 947,700
- Athletics 417,600
- Transportation 2,441,300
- Inflation/Market Index 1,005,000
- Total Proposition 7,705,000
44Long-term Financial PlanManagement of Debt
Service
- Key Factors
- New York State Excel Aid (221,014)
- Capital Reserve Fund
- Debt Service Fund
- Borrowing (Bond)
- State Building Aid Reimbursement (93.6)
- Term of Bond to be aligned with State Building
Aid Reimbursement to minimize impact on local tax
rate
45Net Estimated Impact on Taxes
- Based on key factors including authorizing the
use of 250,000 from Capital Reserve and
approximately 928,100 over 30 years from Debt
Service Fund - The estimated impact on the Tax Rate would be 0
46Summary
- Scope of the proposed improvements were
recommended by the Facilities Committee based on
their best analysis - The Facilities Committee recommendation is sound
and includes important and necessary projects
only - It makes financial sense to take advantage of the
NYS Excel Aid and to use the Districts Capital
Reserve and Debt Service Fund to minimize the
impact on the local tax rate
47Questions ?????