Title: NORTH WESTERN RAILWAY,
1STUDY OF BENCHMARKING NORMS FOR SICK LINE STAFF
AC COACH ATTENDANTS
- BY
- NORTH WESTERN RAILWAY,
- JAIPUR
Shri Arunendra Kumar, CPO
2Benchmarking (BM) Norms
1
A.
3 Other Inputs of Staff in Sick Line as per
Benchmarking norms
2
B.
- Statistical 8 men each for Electrical
Mechanical with Depot holding of more than 150
coaches. - Material Storage/Accountal
- Mech. - 26 men for 150 or more coaches
- Elect. - 13 men for 150 AC coaches or more
- - 15 men for excess of 500 coaches
including AC coaches. - Power cars 12 men (Electrical) for 10 power
- cars.
4Depots Inspected
3
C.
- Jaipur
- Jodhpur
- Bikaner
- Mumbai Central
- Bandra Terminus
- Surat
- Ahmedabad
5 BM Norms are Applicable to Target Ineffective
Coaches
4
D.
- Targets for Sick Line are
- AC Coaches 3
- NAC Coaches 2.5
6 Actuals of Sick Ineffectiveof Coaches
5
E.
7 Staff for AC Coach Maintenance for all Types of
Work(Separate Workwise Bifurcation is virtually
Non-Existent)
6
F.
- Figures are not comparable as TL/AC Cadre is
merged. - Figures in Brackets () indicate staff per Coach.
8 Actuals of Sick Ineffective of Coaches
7
G.
9Men on Roll in various Depots
8
H.
10 BM Norms for AC Coaches creates a situation of
Staff Sanctions for no work
9
I.
- At JP the AC Coach holding is 103 Coaches. But
there was no AC coach in Sick Line at JP. - Jan 07 26 days (Staff idling).
- Feb 07 20 days (Staff idling).
- This peculiar situation is true for most of the
depots ( except mega depots). Even in mega depots
the actual staff available is much more than the
prescribed BM norms.
11Sick Line (Electrical)
10
J.
- Though separate BM norms exist for Sick Line
but, as a practice, staff distribution is not
done for separate location of work. These
locations could be sick line, platform, pitline
etc. It is based on day to day judgement. Hence
comparisons are not feasible.
12 The RAC Electrical Staff Distribution in Two
Categories viz Maintenance and Escorting
11
K.
13 Change in ground realities after issue of BM
norms
12
L.
- Mechanical
- Increase in Train Kilometrage before next primary
maintenance. - Lighter and long lasting Composite brake blocks
instead of cast iron brake blocks. - Increase in use of stainless steel or FRP in
coaches.
14 Change in ground realities after issue of BM
norms
13
L.
- Electrical
- Invertors in AC coaches
- AC fans
- VRLA Batteries
- Roof Mounted ACs (RMPU)
- Note - Above changes have improved overall
- reliability leading to less Ineffective of
Coaches and reduced coach
detachment on line.
15Observations
14
M.
- Sick Line staff is for Maximum Ineffectives of
Coaches. Actual Ineffectives of Coaches are very
much less.
16Observations
15
M.
- Outsourcing (which has happened selectively)
- Cleaning in Sick Line.
- Passenger amenity maintenance of coaches.
- Repair contracts of Electrical Sub-assemblies
like RMPUs/ Alternations/ Water Raising
Apparatus.
17SUGGESTIONS
16
N.
- Avoid situations for AC coaches where staff
exists without work for long periods. - Multi-Skilling
- Only TWO categories of staff needed in Sick Line.
- - U/gear Technician.
- - Coach Amenity Technician.
- To enhance skills mandatory and periodical
Training programme to be launched, may be through
PPP. Presently, Railway trains running staff in
a formal way.
18SUGGESTIONS
17
N.
- Productivity enhancement
- Provide motorized and full spectrum of hand
tools to artisans e.g. Carpenter in any of the
depots is not having a Tool belt. Motorized hand
tools exist as samples only. Carpenters still
use chisels for cutting a ply in curve shape.
19SUGGESTIONS
18
N.
- Merge coaching cadre of Mechanical Electrical
to consolidate BM norms further. - Merge RAC TL staff for improving productivity
of electrical staff. - Power cars equipment maintenance is already
outsourced to OEMs. Separate classification of
staff in BM Circular is not needed.
20SUGGESTIONS
19
N.
- Provide computers, scanners, printers, digital
cameras and LAN Statistical staff shall get
reduced. - Delegate powers for Transportation contracts
including handling of material to SSEs of Sick
Line. It shall reduce Material Storage/
Accountal staff.
21CONCLUSIONS
20
O.
- Due to reduction in Sick Line Ineffectives the
BM norms provide for quite relaxed availability
of staff in Sick Line, both in Mechanical and
Electrical Departments.
22CONCLUSIONS
21
O.
- Depending on acceptability of suggestions, Sick
Line staff Mechanical Electrical can be
reduced by 25-30 . Moreover, AC staff and TL
staff should be integrated and separate BM norms
for AC be pruned drastically or WITHDRAWN.
23CONCLUSIONS
22
O.
- All benchmarking norms are issued by concerned
Executive Branches. However, no reference to
Personnel Branch is made at Boards level before
issue. It is suggested that Benchmarking norms be
issued by Establishment Branch of Board, as it
relates to creation of staff.
24AC COACH ATTENDANTS
23
25 BM norms issued by Commercial directorate -
Commercial circular No. 29 dated 13.09.99
24
A.
No supervisor for Other Mail/Exp train. For
Super fast Mail/Exp 1 ACCI per four coaches
26Duties of ACCA
25
B.
- Boards letter No. 83/Elect/138/8 dated
24/25-10-85. - There are 22 items of duties in this list
- 21 concern commercial directorate.
- One is technical reg. noting of pressure/
- voltages (Not actually done).
2726
C.
Observation
- Presently all ACCAs are with Continuous
classification. Workload justifies EI
classification. Change over EI has been
restricted by Boards letter No. E(LWA)61/Adj/8
dated 7.5.69 which refers to directions from
Ministry of Labour.
28AC Coach Holding
27
D.
All Group D RAC staff get chance by rotation
29Ground realities of ACCA
28
E.
- No separate cadre and all Group D RAC staff get
a chance by rotation. - Overtime earnings are very very high.
- Very long duty hours in continuous roster. An
ACCA, say, 2903 Dn BCT-ASR puts in 66 40 hours
in UP/Dn directions combined. He takes
Compensatory rest on return to Headquarter as
also Overtime.
30Working of ACCI/ACCA in 2903 DN/2904 UP Golden
Temple Mail, BCT-ASR - Overtime Calculation
29
- Total Duty
68.40 hrs. - Total duty in an average period 192.16 hrs.
- Employees required 5
- OT in a month 192.16-10488.16x2176.32 hours
per employee.
31 Overtime details at RAC depotJaipur
30
F.
- Jan Dec06 (11 months only).
- Rs. 21.3 lakhs for 97 men
- Men Value (in lakhs of Rs.)
- Total 97 21.31
- Average - 21,958
- or Rs. 1996/- pm per
- employee.
- Maximum per person Rs. 47,655 earned in 10
months working which works out to - a) 40 at minimum of scale of pay and
- b) 33 at maximum of scale of pay.
32Suggestions
31
G.
- If commercial duties are outsourced, which has
happened because of IRCTC taking over, ACCA
category can be ABOLISHED. - AC coach problems enroute, if any, can be handled
by one supervisor and one AC fitter per train
(Rajdhani-Shatabdi) and Platform staff at halts
for Super Fast and Other Mail/Exp. Trains.
33THANK YOU
34Annexures
- Benchmarking norms for Sick Line staff (Mech).
Railway Boards letter No.2000/MC/143/5 dated
24.12.2001 - Benchmarking norms for Sick Line staff (Elect).
Railway Boards letter No.2000/Elec(G)/181/21 Pt
dated 22.11.2004 - Executive Director/Passenger Marketing. Railway
Boards letter No. 99/TG.V/12/2 dated 13.09.99
regarding deployment of existing staff on train. - Duty list of ACCA annexure to Boards letter
No. 83/Elect 1/138/8 dated 24/25.10.85.
35BENCHMARKING NORMS FOR MAINTENANCE STAFF -
PROVISION FOR COACHING MAINTENANCE
36(No Transcript)
37NOTE 1. The above norms (other than sick line
are inclusive of rest giver allowance (RC) but
leave reserves (LR) may be provided as
applicable. For sickline, both LR RG are
included. 2. The norms do not cover Ministerial
staff and divisional control staff which may be
provided according to local practices.
38Bench Marking for providing maintenance
escorting staff for AC coaches as well as
maintenance staff for TL coaches
39(No Transcript)
40(No Transcript)
41Deployment of escorting staff on Rajdhani/
Shatabdi Express/Rajdhani type nominated
trains/other Superfast Mail/Express Trains
42(No Transcript)
43N.5 No ACCA for AC Chair Car.