Title: Integration of Variable Generation Task Force IVGTF
1Integration of Variable Generation Task Force
(IVGTF) Emerging Issues
Mark LaubyManager, Reliability
Assessments mark.lauby_at_nerc.net
2About NERC
- The electric industrys self-regulatory
organization for reliability - Balances the interests of all stakeholders
- Represents industry consensus
- Independently acts in the best interest of
reliability - International charter lending government
support and oversight to SRO activities, ensuring
that the best interests of society-at-large are
represented - Federally recognized Electric Reliability
Organization in the U.S. - Agreements in place with several Canadian
provinces and developing these agreements in
others
3About NERC Mission
To ensure the reliability of the North American
bulk power system
- Develop enforce reliability standards
- Assess current and future reliability
- Analyze system events recommend improved
practices - Encourage active participation by all
stakeholders - Pursue mandatory standards in all areas of the
interconnection
42007 LTRA Report
Integration of Wind Solar Resources Require
Special Considerations in Planning, Design,
Operation
- Operational challenges must be resolved
- Transmission needed to support renewable
development - Clean Energy Superhighway
- NERC to monitor federal carbon legislation for
impact on reliability
5NERCs Actions
- Evaluate operational requirements
- Recommend standards.
- Develop a consistent approach for rating variable
resources - Available capacity at time of system peak
- Developed Integration of Variable Generation Task
Force
6Engaging Industry Experts
- Integration must support a reliable bulk power
system - Variable Resources affect planning/operations
- Reviewed by the Operating Planning Committees
in December 2007 - Integration of Variable Generation Task Force
7IVGTF Scope
- The Task Force will prepare
- A concepts document that includes the
philosophical and technical considerations for
integrating variable resources - Specific recommendations for practices and
requirements, including reliability standards,
that cover the planning, operations planning, and
real-time operating timeframes. - The document will include
- Planning timeframe issues, such as contribution
to reserve margins and modeling requirements to
test system reliability, - Operational Planning and Real-time operating
timeframe issues, including Interconnection
frequency, and primary and secondary generation
control - Review NERC Standards for any gaps
- Conclusions and recommendations.
8IVGTF Guiding Principles
- Bulk power system reliability must be
maintained, regardless of the generation mix - All generation must contribute to overall bulk
power system reliability - Standards and criteria established must be fair,
transparent and performance-based - Planners and operators must understand the
challenges presented by large scale integration
of variable generation - Wind and other variable generation must
effectively integrate into planning and
operations practices to ensure reliability - New Planning/operating tool requirements will be
described in terms of bulk power system
reliability performance
9IVGTF Outline of White Paper
- Characteristics of Variable Generation
- Planning and Technical Impacts
- System Operations
- Other and Future Considerations
- NERC Standard Review
- Conclusions Recommendations
- Glossary
10IVGTF Status
- High Industry Interest
- 50 Nominations received
- Liaisons being built with Industry Groups
- American Wind Energy Association (AWEA)
- Canadian Wind Energy Association (CanWEA)
- Utility Wind Integration Group (UWIG)
- Solar Energy Industries Association (SEIA)
- IEEE-PES
- EPRI
- U.S. Department of Energy
- Union for the Co-ordination of Transmission of
Electricity (UCTE)
11IVGTF Status Work Plan
12Emerging Issues Scenarios
132008 Key Findings Emerging Issues
- Collaborative Effort with NERC Staff
- Packaging
- Condense focus to no more than five key
emerging issues - Broader issues do not change year to year create
separate document - Divide Key Findings section into
- Key Findings from Regional Assessments
- Emerging Issues from the industry
- Specific Emerging Issues identified
- Progress from 2007 Report section
14Risk Assessment of Emerging Issues
- Emerging Issues is critical driver for
- Assessment concentration
- Scenario analysis
- Industry experts to identify Emerging Issues for
prioritization - Ranking based on combination of likelihood
severity (consequences) - To manage expectations and speculation by
regulators legislators about how utilities
should respond to these issues - To inform the policy debate
152008 LTRA Emerging Issues
- 7 Issues Identified by NERC Staff RAS,
prioritized - Greenhouse gas reductions
- Fuel storage transportation
- Rising global demand for energy equipment,
increased off-shore manufacturing of raw
finished materials - Increasing adoption of demand-side distributed
generation resources - Replacing and upgrading transmission
infrastructure for the 21st century - Water usage
- Mercury emissions
- RAS will expand on a number of these in the 2008
LTRA
Priority
16Candidate Scenarios
- Should have significant impact on the reliability
of the bulk power system - Must be a future condition providing enough
lead-time for assessment to inform a solution - Selected with consideration for the definition of
Adequate Level of Reliability - Will be ranked by NERC PC based on likelihood
severity
17Emerging Issues Scenarios
Year 1
Year 2
LTRA Published
RAS Peer Review Scenario
PC assigns RIS, RAS TIS to develop list of
emerging issues
NERC Staff
Regions perform Scenario Reliability Assessment
PC agrees to scenarios for the following year,
based on risk assessment of emerging issues.
Scenario study outline peer reviewed by RAS PC
RAS assigns scenarios. Sends with LTRA Data
Request.
Regions develop Scenario Study Outline
182008 Emerging Issues Scenario Analysis
- Scenario 1 Study renewable integration in
2009. If there is little or no impact of
Scenario 1 on a region, then the Region must
perform Scenario 2 - Scenario 2 A scenario picked by the Region for
study in 2009 - Details of scenarios would be proposed by
Regions, coordinated with RAS, and approved by
the PC at June 2008 meeting
19Thank You