Collocation Project Management
The Qwest CLEC Forum May 13-14, 2002
The information provided on every slide in the
following presentation is for training purposes
only. The information provided does not create or
modify any legal obligations, promises or
expectations between Qwest and CLEC customer. The
parties relationship is governed by existing
legal obligations and contracts.
2Collocation Wholesale Project Management
Q w e s t W h o l e s a l e M a r k e t s
3Collocation Wholesale Project Management
Maximize service to our CLEC customers and
provide effective project management for their
collocation requirements.
Q w e s t W h o l e s a l e M a r k e t s
4Collocation Wholesale Project Management
- Collocation Time Line
- CLEC Issues Application
- Order Validation
- Feasibility
- Quote Issuance
- Quote Acceptance
- Construction Completion
- Walk-through with SICM
- Acceptance by CLEC
Q w e s t W h o l e s a l e M a r k e t s
5Collocation Wholesale Project Management
Single Point of Contact for CLEC for all issues,
questions, concerns regarding collocation sites
from application through construction completion.
Q w e s t W h o l e s a l e M a r k e t s
6Collocation Wholesale Project Management
- Application Types
- New
- Augments
- Changes
- Transfer of Responsibility
- Decommissions
Q w e s t W h o l e s a l e M a r k e t s
7Collocation Wholesale Project Management
- Products
- Caged
- Cageless
- Virtual
- ICDF (Interconnect Distribution Frame)
- Remote
- FCP (Field Connection Point)
- Facility Connected
- Power Reduction
- Adjacent
- Splitter
Q w e s t W h o l e s a l e M a r k e t s
8Collocation Wholesale Project Management
http//www.uswest.com/wholesale/pcat/collocation.h
tml
Q w e s t W h o l e s a l e M a r k e t s
9Q w e s t W h o l e s a l e M
a r k e t s
Q w e s t W h o l e s a l e M
a r k e t s
WholesaleProduct Marketing
The Qwest CLEC Forum May 13-14, 2002
The information provided on every slide in the
following presentation is for training purposes
only. The information provided does not create or
modify any legal obligations, promises or
expectations between Qwest and CLEC customer. The
parties relationship is governed by existing
legal obligations and contracts.
10Agenda
- Wholesale Product Management Collocation Team
- Recent Product Deployments
- Cost Docket Status and Impacts
- Preview of New Products In Development
- Questions
Q w e s t W h o l e s a l e M a r k e t s
11Wholesale Product ManagementCollocation Team
Q w e s t W h o l e s a l e M a r k e t s
12Recent Product Deployments
- Collocation Transfer of Responsibility (ToR)
- Facility Connected Collocation (FC)
- DC Power Reduction
Q w e s t W h o l e s a l e M a r k e t s
13Transfer of Responsibility
- Product Description
- Transfer of a Collocation site to an assuming
CLEC from a vacating CLEC. - Offered for Caged Physical, Cageless Physical,
Virtual, and ICDF Collocation. All other types
of Collocation to be transferred will be handled
on an Individual Case Basis. - Two types of Collocation Transfer of
Responsibility - Transfer without working circuits
- Transfer with working circuits
- Transfer with working circuits is offered if
administration changes are required and does not
involve translations activity.
Q w e s t W h o l e s a l e M a r k e t s
14Transfer of Responsibility
- Ordering
- Prior to submitting a Collocation Transfer of
Responsibility request - Assuming CLEC is required to have an
Interconnection Agreement with Qwest. Also will
need to amend any previously-existing ICA if it
does not include services to be transferred. - Vacating and Assuming CLEC must sign the
Collocation Transfer of Responsibility amendment. - Process begins by the assuming CLEC submitting
the Collocation Transfer of Responsibility
Application form and submitting to colo_at_qwest.com
and rfsmet_at_qwest.com.
Q w e s t W h o l e s a l e M a r k e t s
15Transfer of Responsibility
- Ordering continued
- In addition to the application form the following
information will need to be included - Collocation Transfer of Responsibility
Spreadsheet, if there are working circuits -
providing detail on each working circuit to be
transferred. - Qwest Transfer Authorization Agreement, signed by
the vacating and assuming CLECs. - Letter of Authorization, if the Collocation site
has a CLEC-to-CLEC (Direct) arrangement, signed
by the assuming CLEC and the CLEC partner. - Email verification from the vacating CLEC
representing that all of its end users have been
notified of the transfer, if there are working
circuits.
Q w e s t W h o l e s a l e M a r k e t s
16Transfer of Responsibility
- Ordering continued
- Qwest will review the required documentation,
check the financial status and confirm that no
one is waiting in the queue for Collocation space
in the requested Central Office. - Qwest will initiate a quote to the assuming CLEC,
who is required to pay 100 as acceptance of the
quote. - If the transfer is with working circuits, the
CLEC must submit LSRs. Circuits submitted via an
ASR will be processed based on the information
provided on the Collocation Transfer of
Responsibility Spreadsheet. - At the completion of the transfer, the vacating
CLEC, assuming CLEC and Qwest will sign the Qwest
Services Transfer Agreement.
Q w e s t W h o l e s a l e M a r k e t s
17Transfer of Responsibility
- Rate Elements
- Vacating CLEC will not incur charges for the
transfer of the Collocation site. - The quote for the assuming CLEC will reflect the
following - Nonrecurring charges associated with the transfer
of the Collocation site - Assessment Fee
- Network Systems Administrative Fee
- Nonrecurring charge(s) for processing
Interconnection circuits, if applicable.
Q w e s t W h o l e s a l e M a r k e t s
18Transfer of Responsibility
- Collocation Product Catalog (PCAT)
- www.qwest.com/wholesale/pcat/collocation.html
- Contract Amendment
- www.qwest.com/wholesale/clecs/negotiations.html
- Jane Lacy - Product Manager
- jmlacy_at_qwest.com
Q w e s t W h o l e s a l e M a r k e t s
19Facility Connected Collocation
- Product Description
- Allows access to Unbundled Network Elements
(UNEs) without collocating physical equipment in
a Qwest Wire Center - FC Collocation takes place on a Termination Block
or Termination Panel engineered by Qwest - Allows termination of a copper or fiber cable at
a demarcation point - Available for cross connection to DS0 and DS1
level UNE services. DS3 levels of service, or DS1
utilizing fiber are available via the Bona Fide
Request (BFR) Process
Q w e s t W h o l e s a l e M a r k e t s
20Facility Connected Collocation
- Rate Elements Non-Recurring
- Quote Preparation Fee (QPF)
- Engineering Labor
- Copper/Fiber Entrance Facility
- Termination Block
- Termination Panel
- DS1 Voltage Isolation
Q w e s t W h o l e s a l e M a r k e t s
21Facility Connected Collocation
- Rate Elements Recurring
- Copper/Fiber Entrance Facility
- Termination Block
- Termination Panel
- DS1 Voltage Isolation
Q w e s t W h o l e s a l e M a r k e t s
22Facility Connected Collocation
- Ordering and Intervals
- Requested via the Facility Connected Application
Form as described in the Collocation PCAT - Qwest will provide space feasibility within 10
Calendar days of receiving a complete application
- Qwest will provision FC Collocation within 90
calendar days of receipt of application given
timely CLEC acceptance of quote - CLEC must have established entrance facility at
the POI within 53 calendar days upon Qwests
receipt of complete FC Collocation Application
Q w e s t W h o l e s a l e M a r k e t s
23Facility Connected Collocation
- Collocation Product Catalog
- www.qwest.com/wholesale/pcat/facconcollo.html
- Contract Amendment
- www.qwest.com/wholesale/clecs/negotiations.html
- Benjamin Campbell - Product Manager
- bocampb_at_qwest.com
Q w e s t W h o l e s a l e M a r k e t s
24DC Power Reduction
- Product Description
- Allows CLECs to reduce primary or secondary DC
power feeds to their collocation site - Primary feed may be reduced to a minimum of 20
amps - Secondary feed may be reduced to 0 amps while
holding cabling and fuse position for future use
(pending availability) - Provides an option to hold power cabling and fuse
or breaker position on a power board or Battery
Distribution Fuse Bay (BDFB) for future power
augment requests - Where shortage of fuse position is imminent, CLEC
has option to energize secondary feed to minimum
20 amps, or relinquish held fuse position to Qwest
Q w e s t W h o l e s a l e M a r k e t s
25DC Power Reduction
- Ordering Procedure
- CLEC must sign the DC Power Reduction Amendment
- CLEC completes power section of the Collocation
Application and submits to Qwest as described in
the Collocation PCAT - Qwest Collocation Project Management Center
(CPMC) will notify CLEC of any Application
deficiencies within 10 calendar days of receipt - Walk through of collocation site is performed to
determine work required to perform power reduction
Q w e s t W h o l e s a l e M a r k e t s
26DC Power Reduction
- Billing
- Billing to CLEC for initial power will be reduced
upon receipt of payment for the charges quoted
for the DC Power Reduction - Reduced billing will be made effective back to
the date of acceptance of the Power Reduction
Application - Recurring billing for the Power Maintenance
Charge will terminate upon power restoration or
fuse position return (for secondary feed)
Q w e s t W h o l e s a l e M a r k e t s
27DC Power Reduction
- Rate Elements
- Quote Preparation Fee (NRC)
- Power Reduction Charge (NRC)
- Power Maintenance Charge (RC)
- Power Restoration Charge (NRC)
Q w e s t W h o l e s a l e M a r k e t s
28DC Power Reduction
- Collocation Product Catalog (PCAT)
- www.qwest.com/wholesale/pcat/collocation.html
- Contract Amendment
- www.qwest.com/wholesale/clecs/negotiations.html
- Matthew Rossi - Product Manager
- mrossi_at_qwest.com
Q w e s t W h o l e s a l e M a r k e t s
29Cost Docket Status and Impacts
- Cost Structure for Collocation
- Based on TELRIC principles
- No economic return under TELRIC
Q w e s t W h o l e s a l e M a r k e t s
30Cost Docket Status and Impacts
Q w e s t W h o l e s a l e M a r k e t s
31Cost Docket Status and Impacts
- Status of Commission Collocation cost orders
- Existing orders that have been received
- September 1997 OR
- January 1998 AZ
- December 1998 IA, NM
- June 1999 UT
- July 1999 CO
- June 2000 MN
- December 2000 WA
Q w e s t W h o l e s a l e M a r k e t s
32Cost Docket Status and Impacts
- Current activity timeframes
- October 2001
- WA , MT
- March 2002
- IA
- April 2002
- UT, CO, NE
- Actual Estimated ordered dates
- May 2002
- AZ
- June 2002
- NM, OR
- September 2002
- ID, MN, WY
- December 2002
- ND, SD
Q w e s t W h o l e s a l e M a r k e t s
33New Products in Development
- Collocation Available Inventory
- Competitive Fiber Providers
- ICDF Joint Testing Process (ICDF-JTP)
Q w e s t W h o l e s a l e M a r k e t s
34Collocation Available Inventory
- What is Available Inventory?
- Existing collocation sites and elements that have
been returned to Qwest due to legal proceedings,
abandonment, cancellation or decommission - How will this product benefit CLECs?
- Enables CLECs to view available discounted
collocation sites and elements - Allows CLECs to purchase reused collocation site
inventory at a reduced cost - Allows reimbursable and reusable elements to be
refunded to the vacating CLEC (for up to 3
years)
Q w e s t W h o l e s a l e M a r k e t s
35Collocation Available Inventory
- How do CLECs see what is Available?
- Qwest will implement a Collocation Classifieds
web site in which all returned space and elements
will be listed for view - How do I learn more about this product?
- A Presentation will be made to the CLEC community
at the 5/15/02 Product and Process CMP Monthly
Meeting. For more information on CMP please
visit www.qwest.com/wholesale/cmp/index.html - Matthew Rossi - Product Manager -
mrossi_at_qwest.com
Q w e s t W h o l e s a l e M a r k e t s
36Competitive Fiber Provider
- What is Fiber Provider Point of Entry?
- Provides a mechanism for CFPs to terminate fiber
from the Collocation Point of Entry (C-POI) to a
Fiber Distribution Panel (FDP) in the central
office without collocation of equipment. - How do I learn more about this product?
- This product is currently being developed as a
level 3 Qwest initiated CMP Change Request. For
more information on CMP please visit
www.qwest.com/wholesale/cmp/index.html - Benjamin Campbell - Product Manager
bocampb_at_qwest.com
Q w e s t W h o l e s a l e M a r k e t s
37ICDF Joint Testing Process
- What is ICDF Joint Testing?
- Will allow a CLEC and Qwest to joint test DSO,
DS1, DS3 and Line Sharing terminations for
continuity at the Interconnection Collocation
Distribution Frame (ICDF) - What are the Terms and Conditions?
- CLEC must submit a Joint Test Process Application
- CLEC can submit request for Joint Testing with
their Collocation Application for up to 60 days
past scheduled collocation RFS. - Pricing is based on a time and materials cost
recovery basis
Q w e s t W h o l e s a l e M a r k e t s
38ICDF Joint Testing Process
- How do I learn more about this product?
- This product is currently being developed as a
level 3 Qwest initiated CMP Change Request. For
more information on CMP please visit
www.qwest.com/wholesale/cmp/index.html - Benjamin Campbell - Product Manager
bocampb_at_qwest.com
Q w e s t W h o l e s a l e M a r k e t s
39Questions?