19.1.2006, GSI DarmstadtDavid Boutin, JLU Giessen - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

19.1.2006, GSI DarmstadtDavid Boutin, JLU Giessen

Description:

UoS, Surrey. GSI, Darmstadt. Task leader: ... UoS Surrey: 10 MM out of 24. GSI ... UoS Surrey: no contribution, no request. GSI Darmstadt: no ... – PowerPoint PPT presentation

Number of Views:38
Avg rating:3.0/5.0
Slides: 8
Provided by: martinw8
Category:

less

Transcript and Presenter's Notes

Title: 19.1.2006, GSI DarmstadtDavid Boutin, JLU Giessen


1
DIRACsecondary Beams
Report on Ion-optical design studies and
application Task 9 NUSTAR 4


Participants JLU, Giessen (leading)
UoS, Surrey GSI, Darmstadt Task leader
Wolfgang Plaß (JLU)
2
Main activities and results of NUSTAR 4 in 2005
  • 1st order ion-optical design of a strong focusing
    system for the Super-FRS target
  • 1st order ion-optical design of a large
    acceptance energy buncher

3
Strong focusing system consisting of superferric
quadrupole magnets (I)
  • Main options single magnets or split magnets
  • Final spot size in front of Super-FRS target (1 ?
    2) mm2
  • Studied Br range 18 100 Tm
  • gt different phase space
  • Possibility to use other quadrupole designs
    (SIS100, FRS, Super-FRS)

4
Single magnets design
  • Four identical magnets
  • Compact system
  • Design similar to SIS100 magnets

x / 28 cm
Br 100 Tm
y / 28 cm
16.9 m
x / 28 cm
Br 27 Tm
y / 28 cm
Results for Br 100 Tm
5
Split magnets design
  • Each magnet is split into 2 or 3
  • More flexible
  • Super-FRS magnets (Q2, Q3) can be used

x / 40 cm
Br 100 Tm
y / 40 cm
24.8 m
x / 40 cm
Br 27 Tm
y / 40 cm
Results for Br 100 Tm
6
1st order ion-optical design of a large
acceptance energy buncher
7
Conclusion
  • Personal spent JLU Giessen 19 MM out of 102
  • UoS Surrey 10 MM out of 24
  • GSI Darmstadt 2 MM out of 6
  • Capital investment JLU Giessen 0 k out of 17
  • UoS Surrey no contribution, no request
  • GSI Darmstadt no contribution, no
    request
  • 2 coordination meetings
  • In time with Implementation plan of Task 9 -
    NUSTAR 4
Write a Comment
User Comments (0)
About PowerShow.com