Title: Water


1
Water Sediment Control Basin (WASCOB) Mike
Cox State Conservation Engineer
Contractor Certification Training March 2008
2
Water Sediment Control Basin (638)
  • Purpose 1) Reduce gully erosion
  • 2) Trap Sediment
  • 3) Reduce and manage downstream
    runoff
  • WASCOBs are typically used when drainage areas
    are smaller.
  • WASCOB Spacing is to reduce slope length and
    accommodate equipment width

3
  • Farmed - WASCOB
  • Slopes are flatter (51 to 101)
  • More yardage must be used during construction
  • Harder to fit into steep areas

4
  • Grassed - WASCOB
  • Slopes are steeper (31 to 51)
  • Less yardage used during construction
  • Fits better into steep areas
  • Slopes steeper than 51 must be grassed

5
  • Compaction of Earth Fill
  • Use 6-9 Lifts
  • Dozer or Loaded Pan on Each Lift 2 passes
  • Sheepsfoot Roller 1 pass

6
  • Borrow Areas
  • Dont get borrow at the channel
  • Unless plans call for the channel to be excavated
  • Borrow should come from field above
  • Remember to stockpile topsoil

7
  • Outlets for WASCOBs
  • Underground Outlet (620)
  • Outlet tile is sized per orifice diameter
  • Orifice plates must be installed

8
  • Risers
  • Must be minimum of 2.5 in height

9
Installation Report http//www.in.nrcs.usda.gov/t
echnical/engineering/engineering.html Look Under
Contractor Certification Section
10

11
Helping People Help the Land