Working Groups - PowerPoint PPT Presentation

1 / 4
About This Presentation
Title:

Working Groups

Description:

How do calibration and validation requirements impact observatory maneuvers and ... Yaw maneuver. Recommend that this be a requirement for instrument/spacecraft/LTAP ... – PowerPoint PPT presentation

Number of Views:50
Avg rating:3.0/5.0
Slides: 5
Provided by: informat1347
Category:
Tags: groups | working | yaw

less

Transcript and Presenter's Notes

Title: Working Groups


1
Working Groups
  • Instrument Engineering
  • How do calibration and validation requirements
    impact observatory maneuvers and data collection
    scheduling?
  • What types of information need to be made
    available
  • With products
  • In the Data Warehouse
  • Calibration of the historical archive to ensure
    data interoperability
  • Selection of pseudo-invariant sites for data
    characterization
  • Co-registration of OLI and TIR data

2
Instrument Engineering
  • Near Term Issues/Recommendations
  • Yaw maneuver
  • Recommend that this be a requirement for
    instrument/spacecraft/LTAP
  • Access to flight hardware (polite requestnot
    requirements creep)
  • Engineering samples of key system components
  • Initial burn-in data on detectors and/or filters?
    (is this being done?)
  • Invitation of LST engineering representatives to
    critical reviews
  • Early and open access to vendor metadata for IAS
    development
  • Thermal Instrument
  • Support necessary engineering to ensure inclusion
    of thermal instrument is not hindered
  • Instrument registration issues have not been
    addressed
  • Consider incorporation of a reflective band for
    this purpose
  • Ensure final data product is transparent to users
  • Hooks need to be in place in ground processing
    system

3
(No Transcript)
4
Instrument Engineering
  • Data Gap Calibration Gap
  • Calibration continuity to preserve temporal value
    of the archive
  • Pseudo-invariant (Desert) Sites likely to be best
    approach
  • Monitor with L5 L7
  • Monitor with AWiFS/CBERS other likely instruments
  • Early acquisition with LDCM
  • Cross-cal of L5/L7 to likely gap fill instruments
    (AWiFS/CBERS/etc)
  • Encourage development of metadata to support
    early Landsat archive
  • L7 IAS ? L5/L4 TMIAS ? MSS-IAS
  • Make sure access is provided to key instrument
    health data (web-enabled)
Write a Comment
User Comments (0)
About PowerShow.com