INTENTIA AND MOVEX: - PowerPoint PPT Presentation

1 / 44
About This Presentation
Title:

INTENTIA AND MOVEX:

Description:

Enable Orderless production field. Item Location. Open (MMS065) ... Enable Orderless production field for assemblies. Item. ... Report Orderless (PMS260) ... – PowerPoint PPT presentation

Number of Views:1341
Avg rating:3.0/5.0
Slides: 45
Provided by: david1489
Category:

less

Transcript and Presenter's Notes

Title: INTENTIA AND MOVEX:


1
INTENTIA AND MOVEX GATEWAY TO COMPETITIVE
LEADERSHIP
Presenter David F. Ross, CFPIM Education
Business Group Manager Intentia-Americas
2
Title Education Business Group Manager -
Americas Years with Intentia 6 years Years of
Experience 30 years - 13 years Manufacturing
and Distribution Industries - 17 years
MRP II, ERP, e- Business
Software Professional Certified APICS CFPIM
and APICS Instructor
Meet Dave Ross
3
  • Defining Lean Manufacturing
  • Exploring the Five Principles of Lean
    Manufacturing
  • Understanding the Pull System Concept
  • Lean Manufacturing Functions in Movex
  • Practical Exercises
  • Implementation Implications

Presentation Overview
4
A philosophy of manufacturing based on the
planned elimination of all waste, the continuous
improvement of productivity, and a relentless
search to convert waste into customer winning
value
Defining Lean Manu-facturing
5
  • Production of Value
  • Optimizing the Value Stream
  • Converting the Process to Flow
  • Activating Demand Pull
  • Perfection of All Products, Processes, and
    Services

Five Principles of Lean Thinking
6
The Pull System - Concept
  • Physical/visible pull signal initiates
    manu-facturing and material movement of material
  • Level of inventory and work controlled by the
    number of Kanbans in the system

Pull Signal
Customer Order
Buffer Area 1
Buffer Area 2
Buffer Area 3
Buffer Area 4
Material Flow
7
Movex Supports Two Types of Lean Manufacturing
Processing
  • Physical Kanban System

Two Types of Kanban Processing
Production kanban
10/08/98
KAN-001
Item no . . . . . .
Kanban item
Name . . . . . . . .
KANBAN11
To location . . .
85
Order Quantity .
  • Electronic Kanban System

8
  • Use of Physical Kanban
  • Use of Production and/or Trans-portation Kanban
    both Printed by Movex
  • Kanbans contain information such as item number,
    des-cription, location, quantity, and lead time
  • Number of Kanbans can be entered manually or
    auto-matically

Physical Kanban - Overview
9
  • Movex used to report production and record
    transaction issues
  • Movex Business Engine and Advanced Production
    Planning applications are not used
  • Performance measurement and continuous
    improvement focused on number of Kanbans in the
    system

Physical Kanban - Overview
10
  • Full container is moved to assembly

Physical Kanban FlowDetail
11
T
P
Transportation Card
Production Card
1
ASSEMBLY
ASSEMBLY AREA BUFFER
T
T
12
  • Full container is moved to assembly
  • Transportation Kanban removed from container and
    sent with empty container to subassembly

KANBAN FlowDetail
13
T
P
Transportation Card
Production Card
1
ASSEMBLY
ASSEMBLY AREA BUFFER
T
T
2
T
SUBASSEMBLY PRODUCTION
14
  • Full container is moved to assembly
  • Transportation Kanban removed from container and
    sent with empty container to subassembly
  • Production Kanban removed from container and
    replaced with transportation Kanban and container
    moved to assembly

KANBAN FlowDetail
15
T
P
Transportation Card
Production Card
1
ASSEMBLY
ASSEMBLY AREA BUFFER
T
T
2
T
T
3
SUBASSEMBLY PRODUCTION
P
SUBASSEMBLY AREA BUFFER
16
  • Full container is moved to assembly
  • Transportation Kanban removed from container and
    sent with empty container to subassembly
  • Production Kanban removed from container and
    replaced with transportation Kanban and container
    moved to assembly
  • Production Kanban and empty container moved to
    subassembly

KANBAN FlowDetail
17
T
P
Transportation Card
Production Card
1
ASSEMBLY
ASSEMBLY AREA BUFFER
T
T
2
T
T
3
SUBASSEMBLY PRODUCTION
P
4
P
P
SUBASSEMBLY AREA BUFFER
18
  • Full container is moved to assembly
  • Transportation Kanban removed from container and
    sent with empty container to subassembly
  • Production Kanban removed from container and
    replaced with transportation Kanban and container
    moved to assembly
  • Production Kanban and empty container moved to
    subassembly
  • Production Kanban and full container moved to
    subassembly storage

KANBAN FlowDetail
19
T
P
Transportation Card
Production Card
1
ASSEMBLY
ASSEMBLY AREA BUFFER
T
T
2
T
T
3
SUBASSEMBLY PRODUCTION
P
4
5
P
P
SUBASSEMBLY AREA BUFFER
P
20
Item. Connect to Warehouse (MMS002/G)
  • Set Issue method for com- ponents to lt5 or 6gt
    (backflush putaway/operation).

Product. Connect Materials/Operations (PDS002/U1)
  • Create Product Structures. Enter issue from
    warehouse and location

Setup Steps- Detail Flow
Item. Connect To facility (MMS003/E)
  • ltEnablegt Orderless production field.
  • Determine type (production/ transportation) and
    number of Kanbans. Set Replenishment method to
    lt1Kanbansgt. Set Kanban print to lt3both prod
    and trans Kanbans.

Item Location. Open (MMS065)
21
  • Transportation Kanban Calculation

Formula
y number of Kanban cards D
daily demand L replenishment lead
time a safety factor a order quantity
(container quantity)
D x L (1 a )
y
a
Setup Steps- Transport Kanban/ Order Quantity
Generation
  • Order Quantity Calculation

Formula
Annual demand
Order qty
x No days Oq
365
22
Item Location. Open (MMS065)
23
Kanban Card. Print (MMS695)
  • Generate number of transport Kanbans and
    production Kanban.

Manufact Order. Report Orderless (PMS260)
  • Report work center production and backflush
    inventory.

Processing Steps- Detail Flow
24
Kanban Cards
25
  • Use of Movex Business Engine
  • Use of Reorder Points (production Kanban)
    entered manually or automatic
  • Use of Requisition Orders (transport Kanbans) for
    location replenishment
  • Order Point corresponds to the number of Kanbans
    and can be automatically calculated

Electronic Kanban - Overview
26
  • A demand generates a stock issue

ElectronicKanban FlowDetail
27
1
EKANBAN
DEMAND
ISSUE
FG01
28
  • A demand generates a stock issue
  • ROP (MMS002) tripped, triggering an assembly and
    issue of subassembly

ElectronicKanban FlowDetail
29
2
RoP in MMS002
RoP in MMS065
1
Trigger Assembly
EKANBAN
EKANBAN1
DEMAND
ISSUE
ASSEMBLY
FG01
30
  • A demand generates a stock issue
  • ROP (MMS002) tripped, triggering an assembly and
    issue of subassembly
  • ROP (MMS065) tripped, replenishment order
    (MMS170) created for move from LOC01 to SUB01

ElectronicKanban FlowDetail
31
2
3
RoP in MMS002
RoP in MMS065
1
Trigger Assembly
Trigger Transport
EKANBAN
EKANBAN1
DEMAND
ISSUE
ASSEMBLY
FG01
SUB01
EKANBAN1
LOC01
32
  • A demand generates a stock issue
  • ROP (MMS002) tripped, triggering an assembly and
    issue of subassembly
  • ROP (MMS065) tripped, replenishment order
    (MMS170) created for move from LOC01 to SUB01
  • ROP (MMS002) tripped, triggering an assembly and
    issue of components

ElectronicKanban FlowDetail
33
2
3
RoP in MMS002
RoP in MMS065
1
Trigger Assembly
Trigger Transport
EKANBAN
EKANBAN1
DEMAND
ISSUE
ASSEMBLY
FG01
SUB01
EKANBAN1
PRODUCTION
LOC01
RoP in MMS002
Trigger Production
4
34
  • A demand generates a stock issue
  • ROP (MMS002) tripped, triggering an assembly and
    issue of subassembly
  • ROP (MMS065) tripped, replenishment order
    (MMS170) created for move from LOC01 to SUB01
  • ROP (MMS002) tripped, triggering an assembly and
    issue of components
  • ROP (MMS002) tripped, triggering a replenishment
    PO

ElectronicKanban FlowDetail
35
2
3
RoP in MMS002
RoP in MMS065
1
Trigger Assembly
Trigger Transport
EKANBAN
EKANBAN1
DEMAND
ISSUE
ASSEMBLY
FG01
SUB01
EKANBAN1
EKANBAN2
PO
PRODUCTION
LOC01
REC01
RoP in MMS002
RoP in MMS002
Trigger Purchasing
Trigger Production
4
5
36
  • Enter the production location were the materials
    should be issued if issue method set to lt5gt or
    lt6gt (MMS002/G).

Work Center. Open (PDS010/F)
Item. Connect to Warehouse (MMS002/G)
  • Set Issue method for com- ponents to lt5 or 6gt.
    Set Storage method to lt3gt and enter feeding
    location as the Location.

Setup Steps- Detail Flow
Item. Connect To facility (MMS003/E)
  • ltEnablegt Orderless production field for
    assemblies.

Product. Connect Materials/Operations (PDS002/U1)
  • Create Product Structures. Enter issue from
    warehouse and location.

37
  • Set relation between the feeding and production
    locations. Set Replenishment method to lt2gt.
    Enter the replenishment location as the Goods
    sender. Calculate Reorder point and Order
    quantity.

Item Location. Open (MMS065)
  • Field lt01gt define default auto-replenishment
    order type.
  • Field lt05gt auto-generation of replenishment
    orders

Setting Location Replenishment (CRS783)
Setup Steps- Detail Flow
38
  • Order Point Calculation

Formula
Annual demand
x No days RoP
ROP
365
Setup Steps- Kanban Order Point/ Order Quantity
Generation
  • Order Quantity Calculation

Formula
Annual demand
x No days Oq
Order qty
365
39
  • Order Point Calculation

Formula
ROP Safety stock (Daily usage Lead
time)
Setup Steps- Standard ROP
40
  • Generate MRP for ROP items.

MRP Generation
Manufact Order. Report Orderless (PMS260)
  • Report work center production and backflush
    inventory for finished goods.

Processing Steps- Detail Flow
Req/Dist Order. Open (MMS100/B0)
  • Review Requisition Distribution Order.
  • Select ltOpt 43gt to move to (MWS410)

Delivery. Open Toolbox (MWS410/B)
  • Highlight replenishment order and select ltOpt
    19Pick reportgt

41
  • Generate MRP for ROP items.

MRP Generation
Manufact Order. Report Orderless (PMS260)
  • Report work center production and backflush
    inventory for Subassemblies

Processing Steps- Detail Flow
42
Ten Technical Elements Of Lean
5Ss
Cellular Prod.
Mistake Proofing
Lean
Pull System
Takt Time
Setup Reduction TPM
Visual Control
Level Prod.
Standard Work
Continuous Flow
43
Ten Cultural Managerial Elements
Employee Involve- ment
Quality _at_ Source
Continuous Learning
Team Responsi- bility
Lean
Continuous Improve- ment
Open Communi- cations
Flexible Workforce
Employ- ment Stability
Procedural Discipline
System Process Thinking
44
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com