Description:

RT TSR section (16 resonators, 16 SC solenoid) 10 m 10 Mev ... IGBT Switch & Bouncer. CAP. BANK. 10 kV. 110 kV. Charging. Supply. 300kW ... – PowerPoint PPT presentation

Number of Views:43
Avg rating:3.0/5.0
Slides: 7
Provided by: Keph
Category:
Tags: beam | bouncer | end | front | layout | line

less

Transcript and Presenter's Notes

Title: Front End Beam Line Layout


1
Front End - Beam Line Layout
  • Ion source H-, LEBT 50 keV
  • Radio Frequency Quadrupole 4-5 m, 2.5 MeV
  • MEBT (2 bunchers, 3 SC sol., chopper) 4 m
  • RT TSR section (16 resonators, 16 SC solenoid)
    10 m 10 Mev
  • SSR1 section (18 resonators, 18 SC solenoids)
    14 m 30 MeV
  • SSR2 section (22 resonators, 12 SC solenoids)
    20 m 90 MeV

Frequency 325 MHz Total length 55 m Limited by
Meson Building
SSR1 (b0.22)
SSR2 (b0.4)
RT -CHSR
MEBT
RFQ
IS
2.5
0.050
90
10
W (MeV)
30
2
Front End 325 MHz System Layout
MODULATOR FNAL/TTF Reconfigurable for 1,2 or 3
msec beam pulse
110 kV
10 kV
Single Klystron 325MHz 3 MW
10kV
RF Couplers
120 kW max
600kW
40 kW max
60 kW max
Fast Ferrite Isolated I/Q Modulators
Cables to Tunnel
Room Temperature Copper Cavities (162)
Radio Frequency Quadrupole
Cryomodule 1-2 SSR1 (18)
Cryomodule 3-4 SSR2 (22)
3
HINS Front End - Stages (1)
RFQ
  • End FY06/Beg FY07
  • Klystron/Modulator/Power Distribution
  • RFQ
  • Test Cryostat/Prototype SSR
  • Klystron Power Distribution

IS

2.5
0.050
W (MeV)
4
HINS Front End - Stages (2)
  • End FY08/Beg FY09
  • 2 SSR1 cryostats
  • Chopper PS
  • Linac Operation
  • End FY09/Beg FY10
  • 1 SSR2 cryostat
  • Linac Operation

5
To do in Oct 06-Mar 07
  • Operations of ISRFQ
  • Procurement of
  • RT Cavities (5 to 16)
  • Buncher Cavities (LBL)
  • 18 Solenoids He Vessels
  • MEBT Integration
  • RFQRT IQM Modulators
  • Design/Procurement/Prototyping of
  • SSR1 Nb (Procure)
  • SSR1 He Vessel (Proc. Test)
  • SSR1 PC (Test)
  • SSR1 Cryomodule (Design)
  • SSR1 Solenoids (Prototype)

6
To do in Oct 07-Mar 08
  • Operations of ISRFQ RT
  • Procurement of
  • 2 SSR1 Cryomodules
  • 18 SSR1 Cavities PC
  • 18 SSR1 Solenoids
  • Cold IQMs
  • Design/Prototype/Procure
  • SSR2 Nb (Procure)
  • SSR2 He Vessel (Proc. Test)
  • SSR2 PC (Test)
  • SSR2 Cryomodule (Design)
  • SSR2 Solenoids (Prototype)