Title: RWP MegaWandplatten
1 British Precast Association Leicester, 11th of
January 2006
Dipl.-Ing. Roland Weber MD / Owner
2Content
1.) About us
2.) Opportunities and limits of on site precasting
3.) Technology and craftsmenship The
business proposals of RWP
31.) About us Innovative on site precasting
- 2001 RWP established as a technology
- company on site precasting since 2003
- Our aim is
- Mass elements faster and more ecconomical.
- Our customers are
- General Contractors and Precast Factories
- Two methods for on site precasting developed
- Battery Moulds for beams and columns
- Improved Tilt Up method
4Two Improved methods for on site precasting
requires skill
Idiot proof
Improved Tilt Up method
RWP- Battery Formwork
Beams and Columns
Walls and Decks
52.) Opportunities and limits of on site
precasting
Our opinion Mass elements (lt 3 h / m³) on
site Individual or labour intensive elements in
factories
- Why is on site precasting unusual today?
- too much space is needed
- not enough simplicity site installation,
- production details need to much attention
- keeping schedules in winter time is not reliable
61.) Simplicity 2.) Space 3.) Winter Altana-Parma
/ Berlin- Oranienburg
two RWP Battery- Formworks
Steel fixer
stack of elements
650 m³ deck- beams in Dec. / Jan. 03/04
7Reliability in cold winters
production 3 x per week at -15C
similar solutions for all RWP methods
8RWP Fold Away formwork Parking Deck in Berlin
Heavy Beams produced in RWP fold away
formwork
Seite 8/11
9RWP- Fold Away Formwork Columns and Beams
EDEKA / 2005
10Improved Tilt UP Method Logistik Center / LIDL
Bridgend
Improvement Early production and stack piling
enables tighter time schedules
11Improved Tilt Up Method Sandwich Facades
12In a nutshell Where does on site precasting
makes sense?
- Mass elements, about lt 3 h/m³, no
individualism, no prestressing, no competition
with automated factories
- Minimum size of a site
- 500 -1000 m³ of precast beams or columns
- (RWP Battery Formwork / Fold Away Formwork)
- 2000 4000 m² of walls / slabs for the
Improved Tilt Up method
- Long production time rather than short spans
- Longer than 2 3 months, better 3 5 months
- Low Prices of concrete and rebar on site
- Prefered markets factories, warehouses, mayor
housing projects, big sites, oversize elements
133.) Business proposals of RWP in the British
market
Our assets you can use Technology and / or
availability of German Craftsmanship
- We prefere to work with a partner for commercial
and legal reasons on the basis of a simple
contract. - Partner Company / J.V. / Subcontracts
- Our range of services
- Production on site, starting 4 6 weeks after
the order - Production outside precast factories bridging
capacity shortages, starting 3 5 weeks after
the order - Shop Drawings
- Selling RWP Battery Formwork / Fold Away Formwork
14Summary
- For mass elements, on site precasting is a
reliable alternative. lt 3 h/m³ as a guideline.
- RWP- Methods of on site precasting
- - high output on a small space
- - simplicity
- - reliable time schedules in winter
- Capacity and availability of German craftsmen can
reduce production time.
www.rwp-berlin.com