Description:

2.) Opportunities and limits of on site precasting. 3. ... Altana-Parma / Berlin- Oranienburg. two RWP Battery- Formworks. stack of elements. Steel fixer ... – PowerPoint PPT presentation

Number of Views:78
Avg rating:3.0/5.0
Slides: 14
Provided by: Job12
Category:

less

Transcript and Presenter's Notes

Title: RWP MegaWandplatten


1


British Precast Association Leicester, 11th of
January 2006
Dipl.-Ing. Roland Weber MD / Owner
2
Content
1.) About us
2.) Opportunities and limits of on site precasting
3.) Technology and craftsmenship The
business proposals of RWP
3
1.) About us Innovative on site precasting
  • 2001 RWP established as a technology
  • company on site precasting since 2003
  • Our aim is
  • Mass elements faster and more ecconomical.
  • Our customers are
  • General Contractors and Precast Factories
  • Two methods for on site precasting developed
  • Battery Moulds for beams and columns
  • Improved Tilt Up method

4
Two Improved methods for on site precasting
requires skill
Idiot proof
Improved Tilt Up method
RWP- Battery Formwork
Beams and Columns
Walls and Decks
5
2.) Opportunities and limits of on site
precasting
Our opinion Mass elements (lt 3 h / m³) on
site Individual or labour intensive elements in
factories
  • Why is on site precasting unusual today?
  • too much space is needed
  • not enough simplicity site installation,
  • production details need to much attention
  • keeping schedules in winter time is not reliable

6
1.) Simplicity 2.) Space 3.) Winter Altana-Parma
/ Berlin- Oranienburg
two RWP Battery- Formworks
Steel fixer
stack of elements
650 m³ deck- beams in Dec. / Jan. 03/04
7
Reliability in cold winters
production 3 x per week at -15C
similar solutions for all RWP methods
8
RWP Fold Away formwork Parking Deck in Berlin
Heavy Beams produced in RWP fold away
formwork
Seite 8/11
9
RWP- Fold Away Formwork Columns and Beams
EDEKA / 2005
10
Improved Tilt UP Method Logistik Center / LIDL
Bridgend
Improvement Early production and stack piling
enables tighter time schedules
11
Improved Tilt Up Method Sandwich Facades
12
In a nutshell Where does on site precasting
makes sense?
  • Mass elements, about lt 3 h/m³, no
    individualism, no prestressing, no competition
    with automated factories
  • Minimum size of a site
  • 500 -1000 m³ of precast beams or columns
  • (RWP Battery Formwork / Fold Away Formwork)
  • 2000 4000 m² of walls / slabs for the
    Improved Tilt Up method
  • Long production time rather than short spans
  • Longer than 2 3 months, better 3 5 months
  • Low Prices of concrete and rebar on site
  • Prefered markets factories, warehouses, mayor
    housing projects, big sites, oversize elements

13
3.) Business proposals of RWP in the British
market
Our assets you can use Technology and / or
availability of German Craftsmanship
  • We prefere to work with a partner for commercial
    and legal reasons on the basis of a simple
    contract.
  • Partner Company / J.V. / Subcontracts
  • Our range of services
  • Production on site, starting 4 6 weeks after
    the order
  • Production outside precast factories bridging
    capacity shortages, starting 3 5 weeks after
    the order
  • Shop Drawings
  • Selling RWP Battery Formwork / Fold Away Formwork

14
Summary
  • For mass elements, on site precasting is a
    reliable alternative. lt 3 h/m³ as a guideline.
  • RWP- Methods of on site precasting
  • - high output on a small space
  • - simplicity
  • - reliable time schedules in winter
  • Capacity and availability of German craftsmen can
    reduce production time.