Integration Team - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

Integration Team

Description:

http://marianne.in2p3.fr/datagrid/ Testbed 1 link. When are the meetings ? ... http://marianne.in2p3.fr/datagrid/testbed1/tb1-sites/index.html. ... – PowerPoint PPT presentation

Number of Views:50
Avg rating:3.0/5.0
Slides: 13
Provided by: flavia9
Category:

less

Transcript and Presenter's Notes

Title: Integration Team


1
Who ?
Integration Team
  • What is Iteam ?
  • Team to combine Middleware
  • and Globus to provide a functional
  • Computing platform.
  • See D6.1 (Integration Document).
  • Where is information available ?
  • http//marianne.in2p3.fr/datagrid/
  • Testbed 1 link
  • When are the meetings ?
  • Wednesdays at 1600. See above.

2
Schedule
July 31 Collection of info from middleware
packages. Report on Globus on packaging
requirements. CVS server available. August
15 Package server available. CVS server
mirroring/hosting DataGrid code. August
31 Reference platform defined. Bug tracking
system in place. Receive Globus 2. September
1 Resources for intensive integration available
at CERN. September 15 Website has support names
and contacts. Time table for Testbed sites
available. Versioning rules established.
3
Schedule
September 30 Reference platform installed at
CERN. Middleware packages release
code. Authorization working group releases
code. Infrastructure in place for requesting
certificates. Detailed layout of testbed sites
available. October 1 Intensive integration
starts. October 15 First beta release of
DataGrid. October 31 Initial limited
application testing finished. DataGrid ready for
widespread deployment. November 1 Widespread
deployment Code machines split for
development Testbed 1 open to all
applications. December 31 WE ARE DONE!
4
Infrastructure
CVS Repository WP1 JSS, RB, II, LB, and
UI WP2 GDMP WP3 GMA WP4 Base installation
code Package Repository Source and binary
RPMs Access via HTTP Support Tools Docs Contac
t lists Bug/Incident Tracking system
5
CERN Infrastructure
8 PCs running RH Linux 6.1.1 with 20GB disk space
per machine 2 Solaris boxes. Disk server
? Office space room for 26 people in buildings
600 and 513. 10 PCs (desktop) and DHCP or
statically assigned IP addresses.
Available September 1st.
6
WP software
WP1 JSS, II, LB, UI, and RB WP2 GDMP, Replica
Catalogue API, Castor GSI Interface, SQL
DB WP3 MDS Schema, OpenLDAP backends,
GMA. WP4 Configuration management, Base
installation system, Package
Installation system, Information providers
for PBS, LSF, and later Condor. WP5 GridFTP
and RFIO needed.
7
Site Schedule
Core machines (Oct. 1 14) One cluster running
PBS One cluster running LSF Lyon CERN (Oct.
15 21) Lyon runs BQS Partner expansion (Oct.
22 31) Further expansion (Nov. 1 30)
8
Feedback from WP6
Feedback to workpackages via bug-tracking
system at the end a formal written summary D6.4
9
Validation Team
Composition 1-2 people per applications
area Some people from IT Names available mid
September Responsabilities Arranging and
coordinating application level tests Identifying
problems with DataGrid code. Arranging when
updates are deployed.
10
Globus 2
From Globus Made the release we pushed
for. Not really tested. PM9-URGENT mail and
phone support. From EDG We have the RPMs ready
for the released alpha 3 Need to incorporate the
configuration. Testing needed.
11
Applications
  • The application kits are installed by the
    application people.
  • AFS NOT supported.
  • WP9 provides man power for porting software to
    SGI and
  • SUN.

12
Todo list
http//marianne.in2p3.fr/datagrid/testbed1/tb1-sit
es/index.html. Check for W. Hoscheck deliverable
and ask for Javier.
Write a Comment
User Comments (0)
About PowerShow.com