Title: M Crespi , JM Jaillet


1
Maritza East 1 Desulphurization plants for a
better environment
M Crespi , JM Jaillet G Catalano
10th CEI Summit Economic Forum Sofia 21/22 Nov.
07
2
Agenda
3
3D model of the power plant
4
Context of the project
Maritza
5
Context of the project
Specific project conditions/objectives
  • Meet the future electricity demand in the country
  • Possibly substitute old, unsafe, inefficient and
    environmentally hostile power plants, both
    lignite, hard coal
  • Meet lignite extraction targets for the Maritza
    East mines
  • Due to general low-grade quality of Bulgarias
    lignite gt Air Pollution Control equipment are
    necessary
  • Improve environmental conditions in the area

Maritza East 1 project has several objectives
6
Agenda
7
Technical description
Project characteristics
  • Full turnkey project
  • 670 MWe gross, 600 MWe net USC boilers with high
    efficiency2 units of 335 MWe each to be realized
    adjacent to the existing Maritza East 1 power
    plant
  • Lignite-fired plant with the state of the art APC
    equipment
  • End user AES-3C
  • Base load facility, effective annual capacity
    factor of 95

gt Can be achieved only with careful selection of
key components
8
Layout of the installation
9
Agenda
10
Impact on the region
Many positive impacts on different aspects
  • Regional development
  • Employment
  • Continuation of lignite mine and limestone quarry
    operations
  • Tax revenues
  • Related industries
  • Technology transfer
  • Overall stimulation at the local and national
    levels

11
Agenda
12
Environmental compliance
Environmental friendly project
  • Noise emissions - attention given for both the
    installation and the surroundings - majority of
    noisy components installed within a building -
    ID fans fitted with discharge silencers -
    distance from external receptors maximized
  • Local water quality improvement - zero
    discharge of process water - lakes rivers
    protected - reduce thermal and chemical impact
    to surface water quality - WFGD make-up water
    partly constituted by the blow-down from the main
    cooling tower to reduce water consumption

13
Environmental compliance
Improved air quality by removing the SO2
  • Reduced ecological impact resulting from acid
    rains (especially for forest and lakes)
  • Long term improvement and human health benefits
    by applying the Bulgarian, European and World
    Bank ambient air quality criteria
  • The actual regulation in Bulgaria on SO2, Nox,
    CO, Pb, PM10 and PM2.5more or less mirrors the
    EU regulation (PM2.5 is not yet regulated by EU)
  • The World Bank qualifies as poor the air quality
    in the region at the moment regarding the SO2

14
Environmental compliance
WFGD design details
  • Designed for SO2 inlet concentration of 21890
    mg/Nm3 (dry 6 O2), equivalent to 2.7 sulphur
    content of the lignite. Would not exceed 400
    mg/Nm3 as SO2 outlet concentration (more than 98
    of the SO2 is removed)
  • Absorber designed for 22500 ppm Chlorides content
    (material selection for 35000 ppm)
  • Blow-down flow rate minimized and fixed at 10
    m3/hr
  • 7 spray levels at design conditions, only 6 in
    operation at guaranteed conditions
  • Absorber equipped with Performance Enhancement
    Plates (Alstom patent to reduce the
  • gas by-pass along the walls and thus power)
  • Gypsum by-product to be landfilled as inert
    material

15
Environmental compliance
Tail of equipments for one unit
16
Environmental compliance
Summary
17
Environmental compliance
Summary
18
Environmental compliance
Summary
19
Agenda
20
Conclusions
  • Eastern Europe countries are more and more
    focused on sustainable development
  • A power station can play an important role if
    properly designed.
  • Alstom Maritza East 1 Power Plant has one of the
    highest efficiency thus using less lignite per KW
    produced as well as most advanced APC equipment
    to reduce emissions below LCPD Directive
  • The project will help Bulgarias development and
    pave the way to further power projects and
    investment in the country

As a global specialist in plants integration and
environmental control systems, Alstom has paid
careful attention to any aspects of the Maritza
East 1 project, thus preserving air, water and
soil
21
www.alstom.com