KEMA Quality - PowerPoint PPT Presentation

1 / 18
About This Presentation
Title:

KEMA Quality

Description:

Disposal of substances / scrap reuse. Preliminary phase. Current situation: ... Scrap not optimised. Uncontrolled distribution. of waste materials. Polluted ... – PowerPoint PPT presentation

Number of Views:51
Avg rating:3.0/5.0
Slides: 19
Provided by: baskr
Category:
Tags: kema | quality | scrap

less

Transcript and Presenter's Notes

Title: KEMA Quality


1
KEMA Quality
  • Introduction

2
KEMA
  • A worldwide group of 1600 professionals
  • Core business
  • Performance improvement, Risk reduction, and
    Quality Management for our Customer business
    ambitions
  • Quality control by means ofTesting, Assessing,
    Inspections, Auditing and Certification
  • 80 year track record in the Energy chain

3
Global Presence
4
KEMA as a whole .covers the entire energy value
chain
KEMA Quality makes solutions and innovation
tangible
5
Quality Management Systems
  • Industry sector
  • Electrical and optical equipment manufacturing
  • Basic metal and fabricated metal products
    manufacturing
  • Machinery and equipment manufacturing
  • Chemical and rubber manufacturing
  • Facility management
  • Interior cleaning services, Catering services
  • Landscaping services, Security services
  • Health Care sector (Quality and Health Safety
    management)
  • Installation sector (Quality management)
  • Special services
  • Vendor Assessments - Supplier Audits
  • Energy label (BRL9500)
  • Web based auditing management
  • Special environmental innovations

Quality Management , environmental, health
safety and Information security Management
6
Management System Certification for Waste
Management
  • HVC has 2 waste disposal incineration plants in
    the Netherlands.
  • Absorbing every year more than 800.000 ton waste
  • Benefits
  • Recycling all residue
  • Production a electric energy of 90 MW
  • Our contribution
  • KEMA offers certification in accordance with
  • ISO 9001, ISO 14001 and OHSAS 18001.

7
GreenDock case
A tool for Sustainable Ship Dismantling
8
The GreenDock view
  • Within the GreenDock concept the business risks
    focuson environmental damage caused by the
    dismantlingprocesses and health and safety risks
    for the workers inthese processes
  • Because both aspects are of vital importance to
    theGreenDock concept and the franchise formula,
    KEMA provides for a Certification methodology to
    minimize these risks, such under control of a
    Quality Management System
  • For instance based on
  • Technical guidelines for the environmentally
    sound management (ESM) of the full and partial
    dismantling of hazardous ships

9
Why GreenDock choose KEMA?
  • We offer solutions to manage business risks for
    health, safety and environmental challenges
  • Technical expertise, experience and independence
  • Innovative and flexibility
  • One service desk to their Global market

10
Independence
  • KEMA carries out objective, independent
    assessments, inspections for GreenDock Partners
    and sites all over the world
  • Mandatory independent Certification, resulting in
    a
  • GreenDock Certificate for Safe, healthy,
    environmentally conscious Dismantling of Vessels
  • The independent assessments focus on three
    important aspects of dismantling
  • Inspections of ships before they are dismantled
    (surveys w.r.t. hazardous substances etc)
  • Assessments of all processes and procedures,
    including the actual performance in dismantling
    of the ship
  • Compliance inspections w.r.t. local regulations
    and international guidelines

11
Essentials
  • KEMA worked out 4 phases
  • Preliminary phase w.r.t. the starting point of
    dismantling
  • Decommissioning of Vessels
  • Dismantling procedures and KPIs
  • Disposal of substances / scrap reuse

12
Preliminary phase
  • Current situation
  • No investigative practices
  • Unexpected .
  • No knowledge of dismantling and risks

13
Decommissioning
  • Current situation
  • Business driven
  • Hazardous working environment and pollution
  • No decommissioning

14
Dismantling
  • Current situation
  • Uncontrolled practices
  • Low Yield production
  • Pollutes the environment
  • Poor, unsafe and unhealthy conditions for
    people

15
Disposal
  • Current situation
  • Scrap not optimised
  • Uncontrolled distribution
  • of waste materials
  • Polluted area

16
  • High quality of dismantling requires a
  • highly skilled level of certification.

17
GreenDock The Solution
  • The concept in view
  • Start video

18
Questions please
  • Thank you for your attention
Write a Comment
User Comments (0)
About PowerShow.com