Title: PowerPointPrsentation
1Efficiency Comparisons
Innovative Attachment Systems For Timber
Construction System WT
sdo, Juni 02
2Connection of Main and Secondary Purlins
Alternative 1 Bar Shoe 3 1/4 / 4 3/4 24
Grooved Nails 1/8 x 1 1/2
System WT 1 Pair WT-T-5/16x9 21/32
- 1,673 lbf.
- 1.5 Min. Installation Time
- 20 Total Cost Advantage
- Invisible
- Fire Resistant Connection
- 1,596 lbf.
- 5 Min. Installation Time
3Coupling Purlins
System WT 2 Pair WT-T-5/16x8 11/16
Alternative 2 Bulldog d 2 3/8 2 Plug Gages
M1/22 Washers
- 1,484 lbf. zul. Coupling Strength Per Side
- 3 Min. Installation Time
- 25 Total Cost Savings
- No re-tightening
- Secure Connection
- 1,574 lbf. zul. Coupling Strength Per Side
- 12 Min. Installation Time
- Must be re-tightened
4Purlin / Rafter Connection
System WT 1 WT-T-5/16x8 11/16
Alternative 2 Rafter/Purlin Strap Type 210
1/16x1 Comb Nail 4x40
- 1,050 lbf.
- 0.33 Min. Installation Time
- 30 Total Cost Advantage
- Invisible
- Simple Installation
- Fire Resistant Connection
- 1,079 lbf.
- 2.5 Min. Installation Time
- Complex Assembly
5Notched Fly Rafter Anchoring Bsp. Span 8/16
System WT 1 WT-T-1/4x6 5/16
Alternative Rafter Bolt 1/4x10 1/4
- 474 lbf. On Course
- 162 lbf. On Notch
- 0.3 Min. Installation Time
- 20 Total Cost Advantage
- No Pre-drilling
- No Splitting
- 346 lbf. On Course
- 252 lbf. On Notch
- 1.5 Min. Installation Time
- High Energy Expenditure (Torque)
- Pre-drilling Required
6Reinforcement of Notched Purlins
Alternative Glued Thread Rod M 7/16, 11 13/16
System WT 2 WT-5/16x11 13/16
- 2,985 lbf.
- 1 Min. Installation Time
- 25 Total Cost Advantage
- No Pre-drilling
- Invisible
- Fire Resistant Connection
- Calculation Program
- 2,630 lbf.
- 3-5 Min. Installation Time
- Gluing may be Necessary
7Dowelled Purlin (1) BspField inst., 274 lbf /
ft Uniformly Dist.,19 8.25 Span, QS 2 x 14/20
System WT 36 WT-T-5/16x11 13/16
Alternative 12 Insertion Peg Type C d4 9/16
Pin M 3/4 Washer
- 1,056 lbf. Thrust Attachment
- 15 Min. Installation Time
- 15 Total Cost Advantage
- Calculation Program
- Invisible, Fire Resistant Connection
- No Re-tightening
- 3,821 lbf. Thrust Attachment
- 50 Min. Installation TIme
8Dowelled Purlin (2) Bsp Field inst., 274 lbf /
ft Uniformly Dist., 6 m Span, QS 2 x 14/20
System WT 36 WT-T-5/16x11 13/16
Alternative 20 Bar Dowel d 3/4
- 1,057 lbf Thrust Connection
- 15 Min. Installation Time
- 10 Total Cost Advantage
- Calculation Program
- Connections on Site
- No Pre-drilling
- 100 Accuracy
- 2,068 lbf. Thrust Connection
- 30 Min. Installation Time
9Cross Stacking Bsp Thrust Attachment, down
lying connection a/HH lt 0.7
System WT 2 WT-Tx5/16x11 13/16
Alternative 2 Glued in Thread Bar M 7/16, 11
13/16
- 2,985 lbf.
- 0.66 Min. Installation Time
- 20 Total Cost Advantage
- Invisible
- No Pre-drilling, No Gluing
- Fire Resistant Connection
- 5,260 lbf.
- 5-8 Min. Installation Time
- No Smaller Diameters Permissible
- Gluing Necessary
- Down Time Between Treatments
10Course Connection with External Laps
Alternative 32 Nails 3/8 x 7 Pre-drilled
System WT 16 WT-T-5/16x7 1/2
- 5,013 lbf. Course and Thrust Force
- 6-8 Min. Installation Time
- Almost Invisible
- Rigid Connection
- No Pre-drilling
- Fire Resistant Connection
- 5,058 lbf.
- 8-10 Min. Installation Time