Title: PowerPointPrsentation


1
Efficiency Comparisons
Innovative Attachment Systems For Timber
Construction System WT
sdo, Juni 02
2
Connection of Main and Secondary Purlins
Alternative 1 Bar Shoe 3 1/4 / 4 3/4 24
Grooved Nails 1/8 x 1 1/2
System WT 1 Pair WT-T-5/16x9 21/32
  • 1,673 lbf.
  • 1.5 Min. Installation Time
  • 20 Total Cost Advantage
  • Invisible
  • Fire Resistant Connection
  • 1,596 lbf.
  • 5 Min. Installation Time

3
Coupling Purlins
System WT 2 Pair WT-T-5/16x8 11/16
Alternative 2 Bulldog d 2 3/8 2 Plug Gages
M1/22 Washers
  • 1,484 lbf. zul. Coupling Strength Per Side
  • 3 Min. Installation Time
  • 25 Total Cost Savings
  • No re-tightening
  • Secure Connection
  • 1,574 lbf. zul. Coupling Strength Per Side
  • 12 Min. Installation Time
  • Must be re-tightened

4
Purlin / Rafter Connection
System WT 1 WT-T-5/16x8 11/16
Alternative 2 Rafter/Purlin Strap Type 210
1/16x1 Comb Nail 4x40
  • 1,050 lbf.
  • 0.33 Min. Installation Time
  • 30 Total Cost Advantage
  • Invisible
  • Simple Installation
  • Fire Resistant Connection
  • 1,079 lbf.
  • 2.5 Min. Installation Time
  • Complex Assembly

5
Notched Fly Rafter Anchoring Bsp. Span 8/16
System WT 1 WT-T-1/4x6 5/16
Alternative Rafter Bolt 1/4x10 1/4
  • 474 lbf. On Course
  • 162 lbf. On Notch
  • 0.3 Min. Installation Time
  • 20 Total Cost Advantage
  • No Pre-drilling
  • No Splitting
  • 346 lbf. On Course
  • 252 lbf. On Notch
  • 1.5 Min. Installation Time
  • High Energy Expenditure (Torque)
  • Pre-drilling Required

6
Reinforcement of Notched Purlins
Alternative Glued Thread Rod M 7/16, 11 13/16
System WT 2 WT-5/16x11 13/16
  • 2,985 lbf.
  • 1 Min. Installation Time
  • 25 Total Cost Advantage
  • No Pre-drilling
  • Invisible
  • Fire Resistant Connection
  • Calculation Program
  • 2,630 lbf.
  • 3-5 Min. Installation Time
  • Gluing may be Necessary

7
Dowelled Purlin (1) BspField inst., 274 lbf /
ft Uniformly Dist.,19 8.25 Span, QS 2 x 14/20
System WT 36 WT-T-5/16x11 13/16
Alternative 12 Insertion Peg Type C d4 9/16
Pin M 3/4 Washer
  • 1,056 lbf. Thrust Attachment
  • 15 Min. Installation Time
  • 15 Total Cost Advantage
  • Calculation Program
  • Invisible, Fire Resistant Connection
  • No Re-tightening
  • 3,821 lbf. Thrust Attachment
  • 50 Min. Installation TIme

8
Dowelled Purlin (2) Bsp Field inst., 274 lbf /
ft Uniformly Dist., 6 m Span, QS 2 x 14/20
System WT 36 WT-T-5/16x11 13/16
Alternative 20 Bar Dowel d 3/4
  • 1,057 lbf Thrust Connection
  • 15 Min. Installation Time
  • 10 Total Cost Advantage
  • Calculation Program
  • Connections on Site
  • No Pre-drilling
  • 100 Accuracy
  • 2,068 lbf. Thrust Connection
  • 30 Min. Installation Time

9
Cross Stacking Bsp Thrust Attachment, down
lying connection a/HH lt 0.7
System WT 2 WT-Tx5/16x11 13/16
Alternative 2 Glued in Thread Bar M 7/16, 11
13/16
  • 2,985 lbf.
  • 0.66 Min. Installation Time
  • 20 Total Cost Advantage
  • Invisible
  • No Pre-drilling, No Gluing
  • Fire Resistant Connection
  • 5,260 lbf.
  • 5-8 Min. Installation Time
  • No Smaller Diameters Permissible
  • Gluing Necessary
  • Down Time Between Treatments

10
Course Connection with External Laps
Alternative 32 Nails 3/8 x 7 Pre-drilled
System WT 16 WT-T-5/16x7 1/2
  • 5,013 lbf. Course and Thrust Force
  • 6-8 Min. Installation Time
  • Almost Invisible
  • Rigid Connection
  • No Pre-drilling
  • Fire Resistant Connection
  • 5,058 lbf.
  • 8-10 Min. Installation Time