Title: LAr ROD Status


1
LAr ROD Status
  • Arno Straessner
  • and Alain, Daniel, Annie, Manuel, Imma, Laurent,
  • Eric, Jean-Pierre, Gilbert, ...
  • ATLAS Geneva
  • DPNC
  • March 4th, 2005

2
First Three Production Boards Arrived!
  • Pre-series of 20 boards all assembled in Italy
    (Seisystem)
  • 3 boards equipped with optical receivers and
    received in Geneva
  • Further steps done at Uni mounting of
    temperature sensors, cooling plates
  • To be done still plugging of mezzanine boards
    (PUs), mounting of protection foil
  • This needs to be done also for the remaining 242
    boards!
  • 1 board now in Annecy, 2 in Geneva

3
Quality Tests At Manufacturer
  • JTAG/boundary scan test lines and components on
    PCB (60)
  • ? OK after repair of some short-circuits between
    near-by resistances
  • Reason for short-circuits
  • soldering mask with too small holes and manual
    preparation of soldering paste
  • New mask will be prepared for remaining
    production
  • JTAG test was run on our own system (PCcable)
  • Seisystem is installing the same test on their
    own PC
  • nearly finished
  • Will already be used for the remaining 17 boards
    of the pre-series
  • Important tool for manufacturer!

4
Quality Control in Geneva
  • ROD boards were tested on test-bench

5
Graphic Interface
  • Enter board ID with code bar reader
  • Configure verify database entry of ROD board
    PUs
  • Start tests ? all automatic
  • List of test results (fail/pass) plus first error
    analysis ? database

6
What is tested
  • VME access to registers
  • Compare hard-wired ROD ID with ATLAS label
  • Glink temperature
  • Data path on the board staging FPGA ? PU ?
    output controller
  • Data injection through optical receivers, readout
    from OC
  • Complete data path from injector to readout PC
  • Different modes normal (4 PUs) and staging (2
    PUs)
  • Results
  • 2 boards OK
  • 1 board with bad ORX already repaired, now OK

7
Summary
  • In general satisfied with pre pre-series
  • Give green light for full production to gain some
    time
  • Other projects
  • Crates
  • 13 new crates ordered (18 in total)
  • Another month delay delivery date is June 2005
  • 2 old crates need to be modified for ATLAS
    until May
  • ? LAr half-barrel partition
  • Cooling station for RODs in USA15
  • Mechanics nearly finished
  • Electronic part will be completed until end of
    April
  • Cooling distribution drawers
  • 1 per crate
  • Material needs to be ordered