1How to Build an Arial Home
2Be Prepared Things Usually Go Wrong, Be
Creative and Make the Necessary
AdjustmentsThese are not bumps in the road,
this IS the road.
3(No Transcript)
4This is what you will see when you arrive at the
build site outside of Ensenada, Mexico. There
will be a painted concrete pad with steel U
channels anchored to it to support the wall
panels, a trailer full of building components,
and a lot of sand.
5A concrete pad painted bright blue at the
familys request
6Step 1 Clean off the concrete pad with brooms
and mops
7Arial Home U Channels Anchor Wall to Concrete Base
EternaBond Roof Seal 3 Wide
Wall Panel, Fiberglass on Inside, Steel on Outside
The U Channel is 2.25 high
Painted Surface
Insulating Tape
Concrete Pad
Silicone Caulk
Insulating tape is put under the U channel as an
air and water seal.
8211
810
810
211
Step 2 Pieces of outdoor carpet are put down
first to protect the floor surface
9Note the table on the pad holding the tools,
caulk guns, screws, etc. All tools and supplies
in active use go on the table, not the floor, not
the ground. Inactive items go back into their
bins.
10The Next Slide Shows the Floor Plan for the 380
Square Foot Steel Home You Will Be Building
11Back Wall Front Walls are 76 High
06
05
04
03
02
01
07
22
810
08
21
Curtain Wall
Middle Wall is 80 High
20
09
27
25
26
23
24
19
10
Red Arrows Indicate Tongue Direction
810
18
11
14
183 outside, 1711 inside
17
15
16
13
12
216 outside, 212 inside dimension
Arial Home Version 5.1 Floor Plan
12Back Wall Front Walls are 76 High
06
05
04
03
02
01
07
22
810
08
21
Curtain Wall
Middle Wall is 80 High
20
09
27
25
26
23
24
19
10
Red Arrows Indicate Tongue Direction
810
18
11
14
183 outside, 1711 inside
17
15
16
13
12
216 outside, 212 inside dimension
Arial Home Version 5.2 Floor Plan as of March 20,
2009
13The wall panels are checked for how they fit in
the factory
14Entrance
Table 1
Canopy Set Up Here
Table 2
Table 3
Only one chair here.
Table 4
Table 5
This side faces construction area
Quartermaster area. Use 5 folding tables and 1
canopy and 5 chairs for this area. A sixth
folding table should be set up on the concrete
pad to hold tools, screws, etc.
15View from inside the Quartermaster area with bin
labels facing out
16(No Transcript)
17All wall panels are carried from the trailer to
the saw horses for caulking
18Wall Panel Installation Procedure
- Carry the wall panel from the trailer to the saw
horses, making sure the outside groove is on the
bottom, Panel Label is facing up - Caulk the groove with latex caulk
- Carry the wall panel to the proper position
- Level in both directions
- Use wood shims to hold the level position
- One person screws from outside, one from inside
while panel is being held - Repeat 27 times
19Be sure to use levels to ensure the wall panels
are vertical
20Use the levels to make sure the walls do not lean
in or out
21Using Four Magnetic Levels to Check Wall Panel
Alignment
22The Following Slides Show the Step-by-Step
Progression for Wall Panel Assembly
236
5
4
01
7
22
8
13
9
86
27
25
26
24
10
14
18
Red arrows indicate tongue direction
11
15
86
16
12
172 inside 177 Outside Concrete 177
19
21
20
22
23
28
201 inside dimension, 206 outside dimension
Arial Home Dimensions and Floor Plan
24Top Corner T Goes on Next
- This helps square the corner. Do not screw these
top corner Ts in until all the walls are up and
all the T pieces are in place.
25Corner Ts Help Square Corners
- Place channel T01 on top to help square the
corner. Do NOT screw the Ts to the walls until
all the walls are up and all the roof panels are
in place to press them down.
26(No Transcript)
276
5
4
02
01
7
22
8
21
9
86
27
25
26
24
10
14
18
Red arrows indicate tongue direction
11
15
86
16
12
172 inside 177 Outside Concrete 177
19
21
20
22
23
28
201 inside dimension, 206 outside dimension
Arial Home Dimensions and Floor Plan
286
5
03
02
01
7
22
8
21
9
86
27
25
26
24
10
20
18
Red arrows indicate tongue direction
11
15
86
16
12
172 inside 177 Outside Concrete 177
19
21
20
22
23
28
201 inside dimension, 206 outside dimension
Arial Home Dimensions and Floor Plan
296
04
03
02
01
7
22
8
21
9
86
27
25
26
24
10
20
18
Red arrows indicate tongue direction
11
19
86
18
12
172 inside 177 Outside Concrete 177
19
21
20
22
23
28
201 inside dimension, 206 outside dimension
Arial Home Dimensions and Floor Plan
306
04
03
02
01
7
22
8
17
21
9
86
27
25
26
24
10
20
18
Red arrows indicate tongue direction
11
19
86
18
12
172 inside 177 Outside Concrete 177
19
21
20
22
23
28
201 inside dimension, 206 outside dimension
Arial Home Dimensions and Floor Plan
31(No Transcript)
3205
04
03
02
01
06
22
07
21
9
86
27
25
26
24
10
20
Red arrows indicate tongue direction
11
19
86
18
12
172 inside 177 Outside Concrete 177
17
21
20
22
23
28
33A Perfectly Aligned Corner Avoid the temptation
to put on the Outside Ls until the house is
finished
3405
04
03
02
01
06
22
07
21
08
09
20
23
Red arrows indicate tongue direction
11
19
86
18
12
172 inside 177 Outside Concrete 177
17
21
16
22
23
28
35(No Transcript)
3605
04
03
02
01
06
22
07
21
08
23
24
27
25
26
09
20
Red arrows indicate tongue direction
19
10
18
12
172 inside 177 Outside Concrete 177
22
23
28
17
16
15
37Back Wall Front Walls are 76 High
06
05
04
03
02
01
07
22
810
08
21
Curtain Wall
Middle Wall is 80 High, Fiberglass side faces
the bedroom
20
09
27
25
26
23
24
19
10
Red Arrows Indicate Tongue Direction
810
18
11
14
183 outside, 1711 inside
17
15
16
13
12
216 outside, 212 inside dimension
Arial Home Version 5.0 Floor Plan, Door with Two
Grooves
38(No Transcript)
39T Channels 15 and 17 tops do not extend all the
way to the side walls to allow room for the side
wall T channels to fit without an overlap.
40Installing the Roof Panels and Sealing them With
EternaBond
41Orientation of the Roof Panels
42(No Transcript)
43Arial Home Ridge Cap Positioning
All tongues face to the right
8
12
11
10
9
14
13
Ten foot sections on either side
190
7
1
2
3
4
5
6
Three foot middle section
96
Half Panel
230
All tongues face to the right
Front of house
44Front and Rear Roof Trim (Ls) Installed
Ten foot sections on either side
8
12
11
10
9
14
13
Three foot middle section
190
7
1
2
3
4
5
6
230
All tongues face to the right
Front of house
45Roof Panel Installation Procedure
- Carry each roof panel from the trailer to the saw
horses, for staging - Carry the roof panel from the saw horses to the
proper position adjacent to the home - Lift into position with enough people on the
inside of the house on ladders - Measure overhang to make sure it is 10 on the
side - Repeat 13 times
46Set the wood planks on the concrete blocks so the
roof panel lift teams can reach up high enough to
hand the roof panels to the people on ladders
inside the house, as shown in this photo.
47Use multiple volunteers to hand the roof panels
to the inside teams.
48This is how the ladders should be placed inside
the house to receive the roof panels and move
them into the proper position.
49Screw all Ts to the roof panels first do NOT
screw Ts to wall panels until all are screwed to
the roof panels. Three people should stand on
each roof panel when Ts are screwed to the wall
panels to get the tightest fit.
50Sealing the Arial Home Roof with EternaBond
51Step 1 Fill the gap at the roof ridge with
Great Stuff insulating foam.
52Step 2 Put the 3 piece Ridge Cap in place with
a few screws. The ends abut rather than overlap.
Keep the screws more than 2 from the edges to
leave room for the EternaBond seal.
53Step 3 For all EternaBond applications, be sure
to snap a blue chalk line first so you have a
guide to keep it straight. It is permanent once
you put it down. Start with the long edges of
the Ridge Cap. Use the hand rollers provided for
maximum pressure to start the chemical reaction.
54Step 4 Leave the two short seams for the middle
piece until after the longer seams are complete
on both sides.
55EternaBond on the Ridge Cap seams.
56Front and Back L for Rain Water Run Off
One screw every 24, with washer, to hold Ls to
roof panels
EternaBond goes over this seam
3.25
Roof Panel
3.25
This Outside L is bent to 95 degrees to
compensate for the 4 degree slope of the roof
57Step 5 EternaBond the roof panel seams
overlapping the Ridge Cap by a few inches for
extra strength.
58Step 7 The finished roof with EternaBond seams
and roof trim.
59EternaBond on external T channel seam
60EternaBond on inside T channel seam
61Put EternaBond Tape on the Inside and Outside T
seams
62EternaBond Application Sequence for Roof Sealing
- 1 - Both long edges of Ridge Cap
- 2 - Seams of Ridge Cap
- 3 - Long edges of Front Roof Trim L
- 4 - Long edges of Rear Roof Trim L
- 5 - Seams of Roof Panels, overlapping the Ridge
Cap but abutting the edge of the Roof Trim
EternaBond
63Sequence of EternaBond Application
8
12
11
10
9
14
13
7
1
2
3
4
5
6
Front of house
64(No Transcript)
65A 123 watt Sharp solar PV panel powers the Arial
Home
66Side Orientation of Solar PV Panel when South is
not the Front or Back
67The Arial Home Plumbing System
68Prefabricated pipe connections for plumbing system
69To Sink
12 vdc Pump
To Toilet
To Shower
Water Filter
To Solar Heat Collector
Input Hose from Outside Water Tank
70The through wall bolts go on the lower pipe
clamp
71(No Transcript)
72Images of the Arial Home Toilet and Shower
73(No Transcript)
74The Arial Home Electrical System
75Only two panels have electrical wiring, 23 and 25
Shower
Blue lines are metal conduit, Red line is Wiremold
Bathroom Ceiling Light
Outside power from public utility or solar panels
on roof
Bathroom curtain wall
Bedroom Sconce Light
Kitchen Sconce Light
Family Room Sconce Light
Represents light switch
Solar Front Door Light
Represents an outlet
Electrical Plan for an Arial Home Version 5.2
76The inverter and the 12 vdc pump are wired
directly to the battery terminals using ring
terminal connections on the end of the 8 gauge,
stranded wires. The Red wires go to the
Positive terminal, the Blue wires go to the
Negative terminal.
77Panel 23 Showing DC Power coming in from solar
panel (red pipe), inverter (dangling in photo),
and input hose from water tank (green hose at
bottom).
78Finished Arial Home in SketchUp
79(No Transcript)
80Compact Fluorescent and LED Lighting
Five compact florescent bulbs light the inside of
the Arial Home, each consuming just 14 watts of
power per bulb. The front door light is a self
contained photovoltaic cell/battery unit powering
two LED lights.
81811
23
25
24
Shelves
Shelves
Arial Home Suggested Furniture Placement
82(No Transcript)
83Arial Home Kitchen/Dining Area, Ensenada, Mexico,
Sept. 27, 2008
84(No Transcript)
85Note the pipe clamp that holds the curtain rod
securely in place
86(No Transcript)
87(No Transcript)
88(No Transcript)
89Safety Rules No Exceptions!
- Wear gloves when handling panels (they have sharp
edges) - Two people per ladder someone is ALWAYS holding
it when in use - Wear knee pads when kneeling
- No tools on the pad or ground EVER!
- Pick up any dropped screws immediately
- Trash goes in the trash bags, not on the pad,
work table or ground - Tools in use go on the work table, tools not in
use are returned to the quartermaster - No running with scissors or any other sharp
object! - No jumping off the roof use a ladder that is
being held
90Example of tools being left in unacceptable
spots. Use the tool cart!
91Beware of the 90 Syndrome
- 90 done is NOT done
- Furniture must be put together
- The house and yard must be thoroughly cleaned
- Everyone picks up trash
- Everyone loads the bins and the vehicles
- After Day 1, most items stay behind, locked in
the house
92Example of Role Assignments
- Quartermaster and Floor Plan Director - Emily
- Screw Guns Matt, Ben, Eliot
- Panel Positioners Megan, Andrew, Andy, Jeff
- Caulk Gun - Dana
- Plumbing Nuno and Moises
93"Never doubt that a small group of committed
people can change the world. Indeed, it is the
only thing that ever has." - Margaret Mead
Arial Home built for the Vargas family by the
Princeton team, Feb 13, 2008 Tom Cathie Johnson
68, Dick Seggel 68, Jim Sherman 69, Tom Jane
Pirelli 69