Sin ttulo de diapositiva - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

Sin ttulo de diapositiva

Description:

Opening of power markets widening the number of actors. and at the same time, modern society expects a. reliable and secure energy supply ... – PowerPoint PPT presentation

Number of Views:52
Avg rating:3.0/5.0
Slides: 12
Provided by: adi763
Category:
Tags: diapositiva | keys | sin | ttulo

less

Transcript and Presenter's Notes

Title: Sin ttulo de diapositiva


1
FENIX Flexible Electricity Networks to Integrate
the eXpected energy evolution
2
Our vision ...The current situation
  • European electricity systems are facing key
    challenges
  • Increased environmental consciousness and
    ambitious for a sustainable society
  • Outdated infrastructures and market uncertainty
  • Opening of power markets widening the number of
    actors

and at the same time, modern society expects a
reliable and secure energy supply
3
Our vision ...In summary
Open Electricity Markets
DER
Efficient energy management
LSVPP
Inter-operability of electrical systems
Secure supply from parallel 35 to 70
4
Transmission grid
Distribution grid
Generation
Consumption
5
LSVPP From Local to Global
FEW TD network global systems
Aggregation middle level LSVPPs of different
types
MANY Local units (DER units, active customers)
Common Focus
6
CPP VPP
?
  • Characteristics
  • Max Capacity
  • Pmin, Pmax,Qnim, Qmax
  • (2) Actual output
  • Pac, Qac
  • (3) Automatic response
  • -governor
  • -voltage control
  • (4) Costs
  • Characteristics
  • Max Capacity
  • Pmin, Pmax,Qnim, Qmax
  • (2) Actual output
  • Pac, Qac
  • (3) Automatic response
  • -governor
  • -voltage control
  • (4) Costs

7
Vision A Decentralized Intelligence
8
Keys for FENIX
  • Target Establish the electrical and information
    architecture to incorporate the DER within the
    electrical networks, obtaining the most benefits
    from them
  • Bidirectional communication and large flow of
    information
  • Transmission Distribution considered
  • All sizes of DER considered (from wind farm to
    domestic)
  • Economic efficiency and markets (whole system and
    intra-LSVPP)
  • Distributed intelligence
  • Feasible gradual approach looking for easy to
    realise benefits
  • Stakeholders and Regulations considered, within
    the project and in connection with it

9
Outline implementation plan
10
Fenix Structure
SP 0 Project Management
SP 1 Strategies for restructuring networks
SP 3 System Solutions for DER Integration
(LSVPP) and Demand Response at local level
SP 2 Global Information and Electrical
Architecture
SP 4 Field validation
SP 5 Stakeholders Advisory Group Dissemination
and Training
11
Duration and Partnership
  • 4 years project
  • A number of Utilities, Manufacturers, RD Centres
    and Universities, covering reasonably the
    diversity of Europe
  • The consortium is defined. SMEs for technology
    implementation will be seeked at year 2 of the
    project
Write a Comment
User Comments (0)
About PowerShow.com