Base Protocol Document: -03 to -04 to -05 Changes - PowerPoint PPT Presentation

About This Presentation
Title:

Base Protocol Document: -03 to -04 to -05 Changes

Description:

Add Total Options Size Field. All other options details deferred to a separate document. ... TRILL Ether Type | V |M|R|Op-Length| Hop Count ... – PowerPoint PPT presentation

Number of Views:44
Avg rating:3.0/5.0
Slides: 12
Provided by: Dona85
Learn more at: https://www.ietf.org
Category:

less

Transcript and Presenter's Notes

Title: Base Protocol Document: -03 to -04 to -05 Changes


1
Base Protocol Document-03 to -04 to -05 Changes
  • Donald Eastlake 3rd
  • 1-508-786-7754
  • Donald.Eastlake_at_motorola.com

2
TRILL Base Protocol Draft Changes that Have
Occurred
  • 17 Jan. 2007 draft-ietf-trill-rbridge-protocol-02
  • 5 March 2007 draft-ietf-trill-rbridge-protocol-03
  • March 2007 IETF Meeting Prague
  • Changes from -03 to -04
  • 22 June 2007 draft-ietf-trill-rbridge-protocol-04
  • Changes from -04 to -05
  • 10 July 2007 draft-ietf-trill-rbridge-protocol-05
  • July 2007 IETF Meeting Chicago

3
Changes from -03 to -04
  • Terminology
  • TRILL is the protocol
  • RBridges are the devices
  • Other see http//www.postel.org/rbridge/terminolo
    gy.html
  • Area Removed
  • ARP/ND Optimization
  • Included learning of IP addresses, optimization
    of some ARP/ND traffic

4
Changes from -03 to -04
  • TRILL Header Items Added/Changed
  • Add Total Options Size Field. All other options
    details deferred to a separate document.
  • Change TRILL Header to expand Version field to
    the Variation (V) field. Distinguish TRILL data
    and IS-IS messages by using Variation 0 and 1.
  • -------------------------
    -------
  • TRILL Ether Type V
    MROp-Length Hop Count
  • -------------------------
    -------
  • Egress RBridge Nickname Ingress
    RBridge Nickname
  • -------------------------
    -------

5
Changes from -03 to -04
  • Other Technical Items Added/Changed
  • End station address learning from decapsulated
    TRILL messages as well as received native frames.
    Transfer of end station addresses via per VLAN
    IS-IS optional.
  • Will be covered in a separate presentation
  • Add nickname allocation priority and optional
    configuration. Reserve nicknames 0 and 0xFFFF.
  • Move multicast router attached bit and group
    membership information from per VLAN to core
    IS-IS instance so they can be used to prune
    trees.
  • Discard TRILL data frames received on a port that
    does not have an IS-IS adjacency on it.
  • Additional material on inner/outer VLAN tags.

6
Changes from -03 to -04
  • Other Technical Items Added/Changed
  • Designated RBridges determination per VLAN with
    priority for becoming DRB also per VLAN.
  • For load splitting and correctness

Rbridge B
Rbridge B
VLANS
Rbridge A
Rbridge A
7
Changes from -03 to -04
  • Yet More Stuff Added/Changed
  • New top level section of Pseudo Code with
    existing and additional pseudo code.
  • Consistently state that VLAN pruning and IP
    derived multicast pruning of distribution trees
    are SHOULD.
  • Incremental Deployment Considerations Section.
  • Revised and extended Security Considerations
    section particularly incorporating reference to
    IS-IS security.

8
Changes from -03 to -04
  • Minor Items
  • Split RBridge details section into Header and
    Other.
  • Divide IANA Considerations section into IANA and
    IEEE parts.
  • Add IANA considerations for TRILL Header
    variations and reserved bit and normative
    references to RFCs 2434 and 4020.
  • Add TRILL message variations supported to the per
    RBridge link state information.

9
Changes from -04 to -05
  • Eliminate V bit
  • Change to distinguish TRILL IS-IS from TRILL data
    frames based on the Inner.MacDA instead of a
    TRILL Header bit.
  • TRILL frame gt TRILL Ethertype
  • TRILL data gt Inner.MacDA ! All-Rbridges
  • TRILL IS-IS gt Inner.MacDA All-Rbridges
  • Core IS-IS gt no inner VLAN Tag
  • Per VLAN IS-IS gt inner VLAN Tag present

10
Changes from -04 to -05
  • Technical Items Added/Changed
  • Permit optional unicast transmission of
    multi-destination TRILL frames when there is only
    one receiver out a port.
  • Also mentioned in Incremental Deployment Section.
  • Split IP multicast router attached bit in two so
    you can separately indicate attachment of IPv4
    and IPv6 routers.
  • Provide that these bits must be set if an RBridge
    does not actually do multicast control snooping
    on ingressed traffic so it will get all multicast
    traffic (per VLAN).

11
Changes from -04 to -05
  • Other multicast improvements.
  • Drop references to PIM.
  • Improve discussions of IGMP, MLD, and MRD
    messages.
  • Provide for optional encoding into V of pruning
    to make the job of transit Rbridges easier.
  • V 0, prune on VLAN, frame not fully analyzed
  • V 1, should only prune on VLAN
  • V 2, should prune on VLAN and to multicast
    listeners and routers
  • V 3, should prune on VLAN and to multicast
    routers
Write a Comment
User Comments (0)
About PowerShow.com