Title: JASA
1Project Director Signals Warfare
US Army Security Assistance Command Partnering
Day Hosted by NDIA/USASAC
15 November 2005
PEO IEWS GSS FMS Program Les Simon APM PD SW/CREW
11/14/05
2Agenda
- PEO IEWS/PD SW Overview
- Contribution to Stability Operations
- Contribution to Strategic Responsiveness
- GSS FMS Program
- Closing Remarks
11/14/05
3PD SW Product Line
GR/CS
CREW
MARSS
GUARDRAIL/Common Sensor
Medium Altitude Reconnaissance Surveillance System
ARL
Airborne Reconnaissance Low
Tactical SIGINT Payload
DCGS-A/N
Prophet
Aerial Common Sensor
Information Warfare Programs
FMS GSS
71PMSW.1.016
8/16/05
4Improve Capabilitiesfor Stability Operations
- Improve Intelligence Operations
- Data Format viable for User Consumption
- Common Hardware/Software Architecture
- Technology (Specification)
- Collaborate-Reach-Back US-Host Country Datalink
- Common US Radio
- Stable and Seamless Architecture
- Improve and Integrate HUMINT, MASINT with SIGINT
11/14/05
5Improve Army Capabilities for Strategic
Responsiveness
- Intelligence Data
- Coordinate and Share Information with Host
Country - US Army, US National Forces
- Assist CENTCOM on Intelligence
- Global War on Terrorism
- Conduct Predictive Analysis Operations
- Monitor and Track Terrorism Activity via C4ISR
Operations - Location
- Pre-deploy Intelligence Operations in Neighboring
Countries - Strategic Importance for On-going Surveillance
Operations - Multi-Borne Intelligence
- Operational and Collaborative Coalition INTEL
Data with Integration of Ground-based/Sea-borne/Ai
r-Borne Activities
11/14/05
6GSS FMS
- Provide Status of FMS Program - Ground
Surveillance (ELINT) System (GSS) for the
Government of Egypt (GOE) - Program Objective
- System Baseline Performance
- Operational Scenario
- Schedule
- Funding
- System Sub-components
CS-3000 ELINT System
8/9/05
7GSS Program Highlights
- GSS Program Objective
- Design, Build, Test and Field 6 Ground
Surveillance Systems for Gov of Egypt Based on a
Negotiated, Sole Source Contract - Base Design on Currently Fielded EDO Dakota
CS-3000 System - Conduct In-Plant Government Acceptance, Ship to
Egypt for Full Fielding Hand-off - Provide Training, Spares and Field Support for 1
Year (Warranty) After Fielding
CS-3000 ELINT System
8/9/05
8FMS Ground Surveillance System (GSS)
Operational Concept
System Description
- Requirements LOA with Government of Egypt (GOE)
Requirements (w/Provisos) - CS-3000 Ground-Based Radar (ELINT) Collection
Systems Mounted in S-280 Shelters - 0.5-40.0GHz Intercept, DF Location
- Netted Operations (up to 6 Systems) for
Geo-location - Comms via Harris RF-5800V VHF Radios
- Signal Analysis/Processing Algorithms and
Databases Provided by the GOE
FLOT
Control Station for Netted Ops/Shelter Mounted GSS
Funding
Schedule
FY05 FY06 FY07
FY08
- Total FMS Purchase 13,366,763 (11,607,213
Contract 1,759,550 Govt) - Annual MIPRS From SAMD to PD SW for Manpower
Support
- Contract Award
- IPRs
- PMRs
- Design/Build/Integrate
- Test
- Ship to Egypt
- QAT
Contracting
- Contract Type Sole Source, FFP
- Contractor EDO Reconnaissance Surveillance
Systems, Morgan Hill Thousand Oaks, CA
11/14/05
9CS-3000 System Major Components
SCSI PULSE STORAGE INTERFACE
AOA-26400.5 TO 40 GHz OMNI ANTENNA
QUALIFIED VIDEO/STRETCHED AUDIO
19-INCHHIGH RESOLUTION COLOR MONITOR
RT-0118SVMICROWAVETUNER
1 GHz IF
IEEE 802.3LAN
160 MHz IF
RS-422TUNER CONTROL
ADF-26400.5 TO 40GHz SPINNING DF
ANTENNADistribution Millimeter Wave
Downconverter(Exterior Mounted Equipment)
RDU-3060 PULSE ANALYZER
RF
OPERATOR WORKSTATION
ACD-2622ANTENNA PEDESTAL CONTROLLER
ANTENNA CONTROLRS-422
RESOLVER ANGLE BUS
ANTENNACONTROL
9/8/05
10Closing Remarks
- Collective FMS Programs Strive to Meet Top-level
FMS Imperatives - PD SW and USASAC/SAMD have Partnered to Manage
and Execute the GSS Program - PD SW Stands Ready to Partner on Future FMS
SIGINT/ECM Related Initiatives - Challenges are in Releasability of Technologies
11/14/05