GullfaksVillage2010

About This Presentation
Title:

GullfaksVillage2010

Description:

GullfaksVillage2010 Gullfaks S r Omega Project Some cost data and economic assumptions Classification: Internal Classification: Internal ... – PowerPoint PPT presentation

Number of Views:1
Avg rating:3.0/5.0
Slides: 9
Provided by: Eltvik

less

Transcript and Presenter's Notes

Title: GullfaksVillage2010


1
GullfaksVillage2010
  • Gullfaks Sør Omega Project
  • Some cost data and economic assumptions

2
Gullfaks Omega - suggested cost data
  • Subsea development
  • One four slot template with all pipelines 1 500
    MNOK
  • Two four slot template with all pipelines 2 500
    MNOK ( 1 000 MNOK/template)
  • Fixed platform
  • Wellhead platform with 15 slots 4 000 MNOK
  • Jacket with 20 slot drilling unit 7 000 MNOK
  • Drilling
  • Semi-submercible 400 MNOK/well
  • Jack-up 300 MNOK/well
  • Own drilling rig 150 MNOK/well
  • For all three altenatives Drill four wells pr
    year

3
Gullfaks Omega suggested cost data
  • Omega operations cost
  • Operations sub-sea 100 NOK/bbl oe
  • Operations jack-up 80 NOK/bbl oe
  • Operations jacket 50 NOK/bbl oe
  • Gullfaks operations cost
  • Operations 10 NOK/bbl oe
  • Transportation 1 NOK/bbl oe
  • Plugging and abandonment
  • Sub-sea 200 MNOK
  • Jack-up 300 MNOK
  • Jacket 400 MNOK

4
Suggested economic assumptions and sensitivities
  • Economics assumptions
  • Oil price 400 NOK/bbl increasing 3 p.a.
  • Gas price 200 NOK/bbl oe increasing 3 p.a
  • Inflation 1
  • Discount factor 5
  • Run before tax economics
  • Value and Net Present Value
  • Internal Rate of Return (IRR, )
  • Sensitivities
  • Oil and gas prices increasing 5 p. a./decreasing
    2 p. a.
  • Production /- 30
  • Investments /- 40

5
Block 34/10 Oil field development in Norwegian -
a history about courage.
6
GullfaksVillage2010 Bergen 3/3 2010Program
  • 1100    Welcome to Statoil in
    Bergen     Petter Eltvik  
  • 1130    Tapas lunch 
    Outside Auditorium       
  • 1200    Experts in Team in Statoil Gullfaks
    Ole Jørgen
    Birkenes     
  • 1215    Some cost data and economic
    assumptions Petter Eltvik
  • 1230 Review of part A reports and part B
    assignments in individual groups  
  •               Group 1 LU007 Petter
    Eltvik/ Karl Sigurd Ã…rland
  • Group 2 LU004 Johan Eck-Olsen/Petter
    Eltvik
  • Groups 34 L1004 Knut Muller/Ole Jørgen
    Birkenes
  • Group 5 L1003 Eli
    Gule/Petter Eltvik
  • Group 6
    L1001 Esther Matland/Leif-Kristian Tveiterå
  • 1330 1500 Review of Gullfaks Sør
    Statfjord in Cave Gunnar Halvorsen
  • Groups 34 kl 1330, Groups 56 kl 1400
    and Groups 12 kl 1430
  • 1500    Review of the day/Summary
    Auditoriet    
  • 1600 Departure for Dolly Dimples,
    Kokstad         

7
GullfaksVillage 2010 Overview over Statoil
contacts
  • Group 1 Environmental Challenges by adding
    Chemicals to the WI
    Contact in Statoil Petter Eltvik
    petel_at_statoil.com. (also Karl Sigurd Ã…rland)
  • Group 2 Drilling through depleted Brent Gr.

    Contact in Statoil Johan Eck-Olsen
    jeo_at_statoil.com
  • Group 3 Improved oil recovery with Smart wells.

    Contact in Statoil Knut Muller
    knmu_at_statoil.com
  • Group 4 Improved oil recovery with Smart wells

    Contact in Statoil
    Ole Jørgen Birkenes olbi_at_statoil.com
  • Group 5 Improved oil recovery with WI

    Contact in Statoil Eli Gule egul_at_statoil.com
  • Group 6 Geological and Geophysical uncertainties
    Contact in Statoil Esther Matland
    estm_at_statoil.com (also Kristian Tveiterå)

8
Thank you
Gullfaks Sør Omega Project suggested cost and
economic assumptions
Petter Eltvik Project Manager GO
Project petel_at_statoil.com, tel 47 91 82 09
39 www.statoil.com
Write a Comment
User Comments (0)