PDTs - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

PDTs

Description:

PDT's. Readout. All 6 crates in global run. ... 3 FEB's replaced (MW TM HH) ... select and tapout dimuon event-tuples. initially these will be |eta| ~1 ... – PowerPoint PPT presentation

Number of Views:33
Avg rating:3.0/5.0
Slides: 17
Provided by: die82
Category:
Tags: pdts | tapout

less

Transcript and Presenter's Notes

Title: PDTs


1
PDTs
First, the PDT Status
  • Readout
  • All 6 crates in global run. x39 x34 frequently
    stop due to MFC related Front End errors.
  • 85/94 PDTs are in the global runs.
  • Infrastructure Electronics during access
  • 3 FEBs replaced (MW TM HH)
  • HV work on PDT 113/213 to jumper out a broken
    wire until Oct. shutdown. (MW TM)
  • Reprogram of BC-layer cobos Completed (HH)

2
Timing
Trigger Minbiasticksel 0
OLD Timing Plots
First crossing after synch gap (d.t.550 ns)
  • We have made adjustments to move the hits a
    little earlier (reducing t0s).
  • T0s are available for All PDTs
  • For 67/94 I have measured T0s from timing
    distributions. For the others I made an estimate
    based on the t0s of similar PDTs.
  • Three timing sets used so far
  • We havent looked at Pads yet - unpacking
    problems.

3
PDTs
  • Example of T0s from run 130080

4
PDT Problem
  • Mujet triggers provide sample of relatively clean
    high-pT muons. Sooo where are the tracks?
  • I used D0ev to identify the first event (14th in
    the file) that satisfied the mujet trigger. I
    used the save event button to extract it.
  • I used dsdump --raw --byteswap to display the
    contents of the event (200000 lines).
  • I hand-unpacked and hand event-displayed There
    were nice hits in B C layer PDTs that
    corresponded with the scintillator hits.
  • Onne Peters ran the muon code and made an event
    display picture of that event too.

5
Unpack Event Display
6
Event Display Picture
  • Then
  • Onne disabled hit selection and made the event
    display picture again.

7
First Central Muon Track in Run 2 Pbarp Collisons
8
Another Central Muon
9
Hmm
10
Hmm2
11
(No Transcript)
12
Summary/Plans
  • Central Muon ID suddenly will achieve higher
    efficiency.
  • Short Term proposed plan for muons
  • select and tapout dimuon event-tuples
  • initially these will be etagt1
  • hopefully within a week or so Reco will have a
    fix for central muons, too.
  • Use these to study performance and develop W and
    Z to muon object identification
  • I believe the events will be primarily b-bbar
    with non-isolated muons until we use isolation.
    Probably we should start where we were in Run I
  • delta R (mu-jet) gt 0.7 for 0.5 cone jets
  • good idea to check Run I publications
  • I recall W/Z and top had slightly different
    criteria

13
Conclusions
  • We believe PDTs are operating well.
  • Starting to put shine on the electronics.
  • Kill hot cells
  • fix missing channels.
  • Weve got t0s for all runs taken since April
    27th and a set of timing parameters which will
    set them to an average of 100 ns.
  • We have identified a change in software which
    will make it possible to find tracks in the
    PDTs.
  • A quick scan appears to show some electronics has
    been cables backwards.
  • Next step hand scan 500 tracks.

14
Central Muon during October Shutdown
  • Scintillators
  • The major task is an SFE cycle to correct a
    time-of-flight gate mistake.
  • PDTs
  • A-layer access to
  • Reprogram timing chips on Cobos
  • Replace a couple Cobos and FEBs to suppress hot
    or missing channels
  • Rewire FEBlt--gtCobo connections in Oct 1.
  • Broken wires
  • 10 PDTs have had broken wires jumpered out.
  • Procedure to fix the wire involves pumping and
    refilling with operating gas. So we ill need a
    Bob Kubinsky or other expert to assist with that.

15
Central Muon during October Shutdown
  • PDTs continued
  • Survey
  • The Run II position of some unsurveyed PDTs is
    known to no better than 1 from Run I data.
    Implication is (Dp)/p 300 instead of 20 in
    those directions.
  • Its important to complete the muon survey!

16
Central Muon during October Shutdown
Write a Comment
User Comments (0)
About PowerShow.com