Title: TOF Preliminary Design and Safety Review


1
TOF Preliminary Designand Safety Review
  • Project Management Controls
  • R. L. Brown

2
TOF Project WBS
3
Engineering and Design Controls
  • C-A/BNL institutional Standards will apply
    (SBMS).
  • Design and Safety reviews.
  • STAR Drawing control standard (STAR Note 106).
  • Change Control (Management Plan).

4
Design Reviews
  • Design reviews will be scheduled by the TOF
    Project office and will consist of Preliminary
    Design Review (Hello!), and subsystem Final
    Design Reviews (in project plan).
  • This PDR sets the baseline of scope for the
    project.
  • Final design reviews are held prior to subsystem
    major procurement or fabrication all action
    items satisfied.
  • FDR may be brief if there are no fundamental
    changes in design, schedule, or cost from PDR
    with action items cleared.

5
TOF Project PlanFully integrated resource
loaded, cost scheduled plan.
6
Project Milestones
  • Reportable milestones are found in Table 3 of the
    TOF Management plan and are derived directly from
    the TOF Project Plan.

7
Project Contingency
  • Risk is a function of the following factors  The
    sophistication of the technology, the maturity of
    the design effort, the accuracy of the cost
    sources and the impact of delays in the
    schedule.  Risk analysis shall be performed for
    each WBS element at the lowest level estimated. 
    Results of this analysis will be related to a
    contingency which shall be listed for each WBS
    element.  The goal is to make the method of
    contingency determination uniform amongst all
    project WBS elements.
  • Details of analysis covered in Management Plan.
  • Money is held and dispersed by BNL Project
    Oversight Manager (Ludlam) based on level of
    change approval.