Connections Details for Prefabricated Bridge Elements and Systems - PowerPoint PPT Presentation

1 / 25
About This Presentation
Title:

Connections Details for Prefabricated Bridge Elements and Systems

Description:

FHWA has initiated a project to develop this manual ... Fabrication and Construction. 2.1. Deck Systems. 2.2. Adjacent Butted Beam Systems. 2.3 ... – PowerPoint PPT presentation

Number of Views:532
Avg rating:3.0/5.0
Slides: 26
Provided by: mikec61
Category:

less

Transcript and Presenter's Notes

Title: Connections Details for Prefabricated Bridge Elements and Systems


1
Connections Details for Prefabricated Bridge
Elements and Systems
WASHTO-X Webinar Prefabricated Bridge Elements
and Systems June 17, 2008
Michael P. Culmo, P.E. CME Associates, East
Hartford, CT
2
Roadblocks to Accelerated Construction
  • The primary concerns that owner agencies have
    with respect to adopting accelerated construction
    techniques are
  • Need for Quality Details
  • Durability
  • Design Methodologies and Training
  • Construction Methodologies

3
Connections for Prefabricated Bridge Elements
and Systems
  • FHWA has initiated a project to develop this
    manual
  • This publication is intended to provide
    information that will go a long way to answering
    all four of the previous concerns.
  • Focus on details that have been used in the past.

4
Project Goals
Connection Details for Prefabricated Bridge
Elements and Systems
  • Gather details of Connections that have been used
    on accelerated bridge construction projects
  • Investigate transfer of technology from other
    markets into the bridge market
  • Parking Garages
  • Stadiums
  • Buildings

5
  • All details needs to pass a critical test
    before being published in the document
  • Does the connection result in a rapid
    construction process?
  • Does the connection transmit the forces between
    elements effectively?
  • Is the connection durable?
  • Has it performed well under traffic and in an
    exposed environment?
  • Is it cost effective and easy to construct?
  • If a process or connection is proprietary, can it
    be incorporated into numerous projects without
    producing contracting issues?

6
Source of Data
  • State DOTs
  • Questionnaires sent via e-mail
  • Federal Agencies
  • International Organizations
  • Researchers (previous and current)
  • Producers
  • Questionnaires sent via e-mail

7
Manual Organization
8
Connection Data Sheets
9
Precast Abutments
10
Precast Abutments
11
Precast Piers
12
Precast Piers
13
Precast Decks on PS Beams
14
Precast Decks on Steel Framing
15
Precast Decks
16
FRP Decks
17
Grid Decks
18
Partial Depth Deck Forms
19
Total Bridge Prefabrication
20
Total Bridge Prefabrication
21
Examples Epping NH
22
Epping Bridge Prefabrication
construction of 1-07.avi
23
Project Schedule
  • Gather information
  • Fall 2006 through Spring 2007
  • Visit states that are leaders in accelerated
    bridge construction
  • Winter 2007
  • Develop manual
  • Summer/Fall 2007
  • Complete Manual
  • Fall 2008

24
Project Delivery
  • The document will be available for all owners and
    designers for use in future accelerated bridge
    projects
  • Website will be established on the FHWA Highways
    for Life Website
  • www.fhwa.dot.gov/hfl/

25
Questions?culmo_at_cmeengineering.com