Title: Connection Details for Prefabricated Bridge Elements and Systems
1Connection Details for Prefabricated Bridge
Elements and Systems
Michael P. Culmo, P.E. Vice President of
Transportation and Structures CME Associates,
Inc., East Hartford, CT
2Roadblocks to Accelerated Construction
- The primary concerns that owner agencies have
with respect to adopting accelerated construction
techniques are - Need for Quality Details
- Durability
- Design Methodologies and Training
- Construction Methodologies
3Connections Details for Prefabricated Bridge
Elements and Systems
- FHWA has initiated a project to develop this
manual - This publication is intended to provide
information that will go a long way to answering
all four of the previous concerns. - Focus on details that have been used in the past.
4Project Goals
Connection Details for Prefabricated Bridge
Elements and Systems
- Gather details of Connections that have been used
on accelerated bridge construction projects - Investigate transfer of technology from other
markets into the bridge market - Parking Garages
- Stadiums
- Buildings
5- All details needs to pass a critical test
before being published in the document - Does the connection result in a rapid
construction process? - Does the connection transmit the forces between
elements effectively? - Is the connection durable?
- Has it performed well under traffic and in an
exposed environment? - Is it cost effective and easy to construct?
- If a process or connection is proprietary, can it
be incorporated into numerous projects without
producing contracting issues?
6Sources of Data
- State DOTs
- Questionnaires sent via e-mail
- Federal Agencies
- International Organizations
- Researchers (previous and current)
- Producers
- Questionnaires sent via e-mail
7Manual Organization
8Connection Data Sheets
9Precast Cantilever Abutments
10Precast Integral Abutments
11Precast Piers
12Precast Piers
13Precast Decks on PS Beams
14Precast Decks on Steel Framing
15Precast Decks
16FRP Decks
17Partial Depth Deck Forms
18Total Bridge Element Prefabrication
Everything shown can be prefabricated
19Total Bridge Element Prefabrication
Everything shown can be prefabricated
20Complete Bridge Element Prefabrication
- New Hampshire Project
- How fast can we build a bridge?
- Experimental project
- All components prefabricated
- 115 foot span
- Precast cantilever abutments
- Clock started after old bridge was removed
- Roadway open to traffic in 8 days
- Time Lapse Video on YoutubeTM
- Search Epping Bridge Construction
-
21Examples Epping NH
Epping Bridge Construction
22Manual Distribution
- Availability
- Published June 2009
- DOTs will receive copies
- Others will be given out at conferences
- Website being developed
- Is available through Local FHWA offices
- www.fhwa.dot.gov/hfl/
23Questions
- culmo_at_cmeengineering.com