Test - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

Test

Description:

Space and Naval Warfare (SPAWAR) Systems Center Charleston has been tasked by ... Project Engineer. SPAWAR Systems Center Charleston. Robert.j.mckee_at_navy.mil ... – PowerPoint PPT presentation

Number of Views:53
Avg rating:3.0/5.0
Slides: 13
Provided by: rka8
Category:
Tags: test

less

Transcript and Presenter's Notes

Title: Test


1
Test Evaluation Master Plan (TEMP) Overview
Space and Naval Warfare Systems Center
Charleston Advanced Technology Branch
2
TEMP Focus
  • Addresses the impact of requiring the use of
    contactless biometric card readers
  • Verify identity
  • Verify card authenticity and validity
  • Establish a plan for an Integrated Test and
    Evaluation Program (ITEP) for the card reader
  • Testing will support the Coast Guards second
    rule making for readers
  • Temp is a living document which is updated as
    plans mature or specific information is obtained
  • The TEMP is broken into sections
  • Introduction
  • Program Summary
  • ITEP Plan
  • ITEP Resource Summary

3
TEMP Introduction
  • Background on the TWIC program
  • Presents the 4 phases of the TWIC program
  • Emphasis on phases 3 (Prototype) 4
    (Implementation)
  • Provides card reader operational performance
    requirements and critical technical parameters
  • Planned test regions and facilities
  • Type
  • Business conducted
  • Employee count

4
TEMP Program Summary
  • Provides ITEP integrated schedule and
    organization
  • Schedule of critical events within the major
    testing activities
  • Organizational chart maps out the organizational
    entity relationships and documents each of their
    functions within the ITEP

5
ITEP Overview
  • ITEP has three major activities
  • Initial Technical Test (ITT)
  • Early Operational Assessment (EOA)
  • System Test and Evaluation (STE)
  • Three activities build upon each other to
    minimize redundancy
  • ITEP is predicated on this principle to decrease
    the amount of test duplication
  • Independent Test Agent (ITA)
  • Space and Naval Warfare (SPAWAR) Systems Center
    Charleston has been tasked by DHS to perform the
    ITA tasking for the ITEP

6
ITT Overview
  • Provides information regarding the technical
    capability of the card readers
  • Ensures the card reader will work for the EOA
    phase
  • ITT includes the environmental and specification
    conformance testing
  • Technical Test Plan
  • Incorporate Coast Guard regulations and Port
    requirements
  • Reader specifications
  • TEMP guidelines
  • Multiple Test resources will be leveraged
  • NIST laboratory testing
  • NAVAIR environmental testing
  • Vendor laboratory testing Is there any
    available test documentation?
  • Independent laboratory testing
  • Collect and Analyze Data
  • Submit Quick Look Report
  • Submit final report

7
ITT Overview
  • Visit 5 geographical locations
  • Determine specific pilot facilities for EOA
  • Collect data for EOA baseline test plan
  • Define/clarify roles
  • Determine test use cases
  • Identify access points and existing methods
  • Data collection methods and resources
  • Duration and amount of data to collect
  • Develop EOA baseline test plan
  • TSA/DHS approval
  • Submit to ports
  • Disseminate to data collection resources
  • Acquire port acceptance of plan

8
EOA Overview
  • Focuses on collecting early data to support
  • 2ND Rulemaking
  • Card reader suitability and effectiveness
  • Refinement for card reader specifications
  • Data collection EOA First stage
  • Testing will be overseen by SPAWAR (Either
    witnessed or reported daily)
  • Port resources independent of SPAWAR will be
    utilized
  • Baseline data will be compared to data after new
    TWIC reader installation
  • Reader Installation
  • Readers are down selected based on ITT test
    results
  • Port resources install selected TWIC readers
    (SPAWAR witnesses install)
  • Data collection
  • Data is collected using post installation test
    procedures in the plan
  • SPAWAR witnesses or data is reported daily
  • SPAWAR quick look report after reader
    installation
  • Data collection must be instantaneous reported
    for quick turn around
  • Analyze post installation data

9
STE Overview
  • Evaluates card reader effectiveness, suitability,
    and supportability
  • All inclusive of previous testing and results
  • Incorporates ITT and EOA lessons learned
  • Establish protocol for other sites/vessels to
    evaluate readers before the acquisition stage
  • Evaluate full impact of TWIC on facility and
    vessel operations
  • Port business process
  • Entrant processing
  • Modifications to current Access Control Systems
    (ACS)
  • Other burdens that face the facility or vessel
    operators to comply with TWIC
  • Finalize reader regulatory requirements
  • Support future card reader acquisitions
  • Support Coast Guards second rule making
  • Card readers will be subjected to normal
    operations
  • Monitoring will continue under normal operations

10
ITEP Resource Summary
  • Test articles
  • Sites and Instrumentation
  • Test Support Equipment
  • Simulations and Models
  • TE administrative support
  • Manpower and training
  • Technical interfaces

11
Port Questions
  • High low throughput times and access points
  • Sufficient duration and quantity of data
    collection
  • Peak Seasons
  • MARSEC levels for each access point
  • Measurement of flow of commerce
  • Dollar value
  • Time value
  • Relationship of throughput to dollars

12
Points of Contact
  • Mr. Richard Baker
  • Branch Head
  • SPAWAR Systems Center Charleston
  • Richard.L.Baker_at_navy.mil
  • (843) 218-4437
  • Mr. Richard Kaye
  • Project Manager
  • SPAWAR Systems Center Charleston
  • Richard.kaye_at_navy.mil
  • (843) 218-4105
  • Mr. Robert McKee
  • Project Engineer
  • SPAWAR Systems Center Charleston
  • Robert.j.mckee_at_navy.mil
  • (843) 218-4367
Write a Comment
User Comments (0)
About PowerShow.com