Restoration Alternatives Development and Evaluation - PowerPoint PPT Presentation

1 / 36
About This Presentation
Title:

Restoration Alternatives Development and Evaluation

Description:

Physical Setting. Sediment Properties. Potential Sediment Remediation Technologies ... Proposed Additional Core Boring, Sediment Chemical / Physical Properties ... – PowerPoint PPT presentation

Number of Views:41
Avg rating:3.0/5.0
Slides: 37
Provided by: jsmi92
Category:

less

Transcript and Presenter's Notes

Title: Restoration Alternatives Development and Evaluation


1
Restoration Alternatives Development and
Evaluation
  • West Branch
  • Grand Calumet River
  • By
  • Dan Sparks, USFWS, BFO
  • Presented by
  • Jim Smith, IDEM, OLQ

2
(No Transcript)
3
(No Transcript)
4
(No Transcript)
5
(No Transcript)
6
(No Transcript)
7
(No Transcript)
8
(No Transcript)
9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
(No Transcript)
15
(No Transcript)
16
(No Transcript)
17
(No Transcript)
18
(No Transcript)
19
(No Transcript)
20
Scope of Work
  • Phase 1 - Project Orientation
  • Task 1. Site Visit
  • Task 2. Literature and Data Review
  • Task 3. Data Gaps
  • Task 4. Local Support
  • Phase 2 - Fieldwork
  • Task 5. Work Plans
  • Task 6. Bathymetric and Topographic Survey
  • Task 7. Sediment Sampling and Testing

21
Scope of Work
  • Phase 3 - Analysis and Report
  • Task 8. Data Analysis and Alternatives
    Development
  • No Action
  • Natural Recovery with Monitoring
  • Dredging w/ confined aquatic, nearshore, or
    upland disposal
  • Dredging w/ dewatering and treatment
  • Dredging and capping
  • Capping

22
Scope of Work
  • Phase 3 - Analysis and Report
  • Task 9. Restoration Alternatives Report
  • Introduction
  • Physical Setting
  • Sediment Properties
  • Potential Sediment Remediation Technologies
  • Screening of Sediment Remediation Technologies
  • Development of Detailed Restoration Alternatives
  • Evaluation of Restoration Alternatives
  • Appendices, etc.

23
Scope of Work
  • Phase 3 - Analysis and Report
  • Task 10. Meetings
  • Site Visit
  • Public Meetings
  • Task 11. Project Management
  • Coordination
  • Correspondence
  • Subcontractors management, oversight
  • Billings
  • etc.

24
Results of Phase I
  • Technical Memorandum
  • Restoration Alternatives Development and
    Evaluation
  • West Branch Grand Calumet River
  • January 2002

25
Results of Phase I
  • December 11, 2001 Site Visit
  • Reviewed Literature and available data
  • Recommended Project Reaches
  • Identified 6 Data Gaps

26
Proposed Project Reaches and Past Sample Points
Hohman Ave.
Calumet Ave.
Indianapolis Blvd.
Columbia Ave
ap
White Oak Ave.
Railroad Bridge
State Line
Sohl Road
27
Burton Dorkin, 1994
28
Data Gap 1Bathymetric / Topographic Survey
  • Establish Riverbed Topography Core Sample
    Elevations
  • Develop Remedial Alteratives Establish
    Dredging / Capping Quantities
  • Assess Potential Disposal Sites
  • Evaluate Potential Access to River
  • Aid in Preparation of Final Restoration Plans

29
Data Gap 2Need Engineering Base
Drawings
  • Historical Sampling Locations
  • Proposed Sampling Locations
  • Show Contaminated Sediment Sections
  • Lay Out Preliminary Dredge / Capping Prisms
    Materials
  • Preliminary Locate Lay Out Access Sites
    Potential Disposal Areas

30
Data Gap 3 Transfer Sediment Core Data to
Base Drawings
  • Calculate (X,Y,Z) Sediment Core Data Locations
    Based on Bathymetric Survey
  • Place Data on Base Maps

31
Data Gap 4 Proposed Additional Core Boring,
Sediment Chemical / Physical Properties
  • Between Indianapolis Blvd White Oak
  • Between White Oak Columbia Ave.
  • Between Columbia Ave. Calumet Ave.
  • Between Calumet Ave Sohl Road
  • Between Sohl Road Hohman Ave.
  • Between Railroad Bridge State Line

32
Proposed Sampling
33
Data Gap 5Need Information on Access Sites
  • Very Shallow Water
  • Limited Access and Bank Stability for Equipment
    Insertion, Dewatering, Hauling
  • Bridges have no Horizontal or Vertical Clearance
    for Equipment Movement from River Reach to River
    Reach

34
Data Gap 6Local Sources of Services Material
  • Information is needed on
  • Local Labor
  • Dredging Equipment
  • Construction Equipment
  • Fleet Vehicles
  • Aggregate Sand
  • Concrete
  • Related Services

35
Whats Next
  • Do we Proceed with Phase 2?
  • Do we do all proposed sampling or reduce number?
  • Are all parameters identified?
  • Should we do additional Toxicity Sampling?
  • Do we obtain New Aerial Photos to develop
    topographic base maps or can we use some flown in
    1994 or 1995?

36