Title: POTTING OF SPECIMENS
1POTTING OF SPECIMENS
- Introduction
- Objective
- Requirements
- Procedures
Department of Orthopaedic Surgery
2Introduction
- Explanation to steps and methodology in potting
of specimens. - A general guide to the plotting style.
Department of Orthopaedic Surgery
3Introduction
- Potters are to follow
- - the potting steps in sequence
- - all safety instructions
- . Safety is everyones responsibility
back to Index
Department of Orthopaedic Surgery
4Objective
- Main Objective in potting
- Hold specimens securely in proper jigs and
fixtures for biomechanical testing.
back to Index
Department of Orthopaedic Surgery
5Requirements
-
- Before the start of the any job, it is a good
practice with a checklist to ensure all essential
tools are available and in good conditions
Department of Orthopaedic Surgery
6Requirements
Tool Listings
- Dental cement solution and powder
- Paper cups
- wood stirrers
- Jigs and fixtures to contain the specimen
- Set of screws (self-tapping)
- Specimens
- Screws drivers
- Hand drill and drill bits
- Personal Protective Equipment (PPE)
- Masking Tape
- Paper
back to Index
Department of Orthopaedic Surgery
7Procedures
- Thaw the specimens
- Remove soft tissues from site of the bone that
requires screw and dental cement attachment. -
CAUTION
Department of Orthopaedic Surgery
8Procedures
- 3. Attach screws in a way that properly holds
- the specimens and prevents slipping
- during the testing process.
- attaching the self taping screw to
the bottom end of the bone. - space and
distribute the screws evenly -
ensure dental cement can completely
cover the holding area
Department of Orthopaedic Surgery
9Procedures
- Drilling or sharp pointer ice pick assist in
placing the screw
Department of Orthopaedic Surgery
10Procedures
- In any drilling operation
WARNING
Department of Orthopaedic Surgery
11Procedures
- 4. Select suitable
- - Screw size and driver
-
- Attach screw to
- specimen
-
- Ensure proper
- engagement
Department of Orthopaedic Surgery
12Procedures
- 5. Clear jig off oil, grease and other
containment. - Ensure
- gt3 bolts are in placed specimen in
- place
Department of Orthopaedic Surgery
13Procedures
- 6. Attach masking tape to side wall
- Prevents leakage of cement fluid to
- threaded area
Department of Orthopaedic Surgery
14Procedures
- 7. Specimen should be potted in a stable
- position and on a level ground.
- 8. Any mixing of chemicals should be carried
- out in the fume hood.
- Proportion of mixture 1 portion of fluid 2
Portion of powder
Department of Orthopaedic Surgery
15Procedures
WARNING
Department of Orthopaedic Surgery
16Procedures
- 9. Pour mixture into jig and wait for mixture
- to solidify.
WARNING
Department of Orthopaedic Surgery
17Procedures
- 10. Clear off any side spill
- Ensure all screws are well conceal in
- the fluid level.
Department of Orthopaedic Surgery