Title: Fall Meeting
1Fall Meeting
2In June there was Apprehension
3Everything turned out FINE
4IMS2004 Financial ReportSeptember 18, 2004Terry
Sibley
Another Record-Breaking Symposium!
- Budget as approved by IEEE
Income 2,330,630 (including 50K
loan) Expenses 1,929,955 (with loan
payback) Net Surplus 400,675 (20.8 of
expenses)
Income 2,355,370 (including 35K
loan) Expenses 1,404,260 (73 of
budget) Net Income 951,110 (67.7 of
expenses)
- NOTE ARFTG Income and expenses are included in
the actuals, although not part of the official
budget. The net effect is zero. - Projections are 98 accurate. All hotel,
catering, and A/V bills have been paid. Other
income/expenses are based on invoice or
preliminary reconciliation report from Horizon
House.
5Reconciliation of Projected Incomeand Expenses
6IMS2004 Income Summary
NOTE Without ARFTG, income would be 2,319,058,
or 99.5 of Budget.
Without Booth Rental income would still have a
surplus of 85K Last time this difference was
positive was in 1998, Baltimore
7Steering Committee
- 57 Dedicated Volunteers
- Representation from Academia and many Companies
- Years of hard work
I would like to thank them
8IMS2004 Steering Committee
General Chairman Karl Varian Vice
Chairman David Zimmermann Secretary Denis Drury
Finance Terry Sibley, Chairman Mike Blackwood
Publications David Denniston, Chairman Richard
Carlson Publicity Mikel White
Registration Jerry Grimm Awards Banquet John
Wassel Plenary Session Dave McQuiddy Hal Sobol
Protocol Britton Vincent Special Transactions
Editor Randy Lehmann And a special thanks to
our student volunteers
Technical Program Alan Davis, Co-Chairman Ron
Carter, Co-Chairman Kurt Ericksen Jung-Chih
Chiao Electronic Paper Manager Bill Cantrell
Interactive Forum Jon Bredow Panel Sessions
Meng Tao, Chairman Sungyong Jung Workshops
Tutorials Steve March, Chairman Carl
Panasik Claudio Montiel Simon Lee Steve Lazar
Student Paper Contest Chuck Goldsmith Web
Team Donald Butler, Chairman Tim Lee Ken Tallent
MicroApps Leon Jinich Bob Hawkins Danny
Balusek International Liaison Larry Whicker
Local Arrangements Shane Bringhurst,
Chairman Shelly Pierce, Vice Chairman Michael
Hawkins Wayne Brinlee Leslie Horton Conference
Administrator Elsie Cabrera RFIC
Interface Steve Lloyd, Chairman Eli
Reese ARFTG Charles Gustof Natalia Bynum Juan
Rodriguez Sunny Yeoman Pete Winson Historical
Exhibits Danny Bryant Austin Truit Guest
Programs Carol Varian, Chairman John Heston
Exhibition Manager Howard Ellowitz,
Manager Harlan Howe, Manger Kristen
Dednah Charles A. Ayotte Fort Worth Convention
and Vistors Bureau Heather Huhn
9What steps were used to obtain this surplus?
- As proud as I am of the IMS2004 Steering
Committee, I believe that it is not significantly
different than previous committees - Income was raised slightly (5), but this was
offset by a smaller total attendance (-12.9) - Budget and actual income was within 1
- Roughly a 90K Transportation charge
- I believe we did above average in planning (5K
here, 10K there, 25K --- after a while it adds
up to some real money) - Expenses were much lower than planned
Location
Location
Location
Fort Worth is a GREAT place for The Conference
10International Microwave SymposiumInterest Health
Check
- 1999 2000 2001 2002 2003 2004
- Exhibits Only 2203 1969 1869 1549 2554 1886
- Exhibitors 4526 5997 5540 3313 4852 4429
- Vendors 389 451 565 532 520 476
- Booths (paid) 677 776 886 834 817 798
- Booths (total) 696 803 905 856 862 816
- Papers Submitted
- IMS 780 837 937 886 1085 970
- RFIC 55 101 124 122 256 311
- ARFTG N/A N/A 31 23 38 42
- Student Comp 92 169 242 241 276
292
Interest in the IMS continues during the recent
economic down turn
11International Microwave Symposium Attendance
Attendance has held up better than most Symposia??
Exhibitors 5540 3313 4852 4429 Vendors 565 532 520
476 Total (de-dup) 11,075? 8287 10177 8869 Member
ship 13,394 13,340 12,108 11,412
12International Microwave Symposium
What is new this year?
- Emphasis has been to maintain the positive
experience for ALL while controlling costs - Improve / refine Symposium operations
- Would recommend that ALL future IMS finance
chairs adopt the matrix method - It really helps future Symposia
13Things that were changed at IMS2004
- Made it clear that panel sessions were open to
ALL attendees, box lunches were optional - A consequence of this was that we did not know
the attendance in advance for any of the panel
sessions - Not all of the panel sessions were well attended
- RFIC and IMS TPC were NOT co-located
- Only one question as to why RFIC program not in
IMS Program - Tuesday Interactive forum was allocated to RFIC
and the student paper contest (equal out the
number of towers between the three days) - No joint sessions between RFIC and IMS (only one
in 2003) - Would recommend that we drop the MTT organized
tours and turn this function over to a tour
company - Information concerning the historical exhibits
was not as timely (although everything was on
time) as I would have liked
14Changed in IMS2004, 2 of 12
- Made an overt effort to reduce the number of
interactive sessions by restricting the number of
papers per TPC committee - Only used 61 of a maximum possible 66 session
slots - Paper Submissions were in .pdf file format only
(a Microsoft Word and a LaTeX template were
provided that would produce a compatible .pdf
file) - Two papers by same author were arranged one after
the other in a session by the TPC. The session
chair let the two papers be combined into a
single paper with a 40 minute time slot. Would
not recommend doing this in the future. - No dumbing down of digest papers was detected,
would not recommend checking next year
15Changed in IMS2004, 3 of 12
- Due to reported large use of digicams in 2003,
we emphasized in the sessions that the use of
recording media was not permitted. No major
noting of recording media was made. - TPC committee reduced to 256 people (50 people
reduction in TPC size) 216 show up on site, 30
no-shows - Would not recommend that we use MIRA for the
electronic paper handling - Worked with IEEE publications to come up with a
.pdf format that was Xplore compatible. After
the papers were in, IEEE check the papers and
found that almost none were compatible. (9/1/04
press release says it is now available) - One Workshop cancelled on-site due to low
attendance (organizer suggestion), we either gave
the attendees their money back or attendance to
another workshop
16Changed in IMS2004, 4 of 12
- 58 student volunteers were used for distribution
of workshop material, registration, banquet,
historical exhibit, etc. (most were from the
University of Texas-Arlington) - For future Interactive Forums located in the
exhibits area, close the Interactive Forum
prior to the exhibits being closed. - Would continue to recommend that the next years
registration chairman volunteer to help man
current year, the training is invaluable - A clearly defined refund and customer service
policy was determined prior to the conference - Recommend that registration volunteers be trained
in the afternoon and then work the following
morning for an 8 hour shift
17Changed in IMS2004, 5 of 12
- Creation by the HH staff of a short report that
could be run at any time to get registration
numbers was greatly appreciated by the steering
committee - IMS2004 Registration form did not include the
ARFTG Historical CD, needs to be added - Registration for on-site tours was done manually
- US Government credit cards require special
authorizations, was not completed till Monday of
Microwave Week - Some workshop presenters still think that they
should not have to pay for not only the workshop
but everything else - Would recommend future workshop lunches not be
boxed - Protocol, consumed a great deal of time
determining the various allocations (April
early May time frame)
18Changed in IMS2004, 6 of 12
- Still getting complaints about handing out the
workshop notes - Need a process to where exhibitors can obtain IMS
material (CD-ROM, digests, etc.) without
registering again - Have the IEEE membership booth, look up an
individuals IEEE membership number - Add comment to registration login screen asking
Do you want to become an IEEE member? Click
here (Cost savings) - To provide registration with a list todays
events - It would be a good ideal to put on the web page
that if some can not attend, what their options
are a letter for someone else to attend in their
place, someone else to pick-up their registration
material, etc. - Generally IMS2004 SC meetings were held as one
group on Saturday from 900am to 200pm (lunch
was provided)
19Changed in IMS2004, 7 of 12
- Special Issue
- A total of 126 papers were submitted on time
compared to 134 papers last year. - 65 papers were accepted this year compared to 53
in 2003 - Acceptance Rate 52 (40 in 2003)
- 60 new material was required for expanded papers
- In regards to the Special Issue, would recommend
continuing with MTT infra-structure - A side benefit is the ability to close the books
sooner and at lower cost to IMS (350 vs 15K) - Workshops is a much bigger job than most people
think (in our case 40 workshops / tutorials
CD-ROM, Books, etc.) - Workshop notes over allocation varied from not
enough to 200 - Need a VERY strong web site
20Changed in IMS2004, 8 of 12
- Student paper contest went VERY smoothly,
followed suggestions from IMS2003 - MicroApps
- Provided a CD-ROM of presentations (free)
- Room was great
- Attendance went up to 50 people (low at start
grows until a break) - Larry Whicker provided his usual outstanding
service, additional task was of invitation
letters is becoming a significant activity - Local arrangements were handled by both Shane
Bringhurst (local, planning / execution) and
Elsie Cabrera (CMS, execution / planning) - Transition to Elsie was smooth because of this
arrangement
21Changed in IMS2004, 9 of 12
- Signs - used both sides, and for technical
sessions had the morning session on one side and
the afternoon sessions on the other side - For rooms with multiple entrances, make a sign
for each entrance - When a room changes, cross out the old and write
the new room next to it, it informs all that the
room has changed - Do not provide lunch for the spouses
- Provide meal budgets to CMS
- Separate registration for the tours
- Make clear the handling of the ARFTG budget
- Having ARFTG Conference in a separate Facility
than IMS made for better and easier ARFTG
arrangements
22Changed in IMS2004, 10 of 12
- Suggestions for ARFTG
- Standard format for signs.
- Provide Authors a better direction to where to
fine the standard format for papers. - Needs a better standard format papers.
- Standardize their TPC
- Reduce the length of time between closing
off-site registration and the opening of the
on-site registration - The Golf tournament had about 40 people in
attendance, and was almost fully sponsored
(IMS2004 cost 250) it was successful - Made overt effort to increase communication
between the three conferences and future IMS
symposia. - Had only one request for a overhead projector
- Exhibits only flyer appears to be a benefit,
highest exhibits only attendance since 2000
23Changed in IMS2004, 11 of 12
- Program input supplied to HH as it arrived and in
ASCII format, we never saw the final product
until we saw the proofs - Setup a IMS Kinkos account EARLY in the week
- Get photos of IMS2004 Steering Committee in
December - Need a better way to inform student paper
finalist about photography requirements - Need a means to get last-minute photos off a
digital camera and transferred to flash drive or
laptop for inclusion in presenters speeches - Have a clearly defined place for handing out
workshop notes and CDs. - Only one person controls the daybook at a time
(either it be the Local Arrangements chair, or
the CMS representative.) - Have the event request forms added into the
daybook.
24Changed in IMS2004, 12 of 12
- Have a separate war-room for AdCom. It was a
huge distraction having AdCom people hanging out
in the war-room all day. Also they kept taking
food and snacks that were intended for the
steering committee. - Need to revise the IEEE / CMS contract.
Initially I would suggest that we take a pay by
the drink approach until we get some history and
then consider a blanket type of contract. - RFIC interface was very smooth, no issues
- Chair-to-Chair discussions with RFIC Liaison
follow-up worked well (no surprises) - ARFTG interface was also very smooth with the
liaison also doing the technical program - A video tape of a previous MERA presentation was
converted into DVD format and a copy was provided
to the MTT history museum
25General AttendanceBased on Advance Registration
- Symposium attendance is down
- Exhibitors attendance is down
- Overall attendance is down
- Causes
- Economy is still recovering
- Business expenses lag the economy
- Exhibitors are not getting the return on their
investment that they would like to see
Final on-site with duplicates, bold highest
total
26Symposia/Workshop Advance Attendance
- All Symposia experienced greater attendance in
Seattle - RFIC and IMS significantly lower
- ARFTG constant
- Workshops and Tutorials slight decrease
- Why was there a drop in Symposia and workshop/
tutorial attendees?? - Fewer dual registration
- More presentations with same presenter
- Fewer attendees not presenting papers
- Workshops in competition
- Economy
- Publicity
- Price structure
- Visa
Final on-site with duplicates, bold highest
total
27Digest/CDs/Awards Banquet/RFIC Reception
- We are successfully pricing IMS paper digest to
be discontinued - Drop in CD purchases maybe related to increased
price?? (cheaper to copy) - Drop in Award Banquet attendance
Final on-site with duplicates, bold highest
total Includes IMS Registration w/ Digest
28Panel / Rump Sessions
- Comments
- No Rump sessions in the past three years
- Seattle had greater attendance
- Better topics
- Lower technical session attendance (see for
related comments) - Too many things running in parallel
29Spouses Tours (Daily Pick-up, Advance)
- Comments
- Seattle (48 avg)
- First time to area for Society
- Philadelphia (65 avg), Does not included on-site
registration - Hospitality Suite provided information on how to
utilize existing transportation for self guided
tours - Only one tour/day made except Wednesday
- Fort Worth Assumptions (45 avg)
- The Wednesday tours did not make
- Due to effort required, suggest removing tours
and offering destination information in the
hospitality suite
30IMS Attendance Trends by CountryUSA Removed
31Lazer Pen Battery Replacement
32(No Transcript)
33IMS2004 Expense Summary
Expenses off due to previous poor actuals, used
budgets for plan
34Allocation to Separate Conferences
- Goal of audit and closing of the books by year
end - Use of non-IEEE auditor (Is this cost effective?
Will IEEE conduct an additional audit?) - Presently HH is tall pole. HH and IMS2005 have
agreed in principal to provide HH with funds to
keep the registration account open, need to work
details. Goal end of the month!
35Top 10 Registration Fees Increased 5
- Fees adjusted to encourage membership and make
adjustments - IMS2004 top 10 (assumed previous years are
similar) of 39 income items - Average fee increase based on sum of top 10 items
- Believe it is best to continue raising fees
slightly every year
36All Food and Beverage Costs Are Captured in
Matrix Format
Food and Beverage is 26.5 of total expense
37All Audio/Visual Costs AreCaptured in Matrix
Format
A/V is 9.7 of total expense
38Workshop Income and Expenses
26.4 of total income is from workshops 25.4 of
surplus from workshops
The general meetings and workshops are equally
profitable
39IMS2004 Income and Expense Profiles
40Many Happy Returns