WCA3A3B Levee Seepage Management - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

WCA3A3B Levee Seepage Management

Description:

B-501: Access to Holly Lakes Mobile Home Community from US 27. Other potential access sites ... L-502C: Levee around the Holly Lakes Mobile Home Community ... – PowerPoint PPT presentation

Number of Views:134
Avg rating:3.0/5.0
Slides: 11
Provided by: emiliova
Category:

less

Transcript and Presenter's Notes

Title: WCA3A3B Levee Seepage Management


1
WCA-3A/3B Levee Seepage Management
  • By
  • Rod Ghioto, P.E. Max Day, P.E.
  • Brown and Caldwell SFWMD

2
Water Preserve Areas Background
  • Water Supply Preserves
  • East Coast Buffer Concept
  • Comprehensive Everglades Restoration Plan

3
Water Preserve Areas Program Objectives
  • Water Supply
  • Retain water in the natural system
  • Capture and store water currently discharged to
    tide
  • Reduce seepage from natural system
  • Environmental Restoration
  • Improve hydroperiods and water quality
  • Provide a buffer between natural and developed
    areas
  • Preserve and protect wetlands outside the
    Everglades (increase spatial extent)
  • Flood Protection (incidental)

4
Water Preserve Areas Projects
  • C-11 Impoundment (BC)
  • C-9 Impoundment (BC)
  • WCA 3A/3B Seepage Management (BC)
  • Acme Basin B (PBC)
  • Site 1 Impoundment (PBC)
  • North New River Improvements (BC)
  • WCA 3 Flows to Central Lake Belt Storage Area
    (BC)
  • WCA 2B Flows to Central Lake Belt Storage Area
    (partial) (BC M-DC)
  • Strazzulla Wetlands (PBC)
  • Dade Broward Levee and Canal (M-DC)
  • C-4 Eastern Structure (M-DC)
  • North Lake Belt Storage Area (partial) (M-DC)
  • Central Lake Belt Storage Area (partial) (M-DC)
  • Bird Drive Recharge Area (M-DC)

5
WCA-3A and 3B Levee Seepage Management
  • Ecosystem restoration
  • Seepage reduction from WCA 3A/3B
  • 156,000 ac-ft/yr
  • Wetlands spatial extent enhancement
  • Flood Protection (incidental)

6
Elements
  • Canals with Little or No Changes
  • C-500A Canal L-37 Borrow Canal
  • C-500B Canal L-33 Borrow Canal
  • C-501 Canal L-30 Borrow Canal from C-6 to the
    southern boundary
  • Canal Modifications
  • C-502B Canal Diversion canal between the C-11
    and the C-9 Canals (US 27 canal)
  • C-502B Canal (lined) Section of canal on the
    eastern border of Holly Lakes Mobile Home
    Community
  • C-502C Canal Seepage canal around the Holly
    Lakes Mobile Home Community
  • FPL Maintenance Access Road
  • Runs nearly the entire length of the WCA 3A/3B
    Levee Seepage Management Area from I-75 to the
    C-6 Canal. Raise road by 1 foot
  • 17 un-gated single barrel culverts 6 feet in
    diameter and 30 feet length
  • 2 un-gated 3 - barrel culverts 6 feet in
    diameter and 30 feet length at FPL access road

7
Elements (continued)
  • Bridges
  • B-500 Access to FPL substation from US 27
  • B-501 Access to Holly Lakes Mobile Home
    Community from US 27
  • Other potential access sites
  • Levees
  • L-502A Levee from L-37 Borrow Canal near I-75
    to the C-11 Canal along the eastern boundary.
    Spoil material take the place of levee in some
    areas
  • L-502B Levee along the eastern boundary from
    C-11 Canal to the C-6 Canal spoil material will
    replace levee
  • L-502C Levee around the Holly Lakes Mobile Home
    Community
  • L-503 Levee at the eastern boundary (C-6 Canal
    to the southern boundary)

8
Elements (continued)
  • Pumps and Water Control Structures
  • S-507 60 cfs Seepage Pump Station at Holly
    Lakes Mobile Home Community
  • S-515 600 cfs gated culvert with 2-barrel
    culvert 8 feet in diameter and 60 feet length in
    the C-6 Canal at the east property line
  • S-9XN and S-9XS Control structures in the C-500
    A B Canals
  • Other Features
  • Tracts 102-012 and 102-013 debris coverage
  • Removal/isolation/containment
  • Seepage protection, Jones Trailer Park
  • Protection of existing fiber optics cables along
    the eastern border
  • Clearing and grubbing and removal of exotics
  • Appropriate monitoring activities

9
Status and Targets
  • Currently under design
  • Completion August 2006
  • Construction Completion Early 2009

10
Questions
Write a Comment
User Comments (0)
About PowerShow.com