Title: MONDAY 04 AUGUST 2003
1MONDAY04AUGUST 2003
2WELCOME
- HAIVAN PASS TUNNEL CONSTRUCTION PROJECT
3Table of Contents
- Background of Project
- Description of Project
- Introduction of Each Package
- Message
4Background of Project
- Important role of National Highway No. 1
- North South longitudinal arterial in the
country as the most important transport
infrastructure of the national economy - An integral part of international gateway
East-West Corridor connecting Thailand through
Laos to Danang Port and Dung Quat Industrial Zone
5Background of Project
- The Haivan pass section of the National Highway
No. 1
6Background of Project
- Results of Origin-Destination Survey during July
2002
7Description of Project
- The Haivan pass section of the National Highway
No. 1
Begins at Km. 894000 near Lang Co Town (Thua
ThienHue Province)
Runs across the Haivan Pass peak at with an
elevation of 475m, with a distance of 20.45 km
Ends at Km. 914450 just north of Danang City
Haivan Pass section is a very low standard
highway. In spite of many efforts of Vietnamese
government on upgrading this section, it is still
a dangerous highway to drive and many lives lost
each year in accidents on this section
8Description of Project
- Estimated Total Amount USD 143,375,000
- Implementation Program
- Design stage July 1998 July 1999
- Tendering stage June 1999 present
- Construction stage October 2000 April 2005
- Design Standards TCVN (Vietnam), JHPC (Japan)
and AASHTO-1994 (USA) - Design Life Permanent
- Design Speed 80 km/h
- Design Load H30 XB80
- Construction Contract Packages 9 packages
9Description of Project
- Financing Agency
- Japan Bank for International Cooperation (JBIC)
- L/A No. VNIV-5, March 26, 1997, Loan Amount JPY
5.5 billion - L/A No. VNVI-5, March 30, 1999, Loan Amount JPY
10.0 billion - L/A No. VNIX-4, March 29, 2002, Loan Amount JPY
3.359 billion - Executing Agency
- Ministry of Transport and Communication (MOT)
- Represented by Project Management Unit 85 (PMU85)
- Consultant
- Joint Venture of Nippon Koei Co., Ltd (Japan) and
Louis Berger International Inc. (USA) - In association with Transport Engineering Design
Incorporation (TEDI) Vietnam
10Description of Project
- Total Project Length 12,182 m
- Number of Traffic Lanes 2 lanes
- Tunnel Construction
- Main Tunnel 6,274m long, 2 lanes (3.75m
wide/each) , 89.0 m2 - Evacuation Tunnel 6,286m long, 15.5 m2
- Ventilation Adit 1895m long, 36.2 m2
- Bridge Construction 8 bridges, 1,653 in total
length - Highway Construction 4,273m in total length
11Description of Project
12Description of Project
13Description of Project
- Location of Contract Packages
14Package IA North Tunnel Section
North Tunnel Portal
15Package IA North Tunnel Section
Front Cut Away Section
16Package IA North Tunnel Section
Cut Away Section
17Package IA North Tunnel Section
- Contract Data and Chronicle
- Name of Contractor Hazama (Japan) Cienco 6
(Vietnam) Joint Venture - Contract Amount US 43,256,000
- Contract Period 48 months (10/2000 10/2004)
- Contract Chronicle
- Contract Signing Date August 17, 2000
- Notice of Proceed September 01, 2000
- Commencement of Works October 01, 2000
- Location Sta. 1515 to Sta. 5500
18Package IA North Tunnel Section
19Package IA North Tunnel Section
A 3,857m long 2-lane main tunnel with 73.26 m2
cross-section
A 3,857m long evacuation tunnel with 15.47 m2
cross-section parallel to the mail tunnel
Two (02) vehicular cross-passageways with 15.47
m2 cross-section, and seven (07) pedestrian
cross-passageways with 8.12 m2 cross-section
A 1,810m long tunnel ventilation adit with 36.20
m2 cross-section
Two 153 meters long each, by-pass type
electrostatic precipitator tunnels (north
central) with 57.69m2 cross-section
A 128 meters 2-lane tunnel approach
A 403 meters long access road to adit building
A 80m2, one-story substation structure (building
only)
A north tunnel portal plaza and a ventilation
adit portal plaza
20Package IB South Tunnel Section
South Tunnel Portal Area
21Package IB South Tunnel Section
Front Cut Away Section
22Package IB South Tunnel Section
South Tunnel Portal
23Package IB South Tunnel Section
- Contract Data and Chronicle
- Name of Contractor Dong Ah (Korea) Song Da
(Vietnam) Joint Venture - Contract Amount US 27,863,000
- Contract Period 48 months (10/2000 10/2004)
- Contract Chronicle
- Contract Signing Date August 17, 2000
- Notice of Proceed September 01, 2000
- Commencement of Works October 01, 2000
- Location Sta. 5500 to Sta. 8125
24Package IB South Tunnel Section
25Package IB South Tunnel Section
A 2,417 meters long 2-lane main tunnel with
73.26m2 cross-section
A 2,429m long evacuation tunnel with 15.47 m2
cross-section parallel to the mail tunnel
Two (02) vehicular cross-passageways with 15.47
m2 cross-section, and four (04) pedestrian
cross-passageways with 8.12 m2 cross-section
A 153 meters long by-pass type electrostatic
precipitator tunnels (south) with 57.69m2
cross-section
A 208 meters 2-lane tunnel approach
A 817 meters long access road to high water
reservoir
A 1,400m2, one-story, vehicular maintenance
building
A 58.45 meters long, 2-lane, 2-span
post-tensioned girder bridge
A south tunnel portal plaza
26Package IIA Lang Co Bridge Section
Lang Co Bridge Area
27Package IIA Lang Co Bridge Section
Lang Co Bridge
28Package IIA Lang Co Bridge Section
- Contract Data and Chronicle
- Name of Contractor Thang Long Truong Son
Joint Venture - Contract Amount US 4,633,000
- Contract Period 30 months (07/2001 12/2003)
- Contract Chronicle
- Contract Signing Date May 03, 2001
- Notice of Proceed June 01, 2001
- Commencement of Works July 01,2001
- Location Sta. 18650 to Sta. 1515
29Package IIA Lang Co Bridge Section
Lang Co Bridge, 876.390 meters total length
Two lane roadway, 782.610 meters total length
A northern toll plaza and
Construction of 187m2 area enclosed car port
30Package IIB Southern Highway Section
General View of Construction Site
31Package IIB Southern Highway Section
Bridge in Design
32Package IIB Southern Highway Section
Bridge in Design
33Package IIB Southern Highway Section
- Contract Data and Chronicle
- Name of Contractor Cienco 1 Lung Lo -
Vinawaco Joint Venture - Contract Amount US 3,920,000
- Contract Period 32 months (07/2001 03/2004)
- Contract Chronicle
- Contract Signing Date May 28, 2001
- Notice of Proceed June 26, 2001
- Commencement of Works July 26,2001
- Location Sta. 8125 to Sta. 12047
34Package IIB Southern Highway Section
Six bridges, totaling 959.390 meters length in
which
Bridge No. 2 334m
Bridge No. 3 33 m
Bridge No. 4 175 m
Bridge No. 5 133 m
Bridge No. 6 150 m
Bridge No. 7 133 m
Two lane roadway, totaling 2963.067 meters length
A southern toll plaza
35Package III Electrical Works
Medium Voltage Switchboard
36Package III Electrical Works
SCADA System
37Package III Electrical Works
RTU used for Power Distribution Monitoring System
38Package III Electrical Works
- Contract Data and Chronicle
- Name of Contractor JO of ABB Kinden - VINAINCO
- Contract Amount US 20,686,000
- Contract Period 26 months (02/2003 04/2005)
- Contract Chronicle
- Pre-bid Conference April 18, 2001
- Bid Opening Date June 26, 2001
- Bid Evaluation June 27 July 11, 2001
39Package III Electrical Works
- Electrical Systems
- Medium Voltage System
- MV/LV Substations
- MV Power Distribution Lines
- Low Voltage Switchboards
- Low Voltage Switchboards
- LV Power Distribution Lines
- Interior Tunnel Lighting System
- Exterior (Road and Area) Lighting System
- Power Supply for the Ventilation and Water
Supply Systems - CCTV System
- Lighting Control System
- Fire Alarm and Detection System
- Telecom System
- Traffic Control System
- Radio Rebroadcast System
- Tunnel Power Distribution Monitoring and Control
System - Main Supervised Control and Data Acquisition
(SCADA) System
40Package IV Mechanical Works
Ventilation System
41Package IV Mechanical Works
Jet Fans for Tunnel Ventilation
42Package IV Mechanical Works
Motor Control Center of Ventilation System
43Package IV Mechanical Works
- Contract Data and Chronicle
- Name of Contractor Matsushita Itochu
Consortium - Contract Amount US 23,055,000
- Contract Period 36 months (03/2002 03/2005)
- Contract Chronicle
- Contract Signing Date January 18, 2002
- Notice of Proceed February 12, 2002
- Commencement of Works March 12, 2002
- Commencement of Works November 01, 2002
44Package IV Mechanical Works
- Water Supply and Treatment System consisting of
- Water catchment and pre-treatment system
- Pump station and treatment system
- High water reservoir
- Fire suppression pipe with hydrans
- Tunnel Ventilation System consisting of
- Three (03)sets of electrostatic precipitator
- Two (02)sets of air supply fans and exhaust
fans - Thirty-two (32) sets of jet fans
- Ventilation control system
- Ventilation building
45Package V 110/22kV Substation and 110kV
Transmission Line
Power Transformer
46Package V 110/22kV Substation and 110kV
Transmission Line
GIS 110 KV, 2500 KA 40 MA
47Package V 110/22kV Substation and 110kV
Transmission Line
Diesel Generator 1000 KW
48Package V 110/22kV Substation and 110kV
Transmission Line
- Contract Data and Chronicle
- Name of Contractor Joint Operation of ABB
Kinden - Vinainco - Contract Amount US 7,256,000
- Contract Period 18 months (12/2001 06/2003)
- Contract Chronicle
- Contract Signing Date September 15, 2001
- Notice of Proceed October 18, 2001
- Commencement of Works December 21, 2001
49Package V 110/22kV Substation and 110kV
Transmission Line
- Construction of 110/22 KV indoor substation and
tunnel control system - Design, manufacture, install, erect and
commission a 110/22KV Gas Insulated Switchgear
(GIS) substation and substation control center - Design, manufacture, install, erect and
commission a 110 Transmission Line
50Package VI Procurement of Maintenance Vehicles
Aerial Platform Truck
51Package VI Procurement of Maintenance Vehicles
Road Sweeper
52Package VI Procurement of Maintenance Vehicles
Water Sprinkler Truck
53Package VI Procurement of Maintenance Vehicles
- Contract Data and Scope of Work
- Contract Amount US 2,000,000 (estimated)
- The equipment and vehicles to be supplied
- Tunnel Superintendent Staff Car 03 units
- Patrol Car 02 units
- Road Maintenance Vehicle (Van Type) 02 units
- Road Maintenance Vehicle (Station Wagon Type)
01 unit - Water Sprinkler Truck 01 unit
- Road Sweeper 01 unit
- Vacuum Cleaner with High Pressure Washer 01
unit - Sign Truck 01 unit
- Lift Truck 01 unit
- Aerial Platform Truck 01 unit
- Multi Service Vehicle with Side Wall Cleaning
Attachment 01 unit - Cargo Truck with 3-ton Crane 01 unit
- Wrecker Truck 01 unit
- Ambulance Car (Van Type) 01 unit
- Fire Fighting Car (Pickup Truck Type) 01 unit
- Workshop Equipment and Tools 01 lot
54Package VII Infrastructure of Resettlement Area
Construction of Drainage System November 2001
55Package VII Infrastructure of Resettlement Area
Construction of Embankment November 2001
56Package VII Infrastructure of Resettlement Area
Construction of Treatment Reservoir November
2001
57Package VII Infrastructure of Resettlement Area
- Contract Data and Chronicle
- Name of Contractor Construction Company No. 185
- Contract Amount US 413,000
- Contract Period 8 months (09/2001 04/2002)
- Contract Chronicle
- Contract Signing Date June 09, 2001
- Notice of Proceed August 01, 2001
- Commencement of Works August 31, 2001
- Issuance of Taking-over Certificate April 29,
2002
58Package VII Infrastructure of Resettlement Area
- Construction of Internal Road
- Construction of Embankment
- Construction of Water Supply System
- Construction of Drainage System
- Construction of Electricity System
- Construction of Treatment Reservoir
- Construction of Kindergarten
59Conclusion
- This Presentation is made for purpose to give out
a basic introduction of Haivan Pass Tunnel
Construction Project - Hoping that this Presentation will be of some
help toward better implementation of the Project - Homepage of Project http//haivan.cup.com
- Email hvt-com_at_dng.vnn.vn
60Thank you and Have a good time