Description:

Construction of 187m2 area enclosed car port. Scope of Work ... Tunnel Superintendent Staff Car : 03 units. Patrol Car : 02 units ... – PowerPoint PPT presentation

Number of Views:83
Avg rating:3.0/5.0
Slides: 61
Provided by: VNU5
Category:
Tags: august | monday

less

Transcript and Presenter's Notes

Title: MONDAY 04 AUGUST 2003


1
MONDAY04AUGUST 2003
2
WELCOME
  • HAIVAN PASS TUNNEL CONSTRUCTION PROJECT

3
Table of Contents
  • Background of Project
  • Description of Project
  • Introduction of Each Package
  • Message

4
Background of Project
  • Important role of National Highway No. 1
  • North South longitudinal arterial in the
    country as the most important transport
    infrastructure of the national economy
  • An integral part of international gateway
    East-West Corridor connecting Thailand through
    Laos to Danang Port and Dung Quat Industrial Zone

5
Background of Project
  • The Haivan pass section of the National Highway
    No. 1

6
Background of Project
  • Traffic on Haivan pass
  • Results of Origin-Destination Survey during July
    2002

7
Description of Project
  • The Haivan pass section of the National Highway
    No. 1

Begins at Km. 894000 near Lang Co Town (Thua
ThienHue Province)
Runs across the Haivan Pass peak at with an
elevation of 475m, with a distance of 20.45 km
Ends at Km. 914450 just north of Danang City
Haivan Pass section is a very low standard
highway. In spite of many efforts of Vietnamese
government on upgrading this section, it is still
a dangerous highway to drive and many lives lost
each year in accidents on this section
8
Description of Project
  • Project Outline
  • Estimated Total Amount USD 143,375,000
  • Implementation Program
  • Design stage July 1998 July 1999
  • Tendering stage June 1999 present
  • Construction stage October 2000 April 2005
  • Design Standards TCVN (Vietnam), JHPC (Japan)
    and AASHTO-1994 (USA)
  • Design Life Permanent
  • Design Speed 80 km/h
  • Design Load H30 XB80
  • Construction Contract Packages 9 packages

9
Description of Project
  • Organization Structure
  • Financing Agency
  • Japan Bank for International Cooperation (JBIC)
  • L/A No. VNIV-5, March 26, 1997, Loan Amount JPY
    5.5 billion
  • L/A No. VNVI-5, March 30, 1999, Loan Amount JPY
    10.0 billion
  • L/A No. VNIX-4, March 29, 2002, Loan Amount JPY
    3.359 billion
  • Executing Agency
  • Ministry of Transport and Communication (MOT)
  • Represented by Project Management Unit 85 (PMU85)
  • Consultant
  • Joint Venture of Nippon Koei Co., Ltd (Japan) and
    Louis Berger International Inc. (USA)
  • In association with Transport Engineering Design
    Incorporation (TEDI) Vietnam

10
Description of Project
  • Major Features
  • Total Project Length 12,182 m
  • Number of Traffic Lanes 2 lanes
  • Tunnel Construction
  • Main Tunnel 6,274m long, 2 lanes (3.75m
    wide/each) , 89.0 m2
  • Evacuation Tunnel 6,286m long, 15.5 m2
  • Ventilation Adit 1895m long, 36.2 m2
  • Bridge Construction 8 bridges, 1,653 in total
    length
  • Highway Construction 4,273m in total length

11
Description of Project
  • Contract Packages

12
Description of Project
  • Implementation Program

13
Description of Project
  • Location of Contract Packages

14
Package IA North Tunnel Section
North Tunnel Portal
15
Package IA North Tunnel Section
Front Cut Away Section
16
Package IA North Tunnel Section
Cut Away Section
17
Package IA North Tunnel Section
  • Contract Data and Chronicle
  • Name of Contractor Hazama (Japan) Cienco 6
    (Vietnam) Joint Venture
  • Contract Amount US 43,256,000
  • Contract Period 48 months (10/2000 10/2004)
  • Contract Chronicle
  • Contract Signing Date August 17, 2000
  • Notice of Proceed September 01, 2000
  • Commencement of Works October 01, 2000
  • Location Sta. 1515 to Sta. 5500

18
Package IA North Tunnel Section
19
Package IA North Tunnel Section
  • Scope of Work

A 3,857m long 2-lane main tunnel with 73.26 m2
cross-section
A 3,857m long evacuation tunnel with 15.47 m2
cross-section parallel to the mail tunnel
Two (02) vehicular cross-passageways with 15.47
m2 cross-section, and seven (07) pedestrian
cross-passageways with 8.12 m2 cross-section
A 1,810m long tunnel ventilation adit with 36.20
m2 cross-section
Two 153 meters long each, by-pass type
electrostatic precipitator tunnels (north
central) with 57.69m2 cross-section
A 128 meters 2-lane tunnel approach
A 403 meters long access road to adit building
A 80m2, one-story substation structure (building
only)
A north tunnel portal plaza and a ventilation
adit portal plaza
20
Package IB South Tunnel Section
South Tunnel Portal Area
21
Package IB South Tunnel Section
Front Cut Away Section
22
Package IB South Tunnel Section
South Tunnel Portal
23
Package IB South Tunnel Section
  • Contract Data and Chronicle
  • Name of Contractor Dong Ah (Korea) Song Da
    (Vietnam) Joint Venture
  • Contract Amount US 27,863,000
  • Contract Period 48 months (10/2000 10/2004)
  • Contract Chronicle
  • Contract Signing Date August 17, 2000
  • Notice of Proceed September 01, 2000
  • Commencement of Works October 01, 2000
  • Location Sta. 5500 to Sta. 8125

24
Package IB South Tunnel Section
25
Package IB South Tunnel Section
  • Scope of Work

A 2,417 meters long 2-lane main tunnel with
73.26m2 cross-section
A 2,429m long evacuation tunnel with 15.47 m2
cross-section parallel to the mail tunnel
Two (02) vehicular cross-passageways with 15.47
m2 cross-section, and four (04) pedestrian
cross-passageways with 8.12 m2 cross-section
A 153 meters long by-pass type electrostatic
precipitator tunnels (south) with 57.69m2
cross-section
A 208 meters 2-lane tunnel approach
A 817 meters long access road to high water
reservoir
A 1,400m2, one-story, vehicular maintenance
building
A 58.45 meters long, 2-lane, 2-span
post-tensioned girder bridge
A south tunnel portal plaza
26
Package IIA Lang Co Bridge Section
Lang Co Bridge Area
27
Package IIA Lang Co Bridge Section
Lang Co Bridge
28
Package IIA Lang Co Bridge Section
  • Contract Data and Chronicle
  • Name of Contractor Thang Long Truong Son
    Joint Venture
  • Contract Amount US 4,633,000
  • Contract Period 30 months (07/2001 12/2003)
  • Contract Chronicle
  • Contract Signing Date May 03, 2001
  • Notice of Proceed June 01, 2001
  • Commencement of Works July 01,2001
  • Location Sta. 18650 to Sta. 1515

29
Package IIA Lang Co Bridge Section
  • Scope of Work

Lang Co Bridge, 876.390 meters total length
Two lane roadway, 782.610 meters total length
A northern toll plaza and
Construction of 187m2 area enclosed car port
30
Package IIB Southern Highway Section
General View of Construction Site
31
Package IIB Southern Highway Section
Bridge in Design
32
Package IIB Southern Highway Section
Bridge in Design
33
Package IIB Southern Highway Section
  • Contract Data and Chronicle
  • Name of Contractor Cienco 1 Lung Lo -
    Vinawaco Joint Venture
  • Contract Amount US 3,920,000
  • Contract Period 32 months (07/2001 03/2004)
  • Contract Chronicle
  • Contract Signing Date May 28, 2001
  • Notice of Proceed June 26, 2001
  • Commencement of Works July 26,2001
  • Location Sta. 8125 to Sta. 12047

34
Package IIB Southern Highway Section
  • Scope of Work

Six bridges, totaling 959.390 meters length in
which
Bridge No. 2 334m
Bridge No. 3 33 m
Bridge No. 4 175 m
Bridge No. 5 133 m
Bridge No. 6 150 m
Bridge No. 7 133 m
Two lane roadway, totaling 2963.067 meters length
A southern toll plaza
35
Package III Electrical Works
Medium Voltage Switchboard
36
Package III Electrical Works
SCADA System
37
Package III Electrical Works
RTU used for Power Distribution Monitoring System
38
Package III Electrical Works
  • Contract Data and Chronicle
  • Name of Contractor JO of ABB Kinden - VINAINCO
  • Contract Amount US 20,686,000
  • Contract Period 26 months (02/2003 04/2005)
  • Contract Chronicle
  • Pre-bid Conference April 18, 2001
  • Bid Opening Date June 26, 2001
  • Bid Evaluation June 27 July 11, 2001

39
Package III Electrical Works
  • Scope of Work
  • Electrical Systems
  • Medium Voltage System
  • MV/LV Substations
  • MV Power Distribution Lines
  • Low Voltage Switchboards
  • Low Voltage Switchboards
  • LV Power Distribution Lines
  • Interior Tunnel Lighting System
  • Exterior (Road and Area) Lighting System
  • Power Supply for the Ventilation and Water
    Supply Systems
  • CCTV System
  • Lighting Control System
  • Fire Alarm and Detection System
  • Telecom System
  • Traffic Control System
  • Radio Rebroadcast System
  • Tunnel Power Distribution Monitoring and Control
    System
  • Main Supervised Control and Data Acquisition
    (SCADA) System

40
Package IV Mechanical Works
Ventilation System
41
Package IV Mechanical Works
Jet Fans for Tunnel Ventilation
42
Package IV Mechanical Works
Motor Control Center of Ventilation System
43
Package IV Mechanical Works
  • Contract Data and Chronicle
  • Name of Contractor Matsushita Itochu
    Consortium
  • Contract Amount US 23,055,000
  • Contract Period 36 months (03/2002 03/2005)
  • Contract Chronicle
  • Contract Signing Date January 18, 2002
  • Notice of Proceed February 12, 2002
  • Commencement of Works March 12, 2002
  • Commencement of Works November 01, 2002

44
Package IV Mechanical Works
  • Scope of Work
  • Water Supply and Treatment System consisting of
  • Water catchment and pre-treatment system
  • Pump station and treatment system
  • High water reservoir
  • Fire suppression pipe with hydrans
  • Tunnel Ventilation System consisting of
  • Three (03)sets of electrostatic precipitator
  • Two (02)sets of air supply fans and exhaust
    fans
  • Thirty-two (32) sets of jet fans
  • Ventilation control system
  • Ventilation building

45
Package V 110/22kV Substation and 110kV
Transmission Line
Power Transformer
46
Package V 110/22kV Substation and 110kV
Transmission Line
GIS 110 KV, 2500 KA 40 MA
47
Package V 110/22kV Substation and 110kV
Transmission Line
Diesel Generator 1000 KW
48
Package V 110/22kV Substation and 110kV
Transmission Line
  • Contract Data and Chronicle
  • Name of Contractor Joint Operation of ABB
    Kinden - Vinainco
  • Contract Amount US 7,256,000
  • Contract Period 18 months (12/2001 06/2003)
  • Contract Chronicle
  • Contract Signing Date September 15, 2001
  • Notice of Proceed October 18, 2001
  • Commencement of Works December 21, 2001

49
Package V 110/22kV Substation and 110kV
Transmission Line
  • Scope of Work
  • Construction of 110/22 KV indoor substation and
    tunnel control system
  • Design, manufacture, install, erect and
    commission a 110/22KV Gas Insulated Switchgear
    (GIS) substation and substation control center
  • Design, manufacture, install, erect and
    commission a 110 Transmission Line

50
Package VI Procurement of Maintenance Vehicles
Aerial Platform Truck
51
Package VI Procurement of Maintenance Vehicles
Road Sweeper
52
Package VI Procurement of Maintenance Vehicles
Water Sprinkler Truck
53
Package VI Procurement of Maintenance Vehicles
  • Contract Data and Scope of Work
  • Contract Amount US 2,000,000 (estimated)
  • The equipment and vehicles to be supplied
  • Tunnel Superintendent Staff Car 03 units
  • Patrol Car 02 units
  • Road Maintenance Vehicle (Van Type) 02 units
  • Road Maintenance Vehicle (Station Wagon Type)
    01 unit
  • Water Sprinkler Truck 01 unit
  • Road Sweeper 01 unit
  • Vacuum Cleaner with High Pressure Washer 01
    unit
  • Sign Truck 01 unit
  • Lift Truck 01 unit
  • Aerial Platform Truck 01 unit
  • Multi Service Vehicle with Side Wall Cleaning
    Attachment 01 unit
  • Cargo Truck with 3-ton Crane 01 unit
  • Wrecker Truck 01 unit
  • Ambulance Car (Van Type) 01 unit
  • Fire Fighting Car (Pickup Truck Type) 01 unit
  • Workshop Equipment and Tools 01 lot

54
Package VII Infrastructure of Resettlement Area
Construction of Drainage System November 2001
55
Package VII Infrastructure of Resettlement Area
Construction of Embankment November 2001
56
Package VII Infrastructure of Resettlement Area
Construction of Treatment Reservoir November
2001
57
Package VII Infrastructure of Resettlement Area
  • Contract Data and Chronicle
  • Name of Contractor Construction Company No. 185
  • Contract Amount US 413,000
  • Contract Period 8 months (09/2001 04/2002)
  • Contract Chronicle
  • Contract Signing Date June 09, 2001
  • Notice of Proceed August 01, 2001
  • Commencement of Works August 31, 2001
  • Issuance of Taking-over Certificate April 29,
    2002

58
Package VII Infrastructure of Resettlement Area
  • Scope of Work
  • Construction of Internal Road
  • Construction of Embankment
  • Construction of Water Supply System
  • Construction of Drainage System
  • Construction of Electricity System
  • Construction of Treatment Reservoir
  • Construction of Kindergarten

59
Conclusion
  • This Presentation is made for purpose to give out
    a basic introduction of Haivan Pass Tunnel
    Construction Project
  • Hoping that this Presentation will be of some
    help toward better implementation of the Project
  • Homepage of Project http//haivan.cup.com
  • Email hvt-com_at_dng.vnn.vn

60
Thank you and Have a good time