Title: ODIN Program Office November 21, 2002 Monthly DOCOTRs Telecon


1
ODIN Program OfficeNovember 21, 2002Monthly
DOCOTRs Telecon
2
Agenda
  • Center for Enterprise and Technology Integration
  • Asset Management
  • Attachment R
  • Provance?
  • Catalog
  • IntelliCenter
  • Outreach
  • Tivoli Activities

3
Center for Enterprise Technology Integration
(CETI)
  • Agency Working Groups
  • Participating in Windows and Macintosh
    Teleconferences
  • Support for Asset Management
  • Installation and test of new versions/updates of
    Provance, Catalog, and Asset Insight
  • Local Backup
  • Testing of Tivoli Storage Manager (TSM) Version
    5.2 continues
  • Support to ARC and LaRC
  • Alternatives for Mac OS X
  • Windows 2000 AD Design Support for GSFC
  • Deployment plan submitted to Center CCB

4
CETI (Contd)
  • Mac OS X
  • Revised OS X images sent to Centers
  • Support scripts
  • Virus scanning tools evaluation
  • Training for GSFC staff
  • Leverage for other Centers
  • Product Test and Evaluation
  • Compaq Insight Manager
  • SNORT Intrusion Detection System
  • CIS Benchmark Scoring Tools for Windows 2000
  • Application to future image builds
  • BlackBerry Wireless Email
  • Continuing Activity
  • Intel LANDesk Suite Betas
  • Microsoft .NET Server Beta
  • Images
  • Q16 image builds in progress

5
Asset Management Status Attachment R
  • Attachment R completed and drafts for DOCOTR
    submitted to sites October 28
  • Q16 summary
  • PC desktops meet or exceed rating standards, with
    the exception of the SE2 PC
  • Lightweight laptop is below the rating standard,
    but is highest available on the survey
  • Apple Desktop line-up changed by Apple
  • 100 machine is the iMAC 800 MHz
  • ODIN proposed the Dual 867 MHz as an alternative
    for GP2/SE1 seats. System is at Alterion test
    and certification scores expected 11/2
  • Apple Laptop line-up also changed since the
    market survey
  • Changed mid-October now shipping 867 MHz rather
    than the 800 MHz
  • Q16 starts December 13, 2002

6
Asset Management Provance? Status
  • Provance? 3.2 Maintenance Release M05
  • Installation of M05 plus QR23 on our Production
    system was completed on September 8
  • Summary of 3.2/M05
  • Approval Workflow capability
  • Reports available through the Web
  • History Data available through the Web
  • Improved Search capability
  • We are at QR31 patch level currently
  • Transition to Delivery Order Year-3
  • Completed except for Ames, December 1
  • Transition to Delivery Order 2 for Goddard
  • Most of this work has been completed
  • We are still providing support

7
Asset Management ODIN Catalog Status
  • List of enhancements for ACS-11 was compiled
    through feedback from the Catalog CCB
  • Highlights are as follows
  • Monthly updates for Technical Notes and Graphics
  • Site-specific tech notes will be able to be added
  • Streamlined New Product Request process
  • More fields visible on the Pending Product
    Requests screen
  • Online ECN Validation
  • Will be able to search for ECN by Last Name,
    First Name, Seat Type, Org, etc.
  • Will be able to see details of the seat after
    search is performed
  • Vendor is developing the product and we are
    awaiting an announcement on a delivery date for
    the beta version

8
IntelliCenter Status
  • Remedy Automation
  • Automated interface, via email, between our
    Remedy implementation and the IFM/Marshall
    implementation is complete
  • Implemented redesign for improved problem
    recording, resolution, and closure processes on
    November 1. Conducted Web-ex session to
    demonstrate new resolved/closed process in
    Remedy. Good turn out from site support teams
    enabled smooth implementation
  • Implemented a new Asset Details page/tab on the
    trouble ticket form that provides detailed
    hardware and software details, which is captured
    via Asset Insight, for the specified asset
  • Improve Overall Help Desk Operation and
    Efficiency
  • Completed strategy for handling GRC IFM calls,
    began handling calls Oct 21st
  • Establishing the capability for VPN
    administration _at_ LaRC. Agent training complete,
    tokens acquired, waiting for final approval from
    site of services to be provided
  • Refreshed agent machines to increase speed of
    information retrieval and processing

9
Outreach Status
  • Goddard Delivery Order 2
  • New Customer Satisfaction survey online October
    1, 2002
  • New Section 508-compliant ODIN GSFC Website
    online October 1, 2002
  • ODIN Day on schedule for December 10, 2002
  • Level II Customer Satisfaction Survey Development
    Status
  • Langley in review with customer
  • Goddard in review with customer
  • Dryden mock-up in review with local ACS team
  • Ames development to start first week of December

10
Tivoli Activities
  • Server Configuration Control
  • Working to document current configurations
  • Standardized Reporting to the PMO
  • Participating in Alpha Testing Program for TSM
    operational reporting
  • Developing customized reporting capability
    framework
  • PMO Access to the Centers
  • Started working this with LaRC first
  • Weekly Local Team Reporting Requirements
  • Setting up teleconference account for this
    activity
  • Tivoli Beta Test Site
  • Implementing Enhanced Backup Solution Test
    Environment
  • Investigating Alternatives to Ensure Complete
    Support of Mac OS/X
Write a Comment