Pacific Bridge Presentation - PowerPoint PPT Presentation

1 / 38
About This Presentation
Title:

Pacific Bridge Presentation

Description:

... {BB 11 99 B9 99 B9 BB JB BB JB)Z*9k!9R)9R)JR9FV9Jc=NZBRJBkRJBJJJJJRRRJRRRJR RR) ... ` us ssks c k k b`| {{{  ... – PowerPoint PPT presentation

Number of Views:102
Avg rating:3.0/5.0
Slides: 39
Provided by: markm93
Category:

less

Transcript and Presenter's Notes

Title: Pacific Bridge Presentation


1
Pacific Bridge
Construction Inc.
Gene Steve Copher Sandy, Oregon 503-789-5362
971-563-9401
Power Point Presentation By Mark
Mouser RiverFix NW LLC 503-267-4681
2
Pacific Bridge Construction Inc Modular Bridge
Design
3
Pacific Bridge Construction Inc Modular
Abutment / Steel Girder
4
Wee Burn Creek/Welches Rd Clackamas County DTD
5
Potter Creek / Oregon CitySite 1 / RiverFix NW
6
Potter Creek / Oregon CitySite 1 / Two Day Road
Closure
7
Potter Creek / Oregon CitySite 2 / RiverFix NW
8
Potter Creek / Oregon CitySite 4 / RiverFix NW
9
Bridge Creek / Fossil OR
10
Mill Creek / Hubbard OR
11
Johnson Creek / Damascus OR
12
Hackett Creek / Cherryville OR
13
Every Piece Placed With Trac-Hoe
14
Flexibility In Modules For On-Site Adjustments
15
Utility Conflicts vs Abutments
16
Conflict Resolved With Modular Design
17
Add Wing Wall Blocks On Site To Fit The Project
18
Once The Base Is Laid It Goes Up Fast
19
Shaping The Channel In An Open Bottom Box
20
Shaping The Channel With The Modular Bridge
21
Preparing To Get All Decked Out
22
Deck Slab With Outside Curb Piece
23
Four Inch Conduit Added To Accommodate Utilities
24
The Structure Is Pinned For Stability And Seismic
25
Boards Used For Spacing Which Is Later Grouted
26
Conduit Used To Align For Tensioning Rods
27
Sealing Exposed Steel
28
9,000 lb Grout For The Seams
29
Fasteners Poured In Deck Slab For Guardrail
30
Pre-Cast Modules Means No Fresh Concrete Near
Stream
31
From Multiple Culverts To A Bridge In Days
32
Coho Spawning In Wee Burn Creek One Month After
Completion
33
Potter Creek / Oregon CitySite 4 / RiverFix NW
Project
34
65 Foot Steel Beams AttachedTo The Mono Block
Abutments
35
Pre-Cast Modular AbutmentsAnd Concrete Decking
36
With Steel Beams Pacific BridgesAre
Available to 150 Feet
37
The Future Is Here NowWith Pacific Bridge
Construction
38
Pacific Bridge
Construction Inc.
Gene Steve Copher Sandy, Oregon 503-789-5362
971-563-9401
Power Point Presentation By Mark
Mouser RiverFix NW LLC 503-267-4681
Write a Comment
User Comments (0)
About PowerShow.com