Sin ttulo de diapositiva - PowerPoint PPT Presentation

1 / 18
About This Presentation
Title:

Sin ttulo de diapositiva

Description:

Distributed Energy resources and future electricity networks ... the work done: activities & times, deliverables list & collocation ... – PowerPoint PPT presentation

Number of Views:43
Avg rating:3.0/5.0
Slides: 19
Provided by: adi763
Category:

less

Transcript and Presenter's Notes

Title: Sin ttulo de diapositiva


1

Distributed Energy resources and future
electricity networks
Application of the D20 EnirDGnet model
profitability evaluation of Combined Heat
Power Production to supply an hospital
Eros Tassi (CESI)
2
WP5 socio-economic research commercial
practices business terms
  • program
  • WP5 objectives and features
  • the work done activities times, deliverables
    list collocation
  • deliverables contents, description and uses
  • conclusion
  • Application of the D20 EnirDGnet model, coming
    from WP5
  • profitability evaluation of CHP to supply an
    hospital

3
WP5 socio-economic research commercial
practices business terms
  • Objectives
  • To identify and clarify economic drivers and
    barriers of DG
  • To develop on this basis appropriate business
    practices and models for DG
  • To establish standard business terms (e.g. for
    interconnection agreements)
  • Task Activities
  • task 5.1 to identify, define and clarify
    economic drivers and barriers of DG
  • country surveys on DG economically relevant
    background
  • task 5.2 recommendations for business
    practices
  • case studies on DG economic aspects
  • analysis synthesis of collected data
  • task 5.3 electricity cost model
  • Deliverables
  • D19 report
  • D20 model (working on PC)
  • Times efforts
  • Duration 18 months (from dec2002 to may2004)
  • Effort 27 man months, 29 partners

4
WP5 deliverables
  • D19 (report, free download from www.dgnet.org)
  • Business in Distributed Generation Economic
    Drivers and Barriers,
  • Commercial practices and business terms
  • D20 (model, example shown today)
  • Tool for basic evaluation of business
    profitability
  • in Distributed Generation

5
WP5 contents

6
country surveys list
the country surveys are available
on the Annex A
7
case studies
  • 13 case studies concern DG installations
  • different aspects impacting the economic
    performances are studied
  • they present a large variety of conditions, as
  • technology (PV, FC, gas turbine, microturbine,
    gas turbines, wind, hydro)
  • size (up to some MW)
  • sector application (residential, commercial,
    industrial, different types of demand)
  • point of view (users, ESCOs, utilities)
  • country framework as rules, tariffs, taxes,
    support measures

8
case studies list

the case studies are available on the Annex B
9
the model D20
  • Tool for basic evaluation of business
    profitability in DG,
  • (D20 model running on PC)
  • from
  • demand (electricity, heat/cold)
  • zero and DG supply solutions
  • simulation results (energetic balances on a
    reference period)
  • the model allows to calculate the
    economic/financial behaviour
  • of the DG choice, compared to the zero solution

10
structure of the model D20
  • D20 allows to evaluate and take into account
  • initial capital need evaluation of the investment
    for the DG choice
  • hard costs (specific, general, interconnection
    equipment, control systems, works, buildings)
  • soft costs (design, startup, insurances, fees,
    EIA, permits, administration, other)
  • annual costs revenues comparison between the DG
    and the zero solution
  • electricity heat balances, related bills and
    taxes
  • OM, reliability, support measures
  • cash flows and economic evaluation
  • gross net year profits (interests,
    depreciation, taxes, amortment)
  • business plan
  • discounted cash flows ( by year and cumulative)
  • economic indexes (NPV, IRR, PBP, PI)
  • financing hypothesis
  • The country surveys are an important source to
    find input data

11
an example of application of the model
D20 heat and power supply to a 1000 bed places
hospital in Central Italy study of a
cogenerative solution
12
Electricity, air conditioning excluded
13
Room heating and cooling
14
thermal loads
15
The CHP solution
  • 2 gas engines (each rated1400kW) plus heat
    recovery
  • steam water generator producing heat both from
    exhaust and
  • cooling systems
  • full load working, heat used for services
  • no convenience in adopting absorption chillers,
  • (the heat is used however, also in the summer)
  • important amount of exceeding electricity
    feeding the grid
  • small electricity integration from the grid
  • heat integration by boilers(in winter)
  • after the energy balances calculated by
    simulation...

16
Conclusion (1)
  • Using the D19
  • today and during the transition phase of the
    markets
  • D19 outlines features and mechanisms in which DG
    business moves, considering
  • market structures, tariff and taxes, rules,
    practices on interconnection, gas fuels,
  • business practices, other DG values and
    generally all the aspects relevant to the
    economics.
  • D19 can suggest values to use in D20
  • Towards the unification of the markets
  • D19 issues are previously exploitable for policy
    designers, as
  • survey of mechanisms of already experienced
    economic driver and barriers
  • description of current trends
  • general schemes to perform a fair economic
    scenario for DG
  • Using the D20
  • D20 provides a tool for basic profitability
    calculations

17
Conclusion (2)
  • after DGnet
  • using the collection of the websites of the
    Authorities or other relevant bodies is possible
    to
  • obtain updated references on the relevant frame
    for a given case, but ...
  • it would be very useful to maintain
    systematically the data at their best
  • upgrading the regulatory frameworks
  • adding comments and opinions
  • evolving the form
  • adding countries
  • this operation could have high efficiency (WP5
    already made the big effort)
  • a thematic network reaches an important goal
    when the circulation of info and ideas
  • started today continues after the project

18
Thank you
Write a Comment
User Comments (0)
About PowerShow.com