Aquatic Engineering Solutions - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

Aquatic Engineering Solutions

Description:

Vertical profiling data has never been collected during the ... Zip Tie strength and fixity. Valve Operation. Code Functionality. Experiments To Be Conducted: ... – PowerPoint PPT presentation

Number of Views:35
Avg rating:3.0/5.0
Slides: 10
Provided by: kar151
Category:

less

Transcript and Presenter's Notes

Title: Aquatic Engineering Solutions


1
  • Aquatic Engineering Solutions
  • Chris Cutler, Katie DeChristopher,
  • Shaun Smith, Joe Testa
  • Sponsored by Dr. Lee Kump
  • Geoscience Department
  • April 21, 2005

2
Project Background
  • Background
  • Green Lake is a meromictic lake probably formed
    by glacial waterfalls during
  • deglaciation 1
  • Problem
  • Vertical profiling data has never been collected
    during the winter months (Jan. Mar.) in Green
    Lake due to park restrictions

3
Previous/Current Work
  • Current Data Collection Methods
  • Diving
  • Lowering SONDE and other
  • sampling packages from a boat
  • Problems with These Methods
  • Violates Park Restrictions during winter
    months
  • Not able to gather repeatable data over an
    extended period of time

4
Project Description
  • Goal
  • Design and manufacture a hoist system that will
    lift a SONDE vertically through a 52m deep lake
    once per day during the months of January through
    March while collecting data at specified depths
  • Challenges
  • High Hydrogen Sulfide Content
  • Effects of Temp. on Battery Life
  • Waterproofing Design
  • Balancing Design
  • Stopping at 20 Specified Depths
  • Where to Test Final Product

5
General Design
6
Construction Progress
  • To Do
  • Assemble CO2 System
  • Waterproof Box
  • Place Stops on Rope
  • Complete Frame
  • Completed
  • Most of Frame
  • Buoyancy Tanks
  • CO2 System Layout
  • Some of Gripper Machining and Assembly
  • Code Development
  • Electronics Set-Up

7
Tests/Check Steps
  • Experiments To Be Conducted
  • Watertight Box Check
  • Balanced Design
  • Pool Test for overall functionality
  • Obtain final weight and determine operating
    parameters
  • Completed Experiments
  • Buoyancy of LDPE balls, CO2 Tank, watertight box
  • Battery Life of a 6V 12.5 Amp Hour battery
    connected to a Stamp, running a copy of our
    program
  • Zip Tie strength and fixity
  • Valve Operation
  • Code Functionality

8
References
  • 1 Brunskill and Ludlam, Limnology and
    Oceanography,
    Volume XIV, Number 6, Nov. 1969

9
  • Questions?
Write a Comment
User Comments (0)
About PowerShow.com